| 0005 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 990 | $99.08 | $41.00 | $41.00 | $69.23 |
| 0010 | Polymer nosing for bridge expansion joint (0458-2) | CF | 120.40 | $902.87 | $760.00 | $760.00 | $1,001.12 |
| 0015 | Mobilization (0101-1) | LS | 1 | $619,358 | $750,000 | $830,000 | $668,630 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $314,907 | $700,000 | $377,000 | $401,967 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $111,441 | $150,000 | $139,000 | $150,426 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $39,744 | $129,922 | $108,000 | $137,467 |
| 0035 | Commercial material for temporary driveway maintenance (0102-3) | CY | 245.80 | $66.07 | $50.00 | $84.00 | $138.65 |
| 0040 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $40,009 | $15,000 | $49,000 | $12,898 |
| 0045 | Traffic control officer (0102-14) | HR | 300 | $116.89 | $80.00 | $120.00 | $95.85 |
| 0050 | Work zone sign (0102-60) | ED | 20,816 | $0.24 | $0.22 | $0.32 | $0.23 |
| 0055 | Business sign (0102-61) | EACH | 2 | $46.76 | $42.00 | $43.00 | $44.73 |
| 0060 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 2,856 | $0.01 | $0.01 | $41.00 | $41.54 |
| 0065 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 2,100 | $38.96 | $0.10 | $36.00 | $37.28 |
| 0070 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 1,725 | $24.49 | $0.10 | $22.50 | $23.43 |
| 0075 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 675 | $20.04 | $0.10 | $14.70 | $19.17 |
| 0080 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 625 | $16.70 | $0.10 | $8.20 | $15.98 |
| 0085 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 82,944 | $0.11 | $0.10 | $0.14 | $0.11 |
| 0090 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 205,632 | $0.03 | $0.03 | $0.04 | $0.03 |
| 0095 | Arrow board / advance warning arrow panel (0102-76) | ED | 600 | $5.79 | $5.20 | $7.00 | $5.54 |
| 0100 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $929.59 | $0.10 | $845.00 | $889.29 |
| 0105 | Portable changeable message sign, temporary (0102-99) | ED | 714 | $11.32 | $10.17 | $14.00 | $10.83 |
| 0110 | Type III barricade (0102-115) | ED | 121 | $0.42 | $0.38 | $0.50 | $0.40 |
| 0115 | Portable regulatory, sign (0102-150-1) | ED | 1,200 | $4.91 | $4.41 | $6.00 | $4.70 |
| 0120 | Radar speed display unit (0102-150-2) | ED | 1,200 | $4.91 | $4.41 | $6.00 | $4.70 |
| 0125 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 10 | $150.29 | $135.00 | $140.00 | $143.78 |
| 0130 | Sediment barrier (0104-10-3) | LF | 3,861 | $2.23 | $2.00 | $1.30 | $3.68 |
| 0135 | Floating turbidity barrier (0104-11) | LF | 1,203 | $13.92 | $12.50 | $15.00 | $20.90 |
| 0140 | Soil tracking prevention device (0104-15) | EACH | 1 | $10,576 | $0.01 | $5,800.00 | $6,134.54 |
| 0145 | Inlet protection system (0104-18) | EACH | 69 | $178.12 | $160.00 | $175.00 | $193.44 |
| 0150 | Litter removal (0107-1) | ACRE | 299.58 | $38.88 | $80.00 | $45.00 | $37.19 |
| 0155 | Mowing (0107-2) | ACRE | 263.73 | $38.88 | $80.00 | $40.00 | $37.19 |
| 0160 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $36,461 | $614,000 | $104,000 | $170,559 |
| 0165 | Removal of existing concrete (0110-4-10) | SY | 3,290 | $20.87 | $30.00 | $24.00 | $37.67 |
| 0170 | Mailbox, F&I single (0110-7-1) | EACH | 6 | $333.98 | $250.00 | $375.00 | $372.76 |
| 0175 | Regular excavation (0120-1) | CY | 3,442.50 | $22.93 | $18.87 | $10.00 | $22.01 |
| 0180 | Embankment (0120-6) | CY | 3,224.40 | $30.89 | $64.10 | $11.00 | $48.04 |
| 0185 | Type B stabilization (0160-4) | SY | 7,652 | $31.78 | $17.47 | $24.00 | $29.94 |
| 0190 | Optional base, base group 01 (0285-701) | SY | 2,136 | $39.30 | $32.35 | $20.00 | $28.03 |
| 0195 | Optional base, base group 08 (0285-708) | SY | 114 | $135.95 | $208.24 | $94.00 | $77.32 |
| 0200 | Optional base, base group 09 (0285-709) | SY | 2,680 | $50.99 | $50.34 | $33.00 | $53.44 |
| 0205 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 6,636 | $6.26 | $6.50 | $7.50 | $7.88 |
| 0210 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 68,533 | $4.08 | $5.00 | $4.90 | $4.01 |
| 0215 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 4,077 | $4.09 | $7.00 | $4.90 | $5.97 |
| 0220 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 14,220.20 | $153.68 | $125.00 | $190.00 | $187.57 |
| 0225 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 3,055.10 | $251.46 | $170.00 | $305.00 | $231.53 |
| 0230 | Miscellaneous asphalt (0339-1) | TN | 69.90 | $562.90 | $505.00 | $670.00 | $373.58 |
| 0235 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $12,595 | $11,313 | $6,100.00 | $5,591.94 |
| 0240 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 3 | $12,008 | $10,786 | $5,200.00 | $11,008 |
| 0245 | Manhole, adjust (0425-5) | EACH | 5 | $2,522.05 | $2,265.43 | $1,300.00 | $1,099.65 |
| 0250 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 18 | $1,078.17 | $968.47 | $257.00 | $219.84 |
| 0255 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 15 | $1,112.12 | $998.96 | $285.00 | $259.78 |
| 0260 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 6 | $1,687.66 | $1,515.94 | $358.00 | $411.56 |
| 0265 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $4,699.34 | $4,221.18 | $1,871.00 | $3,577.23 |
| 0270 | French drain- aggregate without pipe, 4-4.9’ depth (0443-72-14) | SY | 30 | $1,469.75 | $1,320.20 | $240.00 | $431.22 |
| 0275 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 162 | $86.84 | $98.82 | $74.00 | $70.88 |
| 0280 | Concrete curb & gutter, type E (0520-1-7) | LF | 4,522 | $31.17 | $23.60 | $40.00 | $58.94 |
| 0285 | Concrete curb & gutter, type F (0520-1-10) | LF | 704 | $28.95 | $21.50 | $41.00 | $64.30 |
| 0290 | Concrete curb & gutter, type E with special profile (0520-1-24) | LF | 25 | $31.17 | $45.00 | $58.00 | $88.34 |
| 0295 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 83 | $42.30 | $75.00 | $43.00 | $89.15 |
| 0300 | Shoulder concrete barrier, retaining section (0521-72-41) | LF | 120 | $492.07 | $450.00 | $506.00 | $535.37 |
| 0305 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,631 | $48.98 | $41.10 | $54.00 | $78.69 |
| 0310 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,033 | $69.02 | $62.75 | $74.00 | $123.67 |
| 0315 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 374 | $69.02 | $65.00 | $73.00 | $147.47 |
| 0320 | Detectable warnings (0527-2) | SF | 537 | $35.62 | $32.00 | $36.00 | $29.35 |
| 0325 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 55 | $389.65 | $175.00 | $177.00 | $193.17 |
| 0330 | Bedding stone (0530-74) | TN | 39.50 | $278.32 | $150.00 | $227.00 | $189.74 |
| 0335 | Guardrail -roadway, general (0536-1-1) | LF | 2,867 | $23.38 | $21.84 | $22.10 | $28.13 |
| 0340 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 9 | $584.47 | $419.62 | $425.00 | $366.70 |
| 0345 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 6 | $4,286.11 | $3,598.70 | $3,670.00 | $3,282.80 |
| 0350 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $4,453.11 | $3,726.36 | $3,800.00 | $2,872.14 |
| 0355 | Guardrail removal (0536-73) | LF | 103 | $51.82 | $2.30 | $2.40 | $1.99 |
| 0360 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 7 | $1,697.75 | $1,531.80 | $1,550.00 | $2,009.05 |
| 0365 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 13 | $4,174.79 | $3,435.05 | $3,500.00 | $3,351.51 |
| 0370 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 108 | $94.63 | $36.11 | $21.00 | $97.89 |
| 0375 | Performance turf, sod (0570-1-2) | SY | 26,571 | $3.68 | $3.14 | $5.70 | $3.45 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 3,511 | $4.45 | $4.00 | $4.05 | $4.26 |
| 0385 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 8.93 | $2,003.90 | $1,798.19 | $1,820.00 | $1,915.10 |
| 0390 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.31 | $2,821.04 | $2,468.18 | $2,500.00 | $2,628.67 |
| 0395 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,711 | $1.73 | $1.55 | $1.60 | $1.65 |
| 0400 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 194 | $1.89 | $1.70 | $1.75 | $1.81 |
| 0405 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 396 | $2.00 | $1.80 | $1.85 | $1.92 |
| 0410 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 4.02 | $612.30 | $549.45 | $555.00 | $585.18 |
| 0415 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.55 | $723.63 | $648.82 | $660.00 | $691.00 |
| 0420 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $50.10 | $45.00 | $46.00 | $47.93 |
| 0425 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 87 | $38.96 | $35.00 | $36.00 | $37.28 |
| 0430 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.15 | $2,003.90 | $1,797.55 | $1,820.00 | $1,914.43 |
| 0435 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 455 | $1.89 | $1.70 | $1.75 | $1.81 |
| 0440 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.48 | $723.63 | $650.00 | $660.00 | $692.27 |
| 0445 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $86,793 | $86,793 | $86,793 | $86,793 |
| 0450 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 5.97 | $3,854.66 | $1,581.26 | $1,950.00 | $2,729.23 |
| 0455 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 67 | $701.36 | $630.00 | $602.00 | $670.96 |
| 0460 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 13 | $2,259.95 | $2,030.00 | $2,800.00 | $2,161.99 |
| 0465 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 6 | $2,527.14 | $2,270.00 | $3,300.00 | $2,417.59 |
| 0470 | Single column ground sign assembly, remove (0700-1600) | EACH | 44 | $25.61 | $23.00 | $76.00 | $24.50 |
| 0475 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 35 | $54.55 | $49.00 | $152.00 | $52.19 |
| 0480 | Tubular marker, 36" white post (0704-1-3) | EACH | 1 | $103.53 | $93.00 | $182.00 | $191.70 |
| 0485 | Tubular marker, 36" yellow (0704-1-4) | EACH | 14 | $103.53 | $93.00 | $182.00 | $191.70 |
| 0490 | Object marker, type 1 (0705-10-1) | EACH | 18 | $400.78 | $360.00 | $253.00 | $266.26 |
| 0495 | Raised pavement marker, type B (0706-1-3) | EACH | 1,928 | $4.45 | $4.00 | $4.05 | $4.26 |
| 0500 | Painted pavement markings, surface (0710-90) | LS | 1 | $36,689 | $32,956 | $30,000 | $35,099 |
| 0505 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,426 | $3.28 | $2.95 | $3.00 | $3.14 |
| 0510 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 194 | $4.95 | $4.45 | $4.50 | $4.74 |
| 0515 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 224 | $6.57 | $5.90 | $6.00 | $6.28 |
| 0520 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.55 | $2,560.54 | $2,295.83 | $2,320.00 | $2,445.10 |
| 0525 | Thermoplastic, standard, arrow (0711-11170) | EACH | 81 | $71.25 | $64.00 | $65.00 | $68.16 |
| 0530 | Thermoplastic, standard, yield line (0711-11180) | LF | 262 | $8.91 | $8.00 | $8.10 | $8.52 |
| 0535 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 455 | $4.95 | $4.45 | $4.50 | $4.74 |
| 0540 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.48 | $2,560.54 | $2,300.00 | $2,350.00 | $2,449.54 |
| 0545 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 5 | $241.58 | $217.00 | $220.00 | $231.11 |
| 0550 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 5 | $101.31 | $91.00 | $92.00 | $96.92 |
| 0555 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 4.38 | $7,305.32 | $6,559.01 | $6,700.00 | $6,985.47 |
| 0560 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.29 | $9,740.05 | $8,689.08 | $8,800.00 | $9,254.04 |
| 0565 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 4.02 | $1,826.89 | $1,639.37 | $1,670.00 | $1,745.96 |
| 0570 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 3.54 | $6,696.36 | $6,015.00 | $6,100.00 | $6,406.09 |
| 0575 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.02 | $5,194.55 | $4,241.82 | $4,300.00 | $4,517.73 |
| 0580 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.02 | $6,926.81 | $3,888.75 | $4,000.00 | $4,141.88 |
| 0585 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.19 | $5,194.55 | $4,539.89 | $4,600.00 | $4,835.08 |
| 0590 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.14 | $42,062 | $35,592 | $36,000 | $37,906 |
| 0595 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.14 | $10,516 | $9,582.90 | $9,000.00 | $10,206 |
| 0600 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.14 | $42,062 | $35,592 | $36,000 | $37,906 |
| 0605 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.14 | $10,516 | $9,582.90 | $90,000 | $10,206 |
| 0610 | Preformed/permanent tape, remove (0713-107) | SF | 826 | $2.23 | $2.00 | $2.05 | $2.13 |
| 0615 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,038 | $8.79 | $7.90 | $22.00 | $8.41 |
| 0620 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,671 | $26.61 | $23.90 | $33.00 | $25.45 |
| 0625 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 17 | $1,024.21 | $920.00 | $1,310.00 | $979.82 |
| 0630 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,898.42 | $4,400.00 | $11,400 | $4,686.08 |
| 0635 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,115.22 | $1,900.00 | $3,800.00 | $2,023.54 |
| 0640 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 8,613 | $3.01 | $2.70 | $4.40 | $2.88 |
| 0645 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,191 | $5.23 | $4.70 | $5.95 | $5.01 |
| 0650 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 7,591 | $0.78 | $0.70 | $0.20 | $0.75 |
| 0655 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $21,598 | $19,400 | $21,300 | $20,661 |
| 0660 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $823.82 | $740.00 | $875.00 | $788.11 |
| 0665 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 11 | $2,104.09 | $1,890.00 | $1,425.00 | $2,012.89 |
| 0670 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 8' arm length (0715-61411) | EACH | 11 | $15,719 | $14,120 | $8,800.00 | $15,038 |
| 0675 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 11 | $712.50 | $640.00 | $875.00 | $681.61 |
| 0680 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 11 | $1,001.95 | $900.00 | $890.00 | $958.52 |