FDOT contract T6606 bid tabulation
SR 953 (LE JEUNE RD / SW 42 AVE) AND SR 976 (BIRD RD / SW... Let by Florida DOT on April 30, 2025, Miami-Dade, District 6. 8 bids received; low bid $3,699,999 by Aum Construction Inc..
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 145
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Aum Construction Inc. | $3,699,999 | Low |
| 2 | Bacallao Construction & Engineering Development, LLC D/B/A B | $3,756,213 | +2.0% |
| 3 | Florida Engineering & Development Corp | $3,781,535 | +2.0% |
| 4 | Weekley Asphalt Paving, Inc. | $3,819,229 | +3.0% |
| 5 | Roadway Construction, LLC | $4,099,217 | +11% |
| 6 | General Asphalt Company, LLC | $4,106,408 | +11% |
| 7 | The Stout Group LLC | $4,585,357 | +24% |
| 8 | Ohla USA Inc | $4,860,460 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Aum Construction Inc. | 2. Bacallao Construction & Engineering Development, LLC D/B/A B | 3. Florida Engineering & Development Corp | 4. Weekley Asphalt Paving, Inc. | 5. Roadway Construction, LLC | 6. General Asphalt Company, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $150,000 | $300,000 | $200,000 | $54,000 | $408,000 | $100,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $150,000 | $75,000 | $160,000 | $66,000 | $408,000 | $130,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $100,000 | $50,000 | $200,000 | $110,350 | $16,131 | $200,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $100,000 | $100,000 | $175,000 | $135,000 | $44,090 | $300,000 |
| 0025 | Traffic control officer (0102-14) | HR | 400 | $75.00 | $85.00 | $90.00 | $88.00 | $80.00 | $88.00 |
| 0030 | Work zone sign (0102-60) | ED | 17,300 | $0.50 | $0.23 | $0.23 | $0.25 | $0.22 | $0.25 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 29,230 | $0.30 | $0.10 | $0.09 | $0.10 | $0.09 | $0.11 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 16,038 | $0.20 | $0.05 | $0.06 | $0.05 | $0.06 | $0.06 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,020 | $10.00 | $5.00 | $4.12 | $5.00 | $4.00 | $5.50 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 1,036 | $15.00 | $10.00 | $9.27 | $10.00 | $9.00 | $11.00 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,400 | $10.00 | $21.10 | $21.73 | $10.00 | $4.00 | $23.21 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,400 | $10.00 | $21.10 | $21.73 | $10.00 | $4.00 | $23.21 |
| 0065 | Type III barricade (0102-115) | ED | 2,390 | $0.50 | $0.25 | $0.24 | $0.25 | $0.23 | $0.28 |
| 0070 | Sediment barrier (0104-10-3) | LF | 952 | $3.50 | $0.01 | $3.14 | $2.45 | $1.62 | $4.40 |
| 0075 | Inlet protection system (0104-18) | EACH | 59 | $250.00 | $50.00 | $95.76 | $160.00 | $137.34 | $198.00 |
| 0080 | Litter removal (0107-1) | ACRE | 24 | $100.00 | $0.01 | $61.35 | $100.00 | $10.00 | $1.10 |
| 0085 | Mowing (0107-2) | ACRE | 24 | $150.00 | $0.01 | $73.37 | $100.00 | $10.00 | $1.10 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $19,281 | $0.01 | $13,390 | $9,900.00 | $2,000.00 | $1.10 |
| 0095 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $12,000 | $0.01 | $6,695.00 | $2,700.00 | $7,000.00 | $1.10 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $15,000 | $41,745 | $29,500 | $40,250 | $111,511 | $27,500 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $10,000 | $90,000 | $29,500 | $77,640 | $111,511 | $5,500.00 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $10,000 | $45,000 | $30,000 | $14,000 | $111,511 | $33,000 |
| 0115 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.02 | $150,000 | $445,000 | $415,976 | $250,000 | $3,117.00 | $1,787,500 |
| 0120 | Removal of existing concrete (0110-4-10) | SY | 1,631 | $30.00 | $30.00 | $43.44 | $60.00 | $32.95 | $76.78 |
| 0125 | Tree protection barrier (0110-21) | LF | 1,010 | $15.00 | $0.01 | $6.50 | $15.00 | $2.74 | $11.00 |
| 0130 | Tree root and branch pruning (0110-22) | EACH | 14 | $2,000.00 | $1,250.00 | $3,605.00 | $1,250.00 | $650.00 | $2,750.00 |
| 0135 | Subsoil excavation (0120-4) | CY | 236.90 | $45.00 | $50.00 | $88.68 | $35.00 | $78.51 | $79.20 |
| 0140 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $5,000.00 | $5,500.00 | $7,523.53 | $15,300 | $1,098.23 | $25,520 |
| 0145 | Type B stabilization (0160-4) | SY | 99 | $20.00 | $3.50 | $27.83 | $30.00 | $66.10 | $54.67 |
| 0150 | Optional base, base group 11 (0285-711) | SY | 99 | $80.00 | $165.00 | $101.58 | $127.06 | $74.36 | $95.26 |
| 0155 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 29,986 | $5.00 | $5.00 | $4.98 | $4.00 | $2.97 | $3.66 |
| 0160 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 16.30 | $800.00 | $225.00 | $532.67 | $750.00 | $285.20 | $787.14 |
| 0165 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 1,385.60 | $240.00 | $225.00 | $223.93 | $218.50 | $210.00 | $218.83 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,095.50 | $250.00 | $225.00 | $220.21 | $217.90 | $210.00 | $208.32 |
| 0175 | Concrete, class I (seal) (0400-1-30) | CY | 2.40 | $2,000.00 | $1,500.00 | $516.61 | $1,600.00 | $293.78 | $2,717.00 |
| 0180 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 2 | $11,500 | $11,500 | $9,705.19 | $22,000 | $9,539.36 | $13,189 |
| 0185 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $7,000.00 | $5,500.00 | $4,390.66 | $8,500.00 | $5,606.19 | $10,186 |
| 0190 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $18,000 | $14,000 | $10,691 | $27,000 | $12,887 | $14,685 |
| 0195 | Manholes, J-7, <10' (0425-2-71) | EACH | 2 | $13,000 | $12,250 | $12,725 | $22,000 | $11,354 | $26,521 |
| 0200 | Manhole, adjust (0425-5) | EACH | 7 | $2,500.00 | $750.00 | $1,022.41 | $1,300.00 | $550.00 | $825.00 |
| 0205 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 71 | $350.00 | $250.00 | $474.99 | $375.00 | $216.92 | $607.20 |
| 0210 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 13 | $450.00 | $325.00 | $325.16 | $500.00 | $374.94 | $697.40 |
| 0215 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 25 | $700.00 | $350.00 | $736.08 | $600.00 | $502.34 | $862.40 |
| 0220 | Pipe filling and plugging- place out of service (0430-830) | CY | 0.10 | $20,000 | $12,050 | $18,385 | $10,000 | $6,724.20 | $50,050 |
| 0225 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,410 | $50.00 | $50.00 | $53.49 | $109.18 | $49.52 | $83.02 |
| 0230 | Concrete curb, type A (0520-2-1) | LF | 88 | $50.00 | $110.00 | $56.38 | $110.00 | $49.56 | $72.67 |
| 0235 | Concrete curb, type D (0520-2-4) | LF | 99 | $50.00 | $110.00 | $49.13 | $110.00 | $45.09 | $75.15 |
| 0240 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 12 | $125.00 | $180.00 | $419.43 | $315.75 | $116.21 | $258.23 |
| 0245 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 411 | $90.00 | $100.00 | $76.45 | $150.60 | $76.23 | $137.48 |
| 0250 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,101 | $100.00 | $120.00 | $103.06 | $188.75 | $101.96 | $177.61 |
| 0255 | Detectable warnings (0527-2) | SF | 1,043 | $35.00 | $40.00 | $35.58 | $71.00 | $30.71 | $69.56 |
| 0260 | Performance turf, sod (0570-1-2) | SY | 338 | $15.00 | $8.00 | $11.36 | $14.00 | $20.18 | $13.20 |
| 0265 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 102 | $30.00 | $40.00 | $36.98 | $45.00 | $33.00 | $39.49 |
| 0270 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,400.00 | $1,200.00 | $1,145.26 | $1,500.00 | $1,800.00 | $1,223.09 |
| 0275 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0280 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $31,131 | $31,131 | $31,131 | $31,131 | $31,131 | $31,131 |
| 0285 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $2,500.00 | $3,000.00 | $2,646.38 | $1,500.00 | $3,200.00 | $2,826.23 |
| 0290 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $1,800.00 | $2,000.00 | $2,051.86 | $1,800.00 | $2,800.00 | $2,191.31 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $13,150 | $13,150 | $13,150 | $13,150 | $13,150 | $13,150 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $700.00 | $700.00 | $700.00 | $700.00 | $700.00 | $700.00 |
| 0305 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $36,150 | $36,150 | $36,150 | $36,150 | $36,150 | $36,150 |
| 0310 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 60 | $650.00 | $500.00 | $509.85 | $510.21 | $510.21 | $561.23 |
| 0315 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 13 | $1,800.00 | $1,750.00 | $2,420.50 | $1,601.58 | $1,601.58 | $1,761.74 |
| 0320 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 4 | $2,000.00 | $2,000.00 | $2,626.50 | $2,142.11 | $2,142.11 | $2,356.32 |
| 0325 | Single column ground sign assembly, remove (0700-1600) | EACH | 65 | $50.00 | $15.00 | $10.30 | $45.00 | $45.00 | $49.50 |
| 0330 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $5,000.00 | $4,000.00 | $4,635.00 | $1,225.00 | $1,225.00 | $1,347.50 |
| 0335 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 12 | $250.00 | $150.00 | $386.25 | $158.20 | $158.20 | $174.02 |
| 0340 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 2 | $350.00 | $150.00 | $597.40 | $252.33 | $252.33 | $277.56 |
| 0345 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $100.00 | $15.00 | $72.10 | $100.00 | $100.00 | $110.00 |
| 0350 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $200.00 | $150.00 | $97.85 | $150.00 | $150.00 | $165.00 |
| 0355 | Tubular marker, 36" yellow (0704-1-4) | EACH | 1 | $350.00 | $150.00 | $97.85 | $220.21 | $220.21 | $242.23 |
| 0360 | Object marker, type 3 (0705-10-3) | EACH | 1 | $500.00 | $550.00 | $406.85 | $285.52 | $285.52 | $314.07 |
| 0365 | Delineator, flexible tubular (0705-11-1) | EACH | 4 | $200.00 | $150.00 | $92.70 | $100.00 | $100.00 | $110.00 |
| 0370 | Raised pavement marker, type B (0706-1-3) | EACH | 852 | $7.50 | $4.00 | $5.15 | $3.60 | $3.85 | $4.40 |
| 0375 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 160 | $10.00 | $3.50 | $2.06 | $3.15 | $5.00 | $5.50 |
| 0380 | Painted pavement markings, surface (0710-90) | LS | 1 | $8,000.00 | $12,500 | $6,634.12 | $12,169 | $4,402.00 | $7,480.00 |
| 0385 | Painted pavement markings, surface (0710-90) | LS | 1 | $6,000.00 | $1.00 | $6,634.12 | $8,817.00 | $3,000.00 | $4,400.00 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $10,000 | $20,000 | $6,634.12 | $8,817.00 | $8,952.00 | $7,150.00 |
| 0395 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,254 | $5.00 | $2.50 | $2.47 | $2.03 | $3.30 | $2.20 |
| 0400 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 308 | $7.00 | $3.50 | $3.71 | $3.00 | $3.95 | $3.85 |
| 0405 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 840 | $9.00 | $5.00 | $4.94 | $4.01 | $6.60 | $4.40 |
| 0410 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.07 | $7,500.00 | $4,500.00 | $2,369.05 | $3,991.50 | $2,601.35 | $2,750.00 |
| 0415 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 11 | $2.50 | $150.00 | $123.60 | $140.00 | $89.00 | $198.00 |
| 0420 | Thermoplastic, standard, arrow (0711-11170) | EACH | 42 | $100.00 | $100.00 | $82.40 | $90.00 | $57.00 | $88.00 |
| 0425 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 291 | $8.00 | $3.50 | $3.71 | $3.00 | $4.60 | $3.85 |
| 0430 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.11 | $7,500.00 | $3,750.00 | $6,526.09 | $3,104.50 | $2,750.00 | $2,750.00 |
| 0435 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,742 | $20.00 | $15.00 | $19.57 | $14.40 | $16.29 | $19.80 |
| 0440 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.98 | $7,500.00 | $4,750.00 | $6,526.08 | $4,320.00 | $5,346.50 | $5,500.00 |
| 0445 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.17 | $8,500.00 | $6,500.00 | $6,797.99 | $5,220.00 | $6,947.53 | $6,600.00 |
| 0450 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.18 | $6,000.00 | $2,750.00 | $2,369.00 | $2,340.00 | $1,330.49 | $2,750.00 |
| 0455 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.07 | $10,000 | $2,200.00 | $2,368.96 | $2,080.00 | $2,873.13 | $6,506.17 |
| 0460 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.47 | $7,000.00 | $4,500.00 | $6,526.08 | $4,320.00 | $5,002.40 | $6,624.88 |
| 0465 | Green-colored pavement markings, bike lane (0714-10) | SF | 587 | $18.00 | $18.00 | $10.30 | $14.80 | $14.37 | $9.90 |
| 0470 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,452 | $30.00 | $38.00 | $34.61 | $26.50 | $33.00 | $36.96 |
| 0475 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 16 | $1,400.00 | $1,250.00 | $1,213.65 | $1,500.00 | $1,800.00 | $1,296.13 |
| 0480 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,500.00 | $3,000.00 | $2,656.16 | $2,000.00 | $3,500.00 | $2,836.68 |
| 0485 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,408 | $3.00 | $3.50 | $2.99 | $3.00 | $5.00 | $3.19 |
| 0490 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 44 | $15.00 | $5.00 | $4.22 | $15.00 | $8.00 | $4.51 |
| 0495 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $25,000 | $15,000 | $13,958 | $17,000 | $21,000 | $14,907 |
| 0500 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 3 | $25,500 | $25,000 | $22,752 | $9,500.00 | $20,500 | $24,298 |
| 0505 | Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366) | EACH | 1 | $10,000 | $9,000.00 | $7,540.01 | $12,000 | $11,850 | $8,052.44 |
| 0510 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 4 | $1,500.00 | $825.00 | $676.61 | $750.00 | $1,700.00 | $722.59 |
| 0515 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,815 | $30.00 | $45.00 | $42.13 | $48.00 | $33.00 | $44.99 |
| 0520 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 5 | $12,000 | $13,000 | $10,582 | $12,000 | $9,500.00 | $11,302 |
| 0525 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 96 | $20.00 | $12.00 | $10.40 | $50.00 | $50.00 | $11.11 |
| 0530 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $500.00 | $800.00 | $692.26 | $1,000.00 | $2,000.00 | $739.31 |
| 0535 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 149 | $1,400.00 | $1,250.00 | $1,145.26 | $1,500.00 | $1,500.00 | $1,223.09 |
| 0540 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,500.00 | $1,750.00 | $1,656.65 | $2,500.00 | $2,980.00 | $1,769.24 |
| 0545 | Pull & splice box, install (0635-2-30) | EACH | 5 | $1,000.00 | $600.00 | $615.63 | $1,200.00 | $850.00 | $657.47 |
| 0550 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 10 | $5,500.00 | $6,000.00 | $5,610.93 | $5,300.00 | $5,400.00 | $5,992.25 |
| 0555 | Electrical power service, remove underground (0639-1620) | AS | 2 | $750.00 | $600.00 | $519.23 | $500.00 | $1,500.00 | $554.51 |
| 0560 | Electrical service wire, & install (0639-2-1) | LF | 1,955 | $8.00 | $12.50 | $10.40 | $10.00 | $10.00 | $11.11 |
| 0565 | Electrical service wire, (0639-2-6) | LF | 637 | $0.50 | $0.13 | $0.10 | $0.50 | $2.00 | $0.11 |
| 0570 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 9 | $1,500.00 | $3,500.00 | $2,874.73 | $2,500.00 | $2,600.00 | $3,070.10 |
| 0575 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 10 | $2,500.00 | $3,000.00 | $2,397.94 | $2,400.00 | $3,100.00 | $2,560.91 |
| 0580 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $750.00 | $650.00 | $519.22 | $500.00 | $1,500.00 | $554.51 |
| 0585 | Aluminum signals pole, (0646-1-11) | EACH | 25 | $2,000.00 | $2,450.00 | $1,980.90 | $1,950.00 | $2,500.00 | $2,115.52 |
| 0590 | Aluminum signals pole, remove (0646-1-60) | EACH | 8 | $250.00 | $650.00 | $519.22 | $300.00 | $500.00 | $554.51 |
| 0595 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $95,000 | $95,000 | $75,454 | $95,000 | $84,400 | $80,582 |
| 0600 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 7 | $1,800.00 | $1,525.00 | $1,233.12 | $1,780.00 | $2,000.00 | $1,316.92 |
| 0605 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 6 | $2,500.00 | $2,350.00 | $1,895.20 | $2,100.00 | $2,800.00 | $2,024.00 |
| 0610 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 9 | $250.00 | $210.00 | $173.14 | $60.00 | $250.00 | $184.91 |
| 0615 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 21 | $1,500.00 | $825.00 | $661.47 | $1,300.00 | $1,750.00 | $706.42 |
| 0620 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $2,000.00 | $1,750.00 | $1,420.37 | $1,800.00 | $2,200.00 | $1,516.90 |
| 0625 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 8 | $250.00 | $100.00 | $86.62 | $50.00 | $500.00 | $92.51 |
| 0630 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 3 | $350.00 | $350.00 | $299.52 | $320.00 | $750.00 | $319.88 |
| 0635 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 8 | $50.00 | $100.00 | $86.62 | $50.00 | $1,000.00 | $92.51 |
| 0640 | Loop assembly, F&I, type F (0660-2106) | AS | 7 | $1,800.00 | $2,350.00 | $1,889.12 | $1,900.00 | $2,450.00 | $2,017.51 |
| 0645 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 13 | $5,500.00 | $5,500.00 | $4,465.36 | $5,000.00 | $4,400.00 | $4,768.83 |
| 0650 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 13 | $3,500.00 | $3,000.00 | $2,404.23 | $4,200.00 | $3,000.00 | $2,567.62 |
| 0655 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 22 | $450.00 | $350.00 | $304.26 | $450.00 | $540.00 | $324.94 |
| 0660 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 8 | $2,000.00 | $1,800.00 | $1,460.44 | $3,100.00 | $3,000.00 | $1,559.69 |
| 0665 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 5 | $50.00 | $100.00 | $86.62 | $50.00 | $250.00 | $92.51 |
| 0670 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 2 | $48,000 | $50,000 | $40,061 | $42,000 | $49,500 | $42,783 |
| 0675 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,500.00 | $850.00 | $692.26 | $500.00 | $3,500.00 | $739.31 |
| 0680 | Network device, cellular (0684-90102) | EACH | 2 | $2,500.00 | $2,000.00 | $1,689.41 | $2,000.00 | $2,400.00 | $1,804.22 |
| 0685 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 1 | $7,500.00 | $9,000.00 | $7,386.54 | $11,500 | $8,450.00 | $7,888.54 |
| 0690 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 13 | $1,200.00 | $1,000.00 | $956.87 | $1,000.00 | $1,000.00 | $1,021.90 |
| 0695 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 18 | $100.00 | $215.00 | $245.24 | $100.00 | $150.00 | $184.91 |
| 0700 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 11 | $3,500.00 | $3,250.00 | $2,633.61 | $3,200.00 | $4,600.00 | $2,812.59 |
| 0705 | Enhanced highway sign AC powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-141111) | EACH | 2 | $12,000 | $8,500.00 | $7,174.26 | $11,500 | $15,500 | $7,661.83 |
| 0710 | Enhanced highway sign AC powered, F&I ground mount, W/beacon, 12-20 SF of static sign panels (0700-141112) | EACH | 2 | $12,000 | $12,000 | $9,942.70 | $12,000 | $16,000 | $10,618 |
| 0715 | Enhanced highway sign AC powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-141131) | EACH | 3 | $15,000 | $15,000 | $13,035 | $13,000 | $15,000 | $13,921 |
| 0720 | Landscape complete- small plants (0580-1-1) | LS | 1 | $9,500.00 | $2,000.00 | $3,090.00 | $3,000.00 | $3,000.00 | $3,135.00 |
| 0725 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $10,000 | $9,500.00 | $8,909.50 | $10,100 | $8,650.00 | $8,256.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.