FDOT contract T4712 bid tabulation
SR 7 (US 441) FROM MP 6.462 TO MP 8.105. Let by Florida DOT on February 26, 2025, Broward, District 4. 5 bids received; low bid $9,098,076 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 227
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $9,098,076 | Low |
| 2 | Horizon Contractors, Inc. | $9,272,077 | +2.0% |
| 3 | Roadway Construction, LLC | $9,625,061 | +6.0% |
| 4 | Jva Engineering Contractor, Inc | $11,068,501 | +22% |
| 5 | Ohla USA Inc | $11,371,421 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Horizon Contractors, Inc. | 3. Roadway Construction, LLC | 4. Jva Engineering Contractor, Inc | 5. Ohla USA Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $300,000 | $450,000 | $962,000 | $780,000 | $541,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $300,000 | $450,000 | $962,000 | $76,000 | $541,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $500,000 | $200,000 | $150,000 | $300,000 | $1,000,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $500,000 | $200,000 | $150,000 | $100,000 | $750,000 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $11,545 | $12,000 | $170,797 | $50,000 | $1.00 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $13,200 | $12,000 | $24,755 | $87,000 | $1.00 |
| 0035 | Traffic control officer (0102-14) | HR | 80 | $88.00 | $85.00 | $80.00 | $80.00 | $100.00 |
| 0040 | Work zone sign (0102-60) | ED | 10,967 | $0.23 | $0.30 | $0.21 | $0.30 | $0.22 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,304 | $36.30 | $38.00 | $0.01 | $41.00 | $34.00 |
| 0050 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 800 | $41.80 | $42.00 | $0.01 | $1.00 | $39.00 |
| 0055 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 2,254 | $17.60 | $20.00 | $0.01 | $20.00 | $17.00 |
| 0060 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 1,465 | $13.20 | $15.00 | $0.01 | $1.00 | $12.25 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 47,572 | $0.12 | $0.15 | $0.11 | $0.15 | $0.12 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 9,054 | $0.08 | $0.10 | $0.07 | $0.10 | $0.08 |
| 0075 | Arrow board / advance warning arrow panel (0102-76) | ED | 683 | $5.83 | $6.00 | $5.30 | $7.00 | $5.50 |
| 0080 | Temporary crash cushion, redirective option (0102-89-1) | LO | 4 | $1,001.00 | $1,200.00 | $910.00 | $1,150.00 | $1,900.00 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 1,431 | $10.40 | $10.00 | $9.45 | $12.00 | $9.50 |
| 0090 | Temporary signalization and maintenance, intersection (0102-104) | ED | 818 | $5.28 | $5.00 | $25.00 | $18.00 | $5.00 |
| 0095 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 409 | $5.28 | $10.00 | $30.00 | $18.00 | $5.00 |
| 0100 | Type III barricade (0102-115) | ED | 1,140 | $0.32 | $0.30 | $0.29 | $0.40 | $0.32 |
| 0105 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.12 | $12,650 | $25,000 | $11,500 | $13,600 | $16,500 |
| 0110 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.20 | $5,500.00 | $25,000 | $2,875.00 | $5,900.00 | $5,800.00 |
| 0115 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.12 | $12,650 | $25,000 | $11,500 | $13,600 | $16,200 |
| 0120 | Sediment barrier (0104-10-3) | LF | 14,088 | $2.75 | $3.00 | $1.57 | $3.70 | $7.50 |
| 0125 | Floating turbidity barrier (0104-11) | LF | 858 | $33.00 | $30.00 | $12.57 | $19.00 | $21.00 |
| 0130 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 60 | $55.00 | $10.00 | $22.96 | $10.00 | $11.00 |
| 0135 | Inlet protection system (0104-18) | EACH | 47 | $132.00 | $100.00 | $145.33 | $180.00 | $525.00 |
| 0140 | Litter removal (0107-1) | ACRE | 659.60 | $0.01 | $20.00 | $0.01 | $230.00 | $68.00 |
| 0145 | Mowing (0107-2) | ACRE | 601.97 | $0.01 | $20.00 | $0.01 | $243.00 | $107.00 |
| 0150 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $5,000.00 | $11,800 | $11,800 | $50,000 |
| 0155 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $5,000.00 | $11,800 | $11,800 | $50,000 |
| 0160 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.10 | $5,000.00 | $11,500 | $11,800 | $50,000 |
| 0165 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.10 | $5,000.00 | $11,500 | $11,800 | $20,000 |
| 0170 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $38,500 | $100,000 | $308,404 | $207,000 | $500,000 |
| 0175 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $38,500 | $100,000 | $144,893 | $30,000 | $130,000 |
| 0180 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $38,500 | $100,000 | $144,893 | $89,000 | $148,000 |
| 0185 | Removal of existing concrete (0110-4-10) | SY | 1,488 | $30.80 | $27.00 | $18.28 | $25.00 | $46.00 |
| 0190 | Tree protection barrier (0110-21) | LF | 6,351 | $11.00 | $6.00 | $2.92 | $3.80 | $3.30 |
| 0195 | Tree root and branch pruning (0110-22) | EACH | 13 | $1,650.00 | $250.00 | $1,200.00 | $1,125.00 | $2,575.00 |
| 0200 | Tree removal (0110-23) | EACH | 8 | $1,512.50 | $500.00 | $1,307.14 | $2,600.00 | $1,575.00 |
| 0205 | Regular excavation (0120-1) | CY | 2,709.40 | $33.00 | $28.00 | $29.98 | $33.00 | $30.00 |
| 0210 | Subsoil excavation (0120-4) | CY | 621 | $26.40 | $22.00 | $53.38 | $55.00 | $33.50 |
| 0215 | Embankment (0120-6) | CY | 6,861.50 | $55.00 | $45.00 | $35.06 | $40.00 | $25.50 |
| 0220 | Type B stabilization (0160-4) | SY | 24,945 | $1.10 | $0.01 | $12.96 | $15.00 | $14.50 |
| 0225 | Optional base, base group 01 (0285-701) | SY | 16,283 | $15.40 | $14.00 | $8.45 | $25.00 | $11.25 |
| 0230 | Optional base, base group 10 (0285-710) | SY | 1,145 | $44.00 | $40.00 | $37.14 | $79.00 | $39.00 |
| 0235 | Optional base, base group 11 (0285-711) | SY | 690 | $56.10 | $50.00 | $61.25 | $94.00 | $102.00 |
| 0240 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 683 | $9.08 | $12.00 | $20.00 | $17.00 | $12.50 |
| 0245 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 49,465 | $3.17 | $4.00 | $4.50 | $4.40 | $2.65 |
| 0250 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 277.60 | $226.00 | $280.00 | $225.00 | $230.00 | $227.88 |
| 0255 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 152.10 | $320.00 | $380.00 | $250.00 | $221.00 | $331.60 |
| 0260 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 1,155 | $182.50 | $220.00 | $150.00 | $186.00 | $196.07 |
| 0265 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 68.20 | $375.00 | $450.00 | $250.00 | $236.00 | $361.18 |
| 0270 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 570.60 | $240.00 | $290.00 | $215.00 | $219.00 | $183.86 |
| 0275 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 3,820.60 | $197.93 | $240.00 | $195.00 | $224.00 | $168.37 |
| 0280 | Miscellaneous asphalt (0339-1) | TN | 179.40 | $233.15 | $300.00 | $269.11 | $280.00 | $321.31 |
| 0285 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 121.60 | $1,085.70 | $1,000.00 | $1,112.03 | $1,165.00 | $1,000.00 |
| 0287 | Conc class IV, bulkhead (0400-4-8) | CY | 32.10 | $949.30 | $2,100.00 | $863.00 | $1,020.00 | $885.00 |
| 0290 | Conc class IV, retaining walls (0400-4-11) | CY | 239 | $1,452.00 | $1,750.00 | $1,339.34 | $1,560.00 | $1,500.00 |
| 0292 | Reinforcing steel- retaining wall (0415-1-3) | LB | 7,518 | $2.75 | $3.00 | $2.50 | $3.00 | $2.70 |
| 0293 | Reinforcing steel- bulkhead (0415-1-8) | LB | 2,907 | $2.75 | $3.00 | $2.50 | $3.00 | $2.70 |
| 0295 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $7,700.00 | $7,000.00 | $10,156 | $9,900.00 | $12,750 |
| 0300 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 2 | $12,100 | $11,000 | $12,958 | $9,205.00 | $10,500 |
| 0305 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 3 | $9,350.00 | $8,500.00 | $10,997 | $11,400 | $10,950 |
| 0310 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $6,930.00 | $6,300.00 | $8,488.61 | $10,800 | $11,950 |
| 0315 | Inlets, DT bot, type J, <10' (0425-1601) | EACH | 1 | $8,800.00 | $8,000.00 | $10,212 | $11,700 | $12,000 |
| 0320 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 1 | $7,700.00 | $7,000.00 | $7,848.27 | $9,000.00 | $12,000 |
| 0325 | Inlets, gutter, type V, partial (0425-1715) | EACH | 2 | $6,160.00 | $5,600.00 | $6,128.68 | $7,200.00 | $14,900 |
| 0330 | Inlets, closed flume (0425-1910) | EACH | 12 | $6,600.00 | $6,000.00 | $7,090.35 | $7,800.00 | $16,200 |
| 0335 | Manholes, P-8, <10' (0425-2-61) | EACH | 2 | $7,700.00 | $7,000.00 | $7,996.98 | $9,900.00 | $9,750.00 |
| 0340 | Manholes, P-8, partial (0425-2-63) | EACH | 2 | $5,500.00 | $5,000.00 | $4,797.46 | $6,800.00 | $9,750.00 |
| 0345 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $6,600.00 | $6,000.00 | $7,998.85 | $14,000 | $9,750.00 |
| 0350 | Manhole, adjust (0425-5) | EACH | 5 | $935.00 | $1,000.00 | $500.00 | $1,000.00 | $1,700.00 |
| 0355 | Valve boxes, adjust (0425-6) | EACH | 5 | $825.00 | $800.00 | $500.00 | $1,000.00 | $1,450.00 |
| 0360 | Pipe culvert optional material, round, 18", gutter drain (0430-173118) | LF | 12 | $220.00 | $190.00 | $368.64 | $332.00 | $235.00 |
| 0365 | Pipe culvert optional material, round, 24", gutter drain (0430-173124) | LF | 634 | $198.00 | $170.00 | $156.11 | $280.00 | $315.00 |
| 0370 | Pipe culvert optional material, round, 30", gutter drain (0430-173130) | LF | 4 | $550.00 | $490.00 | $730.08 | $1,000.00 | $375.00 |
| 0375 | Pipe culvert optional material, round, 36", gutter drain (0430-173136) | LF | 154 | $429.00 | $385.00 | $317.47 | $370.00 | $425.00 |
| 0380 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 36 | $220.00 | $195.00 | $217.44 | $235.00 | $215.00 |
| 0385 | Pipe culvert, optional material, round, 42"SD (0430-174142) | LF | 56 | $572.00 | $515.00 | $368.72 | $440.00 | $265.00 |
| 0390 | Flared end section, concrete, 42" (0430-200-40) | EACH | 1 | $11,000 | $9,200.00 | $14,149 | $9,700.00 | $10,250 |
| 0395 | U-endwall, with grate,index 260/430-010, 1:4 slope, 18" (0430-602125) | EACH | 1 | $11,000 | $9,800.00 | $4,272.32 | $11,300 | $7,800.00 |
| 0400 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 3 | $4,950.00 | $4,300.00 | $5,583.60 | $3,200.00 | $4,700.00 |
| 0405 | Trench drain, standard (0436-1-1) | LF | 182 | $770.00 | $690.00 | $465.67 | $886.00 | $365.00 |
| 0410 | Sheet piling steel, F&I (0455-133-3) | SF | 2,070 | $128.70 | $150.00 | $122.75 | $138.00 | $70.00 |
| 0415 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 284 | $163.90 | $150.00 | $136.90 | $176.00 | $150.00 |
| 0420 | Bullet rail, double rail (0515-4-2) | LF | 217 | $123.20 | $105.00 | $95.71 | $132.00 | $103.00 |
| 0425 | Bollards (0519-78) | EACH | 14 | $825.00 | $750.00 | $1,668.53 | $1,500.00 | $4,600.00 |
| 0430 | Concrete curb & gutter, type E (0520-1-7) | LF | 379 | $44.00 | $40.00 | $44.44 | $108.00 | $65.00 |
| 0435 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,129 | $38.50 | $35.00 | $39.02 | $53.00 | $43.00 |
| 0440 | Concrete curb, type D (0520-2-4) | LF | 10 | $44.00 | $30.00 | $131.51 | $300.00 | $180.00 |
| 0445 | Shoulder gutter- concrete (0520-6) | LF | 113 | $44.00 | $40.00 | $73.96 | $62.00 | $95.00 |
| 0450 | Median concrete barrier, grade-separated (0521-1-12) | LF | 298 | $317.90 | $500.00 | $308.00 | $341.00 | $340.00 |
| 0455 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 217 | $277.20 | $500.00 | $265.05 | $298.00 | $265.00 |
| 0460 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 104 | $426.80 | $500.00 | $415.22 | $458.00 | $425.00 |
| 0465 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,209 | $66.00 | $60.00 | $67.54 | $68.00 | $95.00 |
| 0470 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,056 | $88.00 | $80.00 | $77.71 | $76.00 | $105.00 |
| 0475 | Bus boarding pad- concrete (0522-3) | SY | 197 | $165.00 | $160.00 | $183.72 | $464.00 | $152.00 |
| 0480 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 18 | $99.00 | $130.00 | $224.91 | $231.00 | $253.00 |
| 0485 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 134 | $110.00 | $100.00 | $91.77 | $75.00 | $118.00 |
| 0490 | Concrete slope pavement, 6", reinforced (0524-2-49) | SY | 700 | $143.00 | $130.00 | $108.74 | $185.00 | $105.00 |
| 0495 | Pavers, architectural, (0526-1-2) | SY | 49 | $110.00 | $50.00 | $71.43 | $590.00 | $179.00 |
| 0500 | Detectable warnings (0527-2) | SF | 260 | $38.50 | $30.00 | $34.65 | $41.00 | $47.00 |
| 0505 | Guardrail -roadway, general (0536-1-1) | LF | 1,377 | $30.53 | $24.00 | $21.10 | $33.00 | $22.00 |
| 0510 | Pipe rail for guardrail (0536-6) | LF | 107 | $28.05 | $19.00 | $17.24 | $30.00 | $18.00 |
| 0515 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 2 | $3,795.00 | $3,000.00 | $2,633.73 | $40,000 | $2,720.00 |
| 0520 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 3 | $3,410.00 | $2,000.00 | $1,542.95 | $3,660.00 | $1,600.00 |
| 0525 | Guardrail removal (0536-73) | LF | 1,950 | $1.65 | $3.00 | $2.15 | $1.80 | $2.25 |
| 0530 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 4 | $1,870.00 | $1,300.00 | $1,165.73 | $2,000.00 | $1,200.00 |
| 0535 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 3 | $3,795.00 | $3,200.00 | $2,912.76 | $4,075.00 | $3,000.00 |
| 0540 | Bumper guards, concrete (0542-70) | EACH | 82 | $49.50 | $300.00 | $74.44 | $260.00 | $105.00 |
| 0545 | Fencing, type A, 8.1-10.0', (0550-10150) | LF | 365 | $55.00 | $55.00 | $50.21 | $59.00 | $53.00 |
| 0550 | Fencing, type B, 8.1-10.0', with barbed wire attmt (0550-10251) | LF | 267 | $58.30 | $33.00 | $30.70 | $63.00 | $56.00 |
| 0555 | Fence gate, special type, 12.1-18' opening (0550-60913) | EACH | 1 | $15,070 | $4,500.00 | $4,025.63 | $16,000 | $14,600 |
| 0560 | Fence gate, special type, 12.1-18.0' opening (0550-60923) | EACH | 3 | $17,600 | $4,000.00 | $3,615.90 | $18,900 | $17,000 |
| 0565 | Performance turf, sod (0570-1-2) | SY | 24,815 | $3.41 | $4.00 | $3.10 | $13.00 | $5.00 |
| 0570 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 1 | $1,534.94 | $1,500.00 | $953.00 | $2,950.00 | $1,420.00 |
| 0575 | Raised pavement marker, type B (0706-1-3) | EACH | 1,089 | $5.50 | $6.00 | $5.00 | $5.90 | $4.25 |
| 0580 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.04 | $2,904.00 | $3,000.00 | $2,640.00 | $3,120.00 | $490.00 |
| 0585 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.04 | $726.00 | $1,000.00 | $660.00 | $780.00 | $450.00 |
| 0590 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.68 | $2,904.00 | $3,000.00 | $2,640.00 | $3,120.00 | $1,400.00 |
| 0595 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0600 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $61,678 | $61,678 | $61,678 | $61,678 | $61,678 |
| 0605 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $37,234 | $37,234 | $37,234 | $37,234 | $37,234 |
| 0610 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $28,785 | $28,785 | $28,785 | $28,785 | $28,785 |
| 0615 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $15,427 | $15,427 | $15,427 | $15,427 | $15,427 |
| 0620 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $188.00 | $188.00 | $188.00 | $188.00 | $188.00 |
| 0625 | Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- complete sign assy- single direction (0654-2-21) | AS | 2 | $12,434 | $12,000 | $12,000 | $17,700 | $11,500 |
| 0630 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 107 | $605.00 | $550.00 | $565.25 | $585.00 | $515.00 |
| 0635 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 8 | $1,980.00 | $2,500.00 | $1,697.40 | $2,776.00 | $1,450.00 |
| 0640 | Single column ground sign assembly, relocate (0700-1500) | EACH | 13 | $770.00 | $460.00 | $398.51 | $500.00 | $330.00 |
| 0645 | Single column ground sign assembly, remove (0700-1600) | EACH | 59 | $27.50 | $12.00 | $50.00 | $12.00 | $31.00 |
| 0650 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $16,500 | $6,400.00 | $6,639.97 | $6,850.00 | $3,600.00 |
| 0655 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 2 | $3,321.78 | $3,300.00 | $4,956.56 | $7,320.00 | $5,000.00 |
| 0660 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 3 | $6,708.90 | $6,500.00 | $8,008.44 | $10,040 | $8,100.00 |
| 0665 | Sign panel, relocate, 101-200 SF (0700-3506) | EACH | 2 | $6,708.90 | $3,300.00 | $1,389.06 | $3,526.00 | $2,400.00 |
| 0670 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $165.00 | $80.00 | $104.65 | $83.00 | $105.00 |
| 0675 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 2 | $417.23 | $400.00 | $1,252.33 | $500.00 | $1,300.00 |
| 0680 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 3 | $834.35 | $800.00 | $1,845.61 | $340.00 | $1,900.00 |
| 0685 | Overhead static sign furnish & install, cantilever, 40 FT (0700-4113) | EACH | 1 | $106,691 | $120,000 | $105,121 | $153,600 | $100,000 |
| 0690 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 1 | $113,246 | $130,000 | $111,322 | $183,000 | $110,000 |
| 0695 | Overhead static sign deep foundation removal, cantilever (0700-4612) | EACH | 2 | $2,502.83 | $3,000.00 | $28,074 | $21,300 | $2,500.00 |
| 0700 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 2 | $110.00 | $90.00 | $100.00 | $95.00 | $125.00 |
| 0705 | Tubular marker, 36" yellow (0704-1-4) | EACH | 47 | $247.50 | $100.00 | $95.00 | $112.00 | $220.00 |
| 0710 | Object marker, type 1 (0705-10-1) | EACH | 3 | $330.00 | $440.00 | $395.00 | $467.00 | $210.00 |
| 0715 | Delineator, flexible tubular (0705-11-1) | EACH | 81 | $110.00 | $100.00 | $90.00 | $106.00 | $130.00 |
| 0720 | Raised pavement marker, type B (0706-1-3) | EACH | 813 | $5.50 | $6.00 | $5.00 | $6.00 | $3.20 |
| 0725 | Raised pavement marker, type F internally illuminated (0706-1110) | EACH | 15 | $495.00 | $720.00 | $5.00 | $758.00 | $5.20 |
| 0730 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,731.52 | $10,000 | $5,210.47 | $6,700.00 | $16,000 |
| 0735 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,731.52 | $10,000 | $5,210.47 | $5,900.00 | $11,500 |
| 0740 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,731.52 | $10,000 | $5,210.47 | $5,900.00 | $14,000 |
| 0745 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 709 | $3.30 | $6.00 | $3.00 | $3.55 | $2.25 |
| 0750 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 725 | $4.40 | $6.00 | $4.00 | $4.70 | $3.50 |
| 0755 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 290 | $5.50 | $6.00 | $5.00 | $5.90 | $4.75 |
| 0760 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.18 | $2,420.00 | $2,500.00 | $2,212.29 | $2,600.00 | $475.00 |
| 0765 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 15 | $132.00 | $130.00 | $120.00 | $142.00 | $150.00 |
| 0770 | Thermoplastic, standard, arrow (0711-11170) | EACH | 24 | $88.00 | $90.00 | $80.00 | $95.00 | $75.00 |
| 0775 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,820 | $4.40 | $4.50 | $4.00 | $4.75 | $2.10 |
| 0780 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 399 | $20.90 | $21.00 | $19.00 | $22.50 | $15.00 |
| 0785 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 24 | $286.00 | $300.00 | $260.00 | $307.00 | $500.00 |
| 0790 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 6 | $165.00 | $170.00 | $150.00 | $177.00 | $500.00 |
| 0795 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.10 | $6,969.60 | $7,000.00 | $6,329.97 | $7,500.00 | $5,000.00 |
| 0800 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.71 | $7,260.00 | $8,000.00 | $6,628.01 | $7,800.00 | $8,000.00 |
| 0805 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.05 | $2,420.00 | $3,000.00 | $2,201.07 | $2,600.00 | $3,100.00 |
| 0810 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.18 | $3,484.80 | $4,000.00 | $3,116.07 | $3,750.00 | $6,400.00 |
| 0815 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.25 | $6,969.60 | $7,000.00 | $6,324.76 | $7,500.00 | $6,300.00 |
| 0820 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.52 | $2,420.00 | $3,000.00 | $2,200.00 | $2,600.00 | $3,600.00 |
| 0825 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 296 | $4.40 | $4.50 | $4.00 | $5.00 | $5.20 |
| 0830 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.33 | $59,180 | $60,000 | $53,476 | $63,500 | $26,000 |
| 0835 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.02 | $60,280 | $62,000 | $60,889 | $65,000 | $32,000 |
| 0840 | Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171) | GM | 0.04 | $7,480.00 | $7,500.00 | $6,634.15 | $8,000.00 | $29,000 |
| 0845 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.04 | $7,480.00 | $8,000.00 | $6,634.15 | $8,000.00 | $29,000 |
| 0850 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.04 | $59,180 | $60,000 | $52,488 | $63,600 | $29,000 |
| 0855 | Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371) | GM | 0.04 | $7,480.00 | $8,000.00 | $6,634.15 | $8,000.00 | $29,000 |
| 0860 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.04 | $7,480.00 | $7,500.00 | $6,634.15 | $8,000.00 | $29,000 |
| 0865 | Green-colored pavement markings, bike lane (0714-10) | SF | 680 | $11.00 | $12.00 | $10.00 | $12.00 | $16.00 |
| 0870 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,939 | $43.01 | $43.00 | $25.00 | $24.00 | $40.00 |
| 0875 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 217 | $43.01 | $50.00 | $50.00 | $41.50 | $40.00 |
| 0880 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 23 | $1,519.43 | $1,500.00 | $1,062.00 | $2,100.00 | $1,450.00 |
| 0885 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $9,629.73 | $10,000 | $5,791.00 | $6,100.00 | $8,900.00 |
| 0890 | Electrical service wire, & install (0639-2-1) | LF | 84 | $12.43 | $13.00 | $4.00 | $12.00 | $11.55 |
| 0895 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,885.63 | $3,000.00 | $1,567.00 | $3,500.00 | $2,700.00 |
| 0900 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 10,683 | $3.41 | $3.40 | $2.00 | $3.55 | $3.20 |
| 0905 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $15,079 | $16,000 | $16,194 | $27,200 | $14,000 |
| 0910 | Load center, rework, voltage (0715-7-21) | EACH | 1 | $2,801.26 | $3,000.00 | $3,300.00 | $6,615.00 | $2,600.00 |
| 0915 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $834.35 | $1,000.00 | $686.00 | $6,615.00 | $775.00 |
| 0920 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,494.24 | $1,500.00 | $1,570.00 | $2,950.00 | $1,400.00 |
| 0925 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 12' arm length (0715-61142) | EACH | 2 | $6,937.26 | $7,000.00 | $8,825.00 | $29,530 | $6,500.00 |
| 0930 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $625.79 | $1,000.00 | $2,734.00 | $10,000 | $580.00 |
| 0935 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 4 | $801.79 | $800.00 | $772.00 | $1,772.00 | $750.00 |
| 0940 | Conduit, furnish & install, open trench (0630-2-11) | LF | 929 | $47.63 | $45.00 | $27.00 | $42.00 | $45.00 |
| 0945 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,363 | $47.63 | $46.00 | $35.00 | $59.00 | $45.00 |
| 0950 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $8,880.19 | $8,800.00 | $6,500.00 | $18,400 | $8,200.00 |
| 0955 | Fiber optic cable locator (0633-6) | DA | 409 | $427.35 | $450.00 | $0.01 | $189.00 | $400.00 |
| 0960 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 89 | $1,519.43 | $1,500.00 | $953.00 | $2,000.00 | $1,450.00 |
| 0965 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 11 | $1,996.72 | $1,900.00 | $2,198.00 | $3,660.00 | $1,850.00 |
| 0970 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,924.95 | $8,000.00 | $5,802.00 | $6,142.00 | $7,500.00 |
| 0975 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 1 | $7,459.98 | $7,500.00 | $4,897.00 | $5,900.00 | $6,900.00 |
| 0980 | Electrical service wire, & install (0639-2-1) | LF | 1,167 | $12.43 | $12.50 | $5.00 | $11.80 | $12.00 |
| 0985 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $3,056.02 | $3,000.00 | $1,917.00 | $3,425.00 | $2,900.00 |
| 0990 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $625.79 | $1,000.00 | $699.00 | $1,000.00 | $600.00 |
| 0995 | Aluminum signals pole, (0646-1-11) | EACH | 15 | $2,588.30 | $2,600.00 | $3,000.00 | $2,362.00 | $2,400.00 |
| 1000 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 4 | $2,219.03 | $2,200.00 | $1,430.00 | $2,244.00 | $2,050.00 |
| 1005 | Aluminum signals pole, remove (0646-1-60) | EACH | 11 | $625.79 | $600.00 | $873.00 | $590.00 | $600.00 |
| 1010 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 2 | $61,047 | $70,000 | $65,000 | $97,000 | $57,000 |
| 1015 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 1 | $3,754.30 | $4,000.00 | $7,000.00 | $4,130.00 | $3,500.00 |
| 1020 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 6 | $1,498.53 | $1,500.00 | $1,677.00 | $1,770.00 | $1,400.00 |
| 1025 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $2,568.72 | $2,600.00 | $2,412.00 | $3,550.00 | $2,500.00 |
| 1030 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $208.67 | $300.00 | $524.00 | $118.00 | $200.00 |
| 1035 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 8 | $434.50 | $440.00 | $588.00 | $1,158.00 | $405.00 |
| 1040 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 14 | $788.26 | $800.00 | $911.00 | $1,418.00 | $750.00 |
| 1045 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $1,661.66 | $1,600.00 | $1,897.00 | $2,303.00 | $1,600.00 |
| 1050 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 3 | $104.39 | $105.00 | $137.00 | $118.00 | $100.00 |
| 1055 | Midblock crosswalk: rec rapid flashing beacon, solar, sign assembly- back-back accessible detector (0654-2-28) | AS | 2 | $14,635 | $15,000 | $12,000 | $20,000 | $14,000 |
| 1060 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 1 | $44,310 | $45,000 | $22,352 | $38,400 | $41,000 |
| 1065 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 20 | $251.57 | $250.00 | $494.00 | $413.00 | $240.00 |
| 1070 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 2 | $3,410.55 | $3,400.00 | $3,497.00 | $4,134.00 | $3,200.00 |
| 1075 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 5 | $104.39 | $100.00 | $69.00 | $59.00 | $100.00 |
| 1080 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 1 | $48,891 | $50,000 | $67,827 | $61,425 | $46,000 |
| 1085 | Traffic controller, modify (0671-2-40) | EACH | 4 | $9,178.51 | $9,000.00 | $650.00 | $5,900.00 | $8,500.00 |
| 1090 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 1 | $1,060.40 | $1,000.00 | $1,200.00 | $1,770.00 | $1,000.00 |
| 1095 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 1 | $2,929.41 | $3,000.00 | $3,887.00 | $4,134.00 | $2,800.00 |
| 1100 | Relocate trees and <14' of clear trunk, sabal palm only (0581-1-7) | EACH | 5 | $495.00 | $500.00 | $1,000.00 | $1,000.00 | $1,020.00 |
| 1105 | Relocate trees and palms, >=14' of clear trunk, sabal palm only (0581-1-8) | EACH | 10 | $495.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,050.00 |
| 1110 | Relocate trees and palms, palms, 18.1" or greater DBH, 14.0' or greater of clear trunk (0581-1292) | EACH | 46 | $1,980.00 | $1,500.00 | $2,800.00 | $2,362.00 | $2,850.00 |
| 1115 | Valve boxes, adjust (0425-6) | EACH | 7 | $825.00 | $800.00 | $500.00 | $1,000.00 | $960.00 |
| 1120 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $280.00 | $280.00 | $280.00 | $280.00 | $280.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.