FDOT contract T5893 bid tabulation

SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600. Let by Florida DOT on September 30, 2026, Volusia, District 5. 8 bids received; low bid $5,641,959 by Masci General Contractors, Inc.

Owner
Florida DOT
Letting
30 SEP 2026
Pay items
155
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Masci General Contractors, Inc$5,641,959Low
2Halifax Paving, Inc.$5,934,449+5.0%
3DB Civil Construction, LLC$6,265,974+11%
4GPS Civil Construction, Inc$6,392,353+13%
5Watson Civil Construction, Inc.$6,727,353+19%
6C.W. Roberts Contracting, Inc.$7,068,139+25%
7Maer Homes, LLC$8,159,115+45%
8Southland Construction, Inc.$8,777,778+56%
FDOT contract T5893: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Masci General Contractors, Inc2. Halifax Paving, Inc.3. DB Civil Construction, LLC4. GPS Civil Construction, Inc5. Watson Civil Construction, Inc.6. C.W. Roberts Contracting, Inc.
0005Mobilization (0101-1)LS1$260,917$590,590$400,000$630,000$671,000$390,000
0010Maintenance of traffic (0102-1)DA1$115,000$176,500$146,000$100,000$445,000$140,000
0015Pedestrian or bicycle special detour (0102-4-1)SY1$14,540$5,000.00$35,000$20,000$20,000$12,500
0020Traffic control officer (0102-14)HR1,120$90.00$125.00$85.00$90.00$115.00$92.50
0025Work zone sign (0102-60)ED8,565$0.25$0.21$0.40$0.24$0.30$0.25
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,416$43.00$34.00$35.00$40.00$34.00$37.40
0035Temporary barrier, relocate, low profile concrete (0102-71-23)LF996$13.00$16.00$17.00$20.00$16.00$17.60
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED22,825$0.12$0.10$0.12$0.11$0.14$0.10
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD58,297$0.09$0.05$0.10$0.06$0.06$0.05
0050Temporary separator, F&I remove (0102-75-1)LF400$11.00$21.00$25.00$25.00$21.00$23.00
0055Arrow board / advance warning arrow panel (0102-76)ED460$5.00$5.00$6.00$6.00$7.00$5.50
0060Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH794$4.50$5.00$5.00$5.00$5.60$4.20
0065Portable changeable message sign, temporary (0102-99)ED488$11.00$10.00$12.00$12.00$13.00$11.00
0070Temporary signalization and maintenance, intersection (0102-104)ED460$12.00$11.18$60.00$13.00$20.00$12.50
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED460$5.00$4.05$5.00$5.00$7.00$4.50
0080Existing ITS maintenance (0102-112)DA230$190.00$180.04$400.00$200.00$230.00$203.50
0085Type III barricade (0102-115)ED480$0.40$0.25$0.50$1.00$0.30$0.30
0090Sediment barrier (0104-10-3)LF2,225$1.25$1.50$1.50$4.00$1.05$1.15
0095Floating turbidity barrier (0104-11)LF31$25.00$12.00$18.00$20.00$11.00$12.50
0100Inlet protection system (0104-18)EACH27$145.00$160.00$160.00$200.00$150.00$169.50
0105Litter removal (0107-1)ACRE53.50$100.00$95.00$90.00$100.00$95.00$97.50
0110Mowing (0107-2)ACRE53.29$175.00$150.00$90.00$155.00$150.00$154.00
0115Clearing & grubbing (0110-1-1)ACRE1$55,500$150,000$180,000$270,000$150,000$361,300
0120Removal of existing concrete (0110-4-10)SY550$10.00$50.00$25.00$20.00$29.00$45.00
0125Regular excavation (0120-1)CY1,025$6.00$20.00$32.00$11.00$26.00$21.75
0130Subsoil excavation (0120-4)CY3,449.50$9.00$30.00$25.00$16.00$26.00$45.27
0135Embankment (0120-6)CY26,133.40$17.34$22.00$28.00$24.00$30.00$31.60
0140Type B stabilization (0160-4)SY553$12.50$35.00$40.00$30.00$34.00$33.65
0145Optional base, base group 13 (0285-713)SY553$82.50$92.00$109.00$78.00$107.00$85.90
0150Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY19,558$2.50$3.00$4.50$6.00$3.30$6.60
0155Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN1,882.40$141.29$150.00$180.00$186.00$196.00$208.75
0160Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,651.60$155.29$165.00$225.00$220.00$201.00$243.00
0165Inlets, curb, type P-3, <10' (0425-1331)EACH1$11,383$9,300.00$10,000$9,500.00$7,800.00$10,781
0170Inlets, curb, type P-4, <10' (0425-1341)EACH2$11,542$9,500.00$11,000$9,700.00$8,300.00$11,000
0175Inlets, DT bot, type E, >10' (0425-1552)EACH1$8,496.00$11,000$10,000$12,000$16,200$12,750
0180Inlets, DT bot, type E, J bot, <10' (0425-1553)EACH2$33,579$50,000$39,000$43,000$28,000$58,000
0185Inlets, DT bot, type H, J bottom <10' (0425-1583)EACH5$24,923$40,000$35,000$35,000$23,000$46,400
0190Manholes, P-7, <10' (0425-2-41)EACH1$8,129.00$7,400.00$8,000.00$8,000.00$5,400.00$8,600.00
0195Manholes, P-8, partial (0425-2-63)EACH8$6,623.00$5,900.00$5,500.00$6,000.00$4,350.00$6,850.00
0200Manholes, J-8, <10' (0425-2-91)EACH3$14,610$14,000$18,000$14,000$12,500$16,250
0205Manholes, J-8, >10' (0425-2-92)EACH3$25,121$50,000$32,000$45,000$31,000$58,000
0210Modify existing drainage structure (0425-11)EACH1$5,900.00$4,300.00$6,000.00$4,500.00$7,400.00$5,000.00
0215Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF13$334.50$504.00$600.00$150.00$241.00$580.00
0220Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF208$129.35$150.00$190.00$160.00$163.00$174.00
0225Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF16$399.39$479.00$320.00$270.00$340.00$550.00
0230Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF25$347.59$391.00$330.00$280.00$340.00$450.00
0235Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF15$389.95$738.00$850.00$290.00$450.00$850.00
0240Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF268$307.45$283.00$340.00$300.00$375.00$330.00
0245Pipe culvert, opt material, round, 60"S/CD (0430-175160)LF2,819$495.57$316.00$280.00$325.00$379.00$365.00
0250Straight concrete endwalls, single, 0 degrees, round (0430-560100)EACH1$14,950$70,000$45,000$35,000$21,500$81,175
0255Pipe filling and plugging- place out of service (0430-830)CY51.90$359.00$550.00$700.00$600.00$450.00$640.00
0260Concrete curb & gutter, type E (0520-1-7)LF1,419$37.00$30.00$57.00$45.00$53.00$51.00
0265Concrete curb & gutter, type F (0520-1-10)LF637$39.50$35.00$65.00$26.00$55.00$65.00
0270Concrete sidewalk and driveways, 4" thick (0522-1)SY383$69.90$75.00$52.00$65.00$56.00$80.00
0275Concrete sidewalk and driveways, 6" thick (0522-2)SY3,513$99.65$60.00$64.00$73.00$68.00$75.00
0280Detectable warnings (0527-2)SF166$30.00$38.00$35.00$30.00$40.00$22.50
0285Guardrail removal (0536-73)LF1,885$2.50$2.00$3.00$3.00$1.55$3.00
0290Performance turf, sod (0570-1-2)SY20,813$4.00$3.50$4.00$5.60$5.75$5.50
0295Irrigation sleeve, 4" diameter (0591-1400)LF1,203$35.00$30.00$26.00$31.00$35.00$34.75
0300Irrigation sleeve, 6" diameter (0591-1600)LF1,203$47.00$44.00$36.00$45.00$40.00$51.00
0305Painted pavement markings, standard, white, solid, 6" (0710-11101)GM2.50$1,260.00$1,500.00$1,300.00$2,000.00$2.80$1,750.00
0310Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,672$1.05$1.50$1.10$2.00$1.70$1.50
0315Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,732$1.58$1.75$1.80$2.00$2.00$2.00
0320Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.72$525.00$650.00$550.00$800.00$720.00$615.00
0325Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.21$630.00$650.00$650.00$800.00$715.00$710.00
0330Painted pavement markings, standard, white, message or symbol (0710-11160)EACH12$52.50$55.00$60.00$62.00$61.50$46.50
0335Painted pavement markings, standard, white, arrows (0710-11170)EACH63$42.00$45.00$45.00$51.00$51.00$46.25
0340Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM2.08$1,260.00$1,500.00$1,400.00$2,000.00$1,670.00$1,740.00
0345Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF131$1.26$3.00$1.50$4.00$3.35$1.80
0350Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.27$630.00$650.00$650.00$800.00$720.00$712.00
0355Initial contingency amount, DO not bid (0999-25)LS1$60,000$60,000$60,000$60,000$60,000$60,000
0360Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH6$595.35$525.00$700.00$600.00$542.00$810.00
0365Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH3$2,296.35$2,100.00$2,600.00$2,350.00$2,200.00$2,000.00
0370Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$3,119.55$2,600.00$3,600.00$2,950.00$2,700.00$2,350.00
0375Single column ground sign assembly, relocate (0700-1500)EACH2$525.00$100.00$600.00$120.00$104.00$325.00
0380Single column ground sign assembly, remove (0700-1600)EACH10$52.50$50.00$60.00$55.00$52.00$55.50
0385Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH2$8,092.35$4,600.00$9,500.00$5,200.00$4,800.00$6,600.00
0390Delineator, flexible tubular (0705-11-1)EACH2$157.50$150.00$200.00$170.00$155.00$200.00
0395Raised pavement marker, type B (0706-1-3)EACH724$4.20$5.00$5.00$5.50$5.60$5.15
0400Painted pavement markings, surface (0710-90)LS1$8,442.00$10,821$9,000.00$13,000$12,100$13,300
0405Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.12$7,560.00$4,800.00$7,600.00$6,000.00$5,200.00$5,750.00
0410Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,285$5.25$3.50$6.00$4.00$4.00$3.60
0415Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF361$7.35$5.00$8.00$6.00$5.60$4.60
0420Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF258$8.61$7.00$10.00$8.00$7.80$6.20
0425Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.14$3,150.00$2,000.00$3,400.00$2,300.00$2,150.00$1,460.00
0430Thermoplastic, standard, arrow (0711-11170)EACH38$131.25$75.00$140.00$90.00$84.00$98.00
0435Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF105$7.35$5.00$8.00$6.00$5.60$4.70
0440Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.12$3,150.00$2,000.00$3,000.00$2,300.00$2,060.00$1,330.00
0445Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,143$15.75$13.50$16.00$15.00$15.10$14.50
0450Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.53$6,195.00$4,600.00$6,500.00$5,200.00$5,000.00$5,750.00
0455Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.61$2,520.00$2,000.00$2,600.00$2,300.00$2,200.00$1,320.00
0460Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.13$6,195.00$4,500.00$6,500.00$5,200.00$5,000.00$5,730.00
0465Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF998$3.68$3.00$4.00$4.00$3.35$2.50
0470Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF2,445$0.57$0.54$2.50$0.60$0.55$0.60
0475Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH4$1,570.25$1,495.48$1,800.00$1,700.00$1,520.00$1,690.00
0480Light pole complete, remove pole and foundation (0715-69000)EACH8$793.80$756.00$2,300.00$850.00$765.00$850.00
0485Itsfm subsurface documentation- project length (0611-1-1)MI0.39$3,855.61$3,672.00$4,500.00$4,200.00$3,670.00$4,100.00
0490Itsfm location documentation- intersection (0611-2-1)EACH3$2,551.50$2,430.00$1,900.00$2,700.00$2,450.00$2,750.00
0495Conduit, furnish & install, open trench (0630-2-11)LF818$11.76$11.20$20.00$13.00$11.30$12.50
0500Conduit, furnish & install, directional bore (0630-2-12)LF687$24.41$23.25$52.00$26.00$23.50$26.25
0505Conduit, furnish & install, aboveground (0630-2-14)LF75$53.39$50.85$65.00$57.00$51.50$57.50
0510Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$9,362.22$8,916.40$14,000$10,000$9,000.00$10,100
0515Signal cable, remove- intersection (0632-7-6)PI2$2,268.00$2,160.00$1,700.00$2,400.00$2,200.00$2,450.00
0520Fiber optic cable, relocate, underground (0633-1420)LF50$2.84$2.70$4.00$3.00$2.75$3.00
0525Fiber optic connection, install, splice (0633-2-31)EACH12$51.03$48.60$60.00$55.00$49.00$55.00
0530Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH3$1,468.53$1,398.60$1,800.00$1,600.00$1,410.00$1,580.00
0535Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH6$56.70$54.00$70.00$60.00$54.50$61.00
0540Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH3$2,891.70$2,754.00$3,300.00$3,100.00$2,780.00$3,120.00
0545Fiber optic cable locator (0633-6)DA230$191.65$182.52$200.00$205.00$185.00$205.00
0550Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH32$1,235.34$1,176.51$1,350.00$1,300.00$1,200.00$1,330.00
0555Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH3$3,316.44$3,158.51$6,000.00$3,500.00$3,200.00$3,580.00
0560Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$4,942.54$4,707.18$7,400.00$5,300.00$4,770.00$5,325.00
0565Electrical power service, F&I, underground, meter not required (0639-1123)AS1$2,408.05$2,293.38$7,500.00$2,600.00$2,320.00$2,600.00
0570Electrical service wire, & install (0639-2-1)LF244$6.05$5.76$9.00$7.00$5.85$6.50
0575Electrical service wire, (0639-2-6)LF100$0.57$0.54$4.00$1.00$0.55$0.60
0580Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,455.37$2,338.45$2,500.00$2,700.00$2,370.00$2,650.00
0585Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH5$680.40$648.00$350.00$800.00$653.00$730.00
0590Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH2$9,298.80$8,856.00$17,000$10,000$9,000.00$10,000
0595Aluminum signals pole, (0646-1-11)EACH15$2,896.94$2,758.99$3,000.00$3,100.00$2,800.00$3,125.00
0600Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH1$1,721.99$1,639.41$2,500.00$1,800.00$1,660.00$1,850.00
0605Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$64,593$61,518$74,000$70,000$62,000$69,600
0610Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$69,701$66,382$82,000$75,000$67,000$75,050
0615Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$75,014$71,442$90,000$81,000$72,000$80,800
0620Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$90,266$85,968$110,000$97,000$87,000$97,200
0625Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS7$1,697.00$1,616.19$1,500.00$1,800.00$1,650.00$1,825.00
0630Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS2$1,976.57$1,882.45$2,000.00$2,200.00$1,900.00$2,125.00
0635Vehicular traffic signal, furnish & install 5 section cluster, 1 way (0650-1-39)AS1$2,522.76$2,402.63$3,000.00$2,700.00$2,450.00$2,720.00
0640Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH7$645.39$614.66$550.00$700.00$620.00$700.00
0645Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS14$795.22$757.35$800.00$850.00$765.00$860.00
0650Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS1$113.40$108.00$150.00$120.00$109.00$122.00
0655Loop detector inductive, F&I, type 9 (0660-1109)EACH3$267.38$254.65$350.00$290.00$257.00$290.00
0660Loop detector inductive, F&I, type 10 (0660-1110)EACH4$325.62$310.12$400.00$350.00$313.00$350.00
0665Loop assembly, F&I, type F (0660-2106)AS11$1,668.88$1,589.41$1,500.00$1,800.00$1,620.00$1,800.00
0670Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH2$9,644.54$9,185.28$10,200$11,000$9,300.00$10,400
0675Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH9$10,626$10,120$12,000$12,000$10,200$11,450
0680Traffic data detection system- video, furnish and install, cabinet equipment (0660-9-11)EACH2$21,272$20,259$22,000$23,000$20,500$22,900
0685Traffic data detection system- video, furnish and install, ground equipment (0660-9-12)EACH3$10,821$10,306$6,500.00$12,000$10,400$11,650
0690Signal priority and preemption system, furnish and install, detector (0663-1122)EACH1$7,953.75$7,575.63$10,000$8,500.00$7,700.00$8,570.00
0695Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH1$8,826.52$8,406.21$11,000$9,500.00$8,500.00$9,500.00
0700Pedestrian detector, furnish & install, standard (0665-1-11)EACH14$477.65$454.90$400.00$550.00$460.00$515.00
0705Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH1$56.70$54.00$250.00$60.00$54.50$61.00
0710Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$48,079$45,789$50,000$52,000$46,200$51,800
0715Traffic controller assembly, remove controller with (0670-5600)AS2$907.00$864.00$1,700.00$970.00$871.00$975.00
0720Traffic controller, modify (0671-2-40)EACH1$2,721.60$2,592.00$2,200.00$2,900.00$2,620.00$2,930.00
0725Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$2,154.60$2,052.00$400.00$2,300.00$2,100.00$2,320.00
0730Controller accessories, replace existing- furnish and install, load switch (0678-1104)EACH1$154.60$147.24$9,000.00$200.00$150.00$166.00
0735ITS CCTV camera, pressurized, high definition (0682-1163)EACH2$6,117.93$5,826.60$4,000.00$6,500.00$5,900.00$6,590.00
0740Managed field ethernet switch, furnish & install (0684-1-1)EACH3$3,781.89$3,601.80$4,000.00$4,100.00$3,700.00$4,075.00
0745Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH2$13,771$13,115$12,000$15,000$13,300$14,825
0750Remote power management rpmu, furnish and install (0685-2-1)EACH2$718.22$684.02$1,500.00$800.00$690.00$775.00
0755Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH3$1,075.62$1,024.40$1,000.00$1,200.00$1,035.00$1,160.00
0760Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$4,730.41$4,505.15$5,000.00$5,100.00$4,550.00$5,095.00
0765Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,101$3.38$3.22$3.00$4.00$3.30$3.60
0770Load center, F&I, secondary voltage (0715-7-11)EACH1$12,580$11,981$22,000$14,000$12,100$13,550
0775Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH4$750.66$714.91$900.00$800.00$721.00$800.00
FDOT contract T5893: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of September 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy