| 0005 | Mobilization (0101-1) | LS | 1 | $135,342 | $115,000 | $150,000 | $560,307 | $180,257 |
| 0010 | Mobilization (0101-1) | LS | 1 | $295,712 | $752,827 | $485,000 | $148,873 | $570,760 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $72,193 | $60,000 | $75,000 | $218,560 | $246,636 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $429,629 | $343,715 | $350,000 | $20,000 | $246,636 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $52,086 | $60,000 | $12,500 | $10,000 | $83,901 |
| 0030 | Traffic control officer (0102-14) | HR | 240 | $175.00 | $125.00 | $150.00 | $165.00 | $192.72 |
| 0035 | Work zone sign (0102-60) | ED | 29,705 | $0.25 | $0.20 | $0.35 | $0.40 | $0.38 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 64,320 | $0.12 | $0.10 | $0.15 | $0.25 | $0.16 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 264,000 | $0.04 | $0.05 | $0.05 | $0.10 | $0.10 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,020 | $5.50 | $5.40 | $10.00 | $12.00 | $0.66 |
| 0055 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 73 | $5.00 | $5.40 | $7.00 | $7.50 | $7.35 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 1,905 | $10.50 | $10.75 | $12.00 | $20.00 | $16.17 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 880 | $28.04 | $30.15 | $36.00 | $30.00 | $67.20 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 880 | $7.14 | $7.70 | $36.00 | $155.50 | $67.20 |
| 0075 | Artificial coverings /rolled erosion control products (0104-1) | SY | 8 | $259.86 | $50.00 | $100.00 | $275.00 | $48.18 |
| 0080 | Sediment barrier (0104-10-3) | LF | 1,703 | $5.88 | $3.00 | $2.50 | $5.00 | $6.34 |
| 0085 | Inlet protection system (0104-18) | EACH | 82 | $140.95 | $125.00 | $200.00 | $250.00 | $770.84 |
| 0090 | Litter removal (0107-1) | ACRE | 52.59 | $350.00 | $161.25 | $10.00 | $150.00 | $770.84 |
| 0095 | Mowing (0107-2) | ACRE | 30.39 | $500.00 | $268.75 | $100.00 | $250.00 | $385.43 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $40,425 | $112,625 | $85,000 | $16,837 | $134,258 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 951 | $40.43 | $68.40 | $36.00 | $55.00 | $59.44 |
| 0110 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 76,251 | $3.76 | $2.28 | $4.50 | $5.50 | $5.38 |
| 0115 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,425 | $10.61 | $2.71 | $4.00 | $15.00 | $8.91 |
| 0120 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 6,304.80 | $207.33 | $171.67 | $219.00 | $204.00 | $225.21 |
| 0125 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 6,490.50 | $201.23 | $172.68 | $219.00 | $210.81 | $225.03 |
| 0130 | Manhole, adjust (0425-5) | EACH | 12 | $1,483.13 | $1,680.60 | $2,500.00 | $3,000.00 | $2,181.01 |
| 0135 | Valve boxes, adjust (0425-6) | EACH | 38 | $1,483.13 | $1,165.00 | $1,800.00 | $1,950.00 | $2,181.01 |
| 0140 | Concrete curb & gutter, type F (0520-1-10) | LF | 877 | $44.10 | $95.75 | $125.00 | $110.00 | $64.85 |
| 0145 | Concrete traffic separator, special- variable width (0520-70) | SY | 174 | $131.25 | $604.00 | $250.00 | $591.45 | $292.52 |
| 0150 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 846 | $71.67 | $206.25 | $125.00 | $189.00 | $105.38 |
| 0155 | Detectable warnings (0527-2) | SF | 348 | $40.43 | $46.65 | $35.00 | $49.00 | $59.44 |
| 0160 | Performance turf, sod (0570-1-2) | SY | 759 | $18.67 | $4.30 | $5.00 | $25.00 | $8.67 |
| 0165 | Raised pavement marker, type B (0706-1-3) | EACH | 3,525 | $5.00 | $5.11 | $5.00 | $7.50 | $6.98 |
| 0170 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 17.18 | $1,700.00 | $1,855.00 | $2,000.00 | $3,991.50 | $2,536.70 |
| 0175 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.89 | $2,200.00 | $2,150.00 | $5,000.00 | $4,450.00 | $2,941.10 |
| 0180 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 10,023 | $2.25 | $1.61 | $3.00 | $2.50 | $2.21 |
| 0185 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 987 | $2.00 | $2.14 | $4.00 | $4.03 | $2.93 |
| 0190 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,848 | $3.00 | $3.21 | $6.00 | $5.04 | $4.40 |
| 0195 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 9.16 | $450.00 | $698.75 | $1,200.00 | $3,000.00 | $955.86 |
| 0200 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 3.97 | $785.00 | $913.75 | $2,000.00 | $3,000.00 | $1,249.97 |
| 0205 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 262 | $45.00 | $50.26 | $60.00 | $75.00 | $68.74 |
| 0210 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 10.32 | $1,700.00 | $1,855.00 | $1,600.00 | $3,991.50 | $2,536.70 |
| 0215 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,911 | $2.00 | $2.15 | $3.00 | $4.03 | $2.93 |
| 0220 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 2.15 | $450.00 | $698.75 | $1,600.00 | $3,000.00 | $955.86 |
| 0225 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.21 | $785.00 | $913.75 | $2,500.00 | $3,000.00 | $1,249.97 |
| 0230 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $3,800.00 | $3,800.00 | $3,800.00 | $3,800.00 | $3,800.00 |
| 0235 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,486 | $50,486 | $50,486 | $50,486 | $50,486 |
| 0240 | Tubular marker, 36" yellow (0704-1-4) | EACH | 4 | $405.00 | $435.40 | $100.00 | $500.00 | $595.57 |
| 0245 | Raised pavement marker, type B (0706-1-3) | EACH | 1,248 | $5.00 | $5.11 | $6.00 | $7.50 | $6.98 |
| 0250 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 6 | $7.00 | $9.15 | $30.00 | $100.00 | $12.50 |
| 0255 | Painted pavement markings, surface (0710-90) | LS | 1 | $10,000 | $5,375.00 | $7,500.00 | $3,500.00 | $7,352.76 |
| 0260 | Painted pavement markings, surface (0710-90) | LS | 1 | $42,000 | $53,214 | $60,000 | $253,909 | $72,792 |
| 0265 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.39 | $13,500 | $10,051 | $10,000 | $12,000 | $13,750 |
| 0270 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,341 | $3.50 | $4.20 | $4.00 | $5.50 | $5.73 |
| 0275 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 329 | $8.00 | $5.75 | $5.00 | $7.42 | $7.87 |
| 0280 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 640 | $8.25 | $8.35 | $6.00 | $10.00 | $11.39 |
| 0285 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.35 | $2,800.00 | $2,967.00 | $7,500.00 | $7,413.12 | $4,058.72 |
| 0290 | Thermoplastic, standard, arrow (0711-11170) | EACH | 94 | $80.00 | $89.25 | $150.00 | $140.00 | $122.05 |
| 0295 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 637 | $6.00 | $5.75 | $6.00 | $7.42 | $7.87 |
| 0300 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.40 | $2,800.00 | $2,967.00 | $10,000 | $7,413.12 | $4,058.72 |
| 0305 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,488 | $15.00 | $19.10 | $8.00 | $22.00 | $26.10 |
| 0310 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 40 | $225.00 | $236.50 | $250.00 | $350.00 | $323.52 |
| 0315 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 40 | $160.00 | $120.40 | $100.00 | $210.00 | $164.70 |
| 0320 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.81 | $4,100.00 | $5,800.00 | $7,000.00 | $7,700.00 | $7,933.62 |
| 0325 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.14 | $2,000.00 | $1,780.00 | $5,000.00 | $3,850.00 | $2,433.77 |
| 0330 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.64 | $4,100.00 | $5,800.00 | $7,000.00 | $7,700.00 | $7,933.62 |
| 0335 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.72 | $2,000.00 | $1,780.00 | $5,000.00 | $3,850.00 | $2,433.77 |
| 0340 | Fiber optic cable locator (0633-6) | DA | 220 | $363.82 | $392.00 | $350.00 | $467.28 | $643.37 |
| 0345 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 2 | $1,829.83 | $1,968.00 | $5,000.00 | $3,332.88 | $3,678.92 |
| 0350 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 2 | $232.16 | $250.00 | $1,000.00 | $135.00 | $482.54 |
| 0355 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 29 | $624.80 | $672.00 | $1,250.00 | $836.19 | $1,814.73 |
| 0360 | Loop assembly, F&I, type C (0660-2103) | AS | 31 | $1,327.64 | $1,428.00 | $1,800.00 | $1,538.04 | $2,805.24 |