FDOT contract T4575 bid tabulation
PORT ST LUCIE BLVD FROM S OF PAAR DR TO S OF ALCANTARRA BLVD. Let by Florida DOT on May 28, 2025, St Lucie, District 4. 4 bids received; low bid $25,577,358 by Roadway Construction, LLC.
- Owner
- Florida DOT
- Letting
- 28 MAY 2025
- Pay items
- 232
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Roadway Construction, LLC | $25,577,358 | Low |
| 2 | Halley Engineering Contractors, Inc. | $27,413,297 | +7.0% |
| 3 | Ranger Construction Industries, Inc. | $28,120,395 | +10% |
| 4 | Ohla USA Inc | $29,119,917 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Roadway Construction, LLC | 2. Halley Engineering Contractors, Inc. | 3. Ranger Construction Industries, Inc. | 4. Ohla USA Inc |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $2,557,736 | $2,750,000 | $2,808,000 | $2,900,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $1,221,508 | $3,350,000 | $445,000 | $1,100,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $100.00 | $350,000 | $148,000 | $0.01 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $100.00 | $200,000 | $126,000 | $0.01 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 418 | $52.04 | $45.00 | $146.00 | $0.01 |
| 0030 | Traffic control officer (0102-14) | HR | 56 | $85.00 | $100.00 | $104.00 | $80.00 |
| 0035 | Work zone sign (0102-60) | ED | 292,501 | $0.18 | $0.01 | $0.20 | $0.20 |
| 0040 | Business sign (0102-61) | EACH | 3 | $65.00 | $400.00 | $77.00 | $65.00 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,463 | $0.01 | $50.00 | $59.00 | $0.01 |
| 0050 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 809 | $0.01 | $17.00 | $19.00 | $0.01 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 506,710 | $0.09 | $0.01 | $0.11 | $0.09 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 42,065 | $0.05 | $0.05 | $0.10 | $0.05 |
| 0065 | Temporary separator, F&I remove (0102-75-1) | LF | 322 | $18.50 | $25.00 | $22.00 | $19.00 |
| 0070 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,405 | $5.00 | $5.00 | $5.90 | $5.20 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 15,880 | $8.50 | $0.01 | $10.00 | $9.00 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,748 | $26.70 | $26.70 | $18.00 | $22.00 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,748 | $26.70 | $26.70 | $18.00 | $22.00 |
| 0090 | Type III barricade (0102-115) | ED | 55,344 | $0.23 | $0.01 | $0.30 | $0.25 |
| 0095 | Sediment barrier (0104-10-3) | LF | 10,827 | $1.90 | $3.00 | $5.40 | $4.00 |
| 0100 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 429 | $7.43 | $10.00 | $4.90 | $8.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 49 | $163.53 | $200.00 | $174.00 | $300.00 |
| 0110 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $30,000 | $35,000 | $13,800 | $0.01 |
| 0115 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $8,200.00 | $10,000 | $2,780.00 | $0.01 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $2,504,009 | $2,300,000 | $850,000 | $4,000,000 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 9,445 | $11.02 | $35.00 | $13.50 | $35.00 |
| 0130 | Mailbox, F&I single (0110-7-1) | EACH | 67 | $575.69 | $400.00 | $422.00 | $500.00 |
| 0135 | Regular excavation (0120-1) | CY | 5,609.40 | $27.97 | $25.00 | $17.00 | $16.00 |
| 0140 | Embankment (0120-6) | CY | 15,994.40 | $36.10 | $26.00 | $28.50 | $23.00 |
| 0145 | Type B stabilization (0160-4) | SY | 57,765 | $13.59 | $10.40 | $9.80 | $0.01 |
| 0150 | Optional base, base group 06 (0285-706) | SY | 13,319 | $25.52 | $23.50 | $18.00 | $29.00 |
| 0155 | Optional base, base group 09 (0285-709) | SY | 35,089 | $28.10 | $24.00 | $18.40 | $27.00 |
| 0160 | Optional base, base group 10 (0285-710) | SY | 156 | $71.68 | $159.00 | $122.00 | $100.00 |
| 0165 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 6,557 | $2.75 | $6.40 | $7.80 | $3.00 |
| 0170 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 1,492.90 | $191.00 | $237.00 | $238.00 | $250.00 |
| 0175 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 4,199.80 | $189.00 | $200.00 | $159.00 | $150.00 |
| 0180 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 2,299.10 | $229.00 | $242.00 | $208.00 | $210.00 |
| 0185 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 43 | $875.53 | $1,150.00 | $1,960.00 | $4,800.00 |
| 0190 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 36 | $9,537.20 | $9,240.00 | $8,750.00 | $8,200.00 |
| 0195 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 7 | $9,442.11 | $9,470.00 | $8,910.00 | $8,300.00 |
| 0200 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 22 | $11,697 | $9,760.00 | $13,400 | $12,500 |
| 0205 | Inlets, curb, type J-5, partial (0425-1455) | EACH | 3 | $5,710.05 | $9,290.00 | $8,090.00 | $7,500.00 |
| 0210 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 7 | $14,300 | $11,100 | $17,700 | $16,500 |
| 0215 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 4 | $9,528.41 | $5,910.00 | $11,500 | $10,500 |
| 0220 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 26 | $7,738.20 | $5,880.00 | $7,830.00 | $7,800.00 |
| 0225 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 6 | $11,008 | $11,400 | $11,100 | $10,000 |
| 0230 | Inlets, ditch bottom, type D, J bot, >10' (0425-1544) | EACH | 5 | $14,948 | $12,700 | $18,400 | $17,000 |
| 0235 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 13 | $8,176.18 | $6,500.00 | $8,290.00 | $7,500.00 |
| 0240 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 1 | $8,589.85 | $7,280.00 | $11,100 | $10,500 |
| 0245 | Inlets, gutter, type V, J bot, <10' (0425-1713) | EACH | 10 | $9,762.21 | $7,600.00 | $13,400 | $12,500 |
| 0250 | Inlets, gutter, type V, partial (0425-1715) | EACH | 1 | $6,601.94 | $6,250.00 | $7,570.00 | $7,000.00 |
| 0255 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $8,170.50 | $8,620.00 | $8,290.00 | $7,500.00 |
| 0260 | Manholes, J-7, >10' (0425-2-72) | EACH | 1 | $28,162 | $7,690.00 | $62,600 | $60,000 |
| 0265 | Manholes, J-8, <10' (0425-2-91) | EACH | 8 | $14,721 | $9,420.00 | $14,800 | $15,000 |
| 0270 | Yard drain (0425-10) | EACH | 37 | $1,668.62 | $3,140.00 | $1,920.00 | $1,800.00 |
| 0275 | Pipe culvert, optional material, other shape - ellip/arch, 15"SD (0430-174215) | LF | 916 | $152.34 | $120.00 | $158.00 | $150.00 |
| 0280 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 673 | $84.57 | $100.00 | $137.00 | $130.00 |
| 0285 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 5,071 | $146.82 | $100.00 | $148.00 | $140.00 |
| 0290 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 2,056 | $175.11 | $130.00 | $195.00 | $180.00 |
| 0295 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 1,394 | $221.31 | $160.00 | $248.00 | $230.00 |
| 0300 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 1,373 | $252.12 | $200.00 | $352.00 | $330.00 |
| 0305 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 1,424 | $278.06 | $250.00 | $445.00 | $420.00 |
| 0310 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 307 | $372.43 | $290.00 | $519.00 | $490.00 |
| 0315 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 40 | $385.69 | $370.00 | $665.00 | $620.00 |
| 0320 | Pipe culvert, opt material, round, 60"S/CD (0430-175160) | LF | 116 | $398.10 | $460.00 | $811.00 | $750.00 |
| 0325 | Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242) | LF | 180 | $504.51 | $360.00 | $607.00 | $550.00 |
| 0330 | Pipe culvert, opt material, shape - elip/arch, 48"S/CD (0430-175248) | LF | 342 | $427.88 | $410.00 | $720.00 | $680.00 |
| 0335 | Pipe culvert, opt material, shape - elip/arch, 60"S/CD (0430-175260) | LF | 191 | $490.86 | $610.00 | $1,070.00 | $1,000.00 |
| 0340 | Mitered end section, optional - elliptical / arch, 48" CD (0430-982641) | EACH | 1 | $8,894.37 | $8,540.00 | $13,600 | $12,750 |
| 0345 | Mitered end section, optional other - ellip/arch, 15" SD (0430-984623) | EACH | 45 | $2,408.85 | $1,980.00 | $3,140.00 | $3,000.00 |
| 0350 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 223 | $51.31 | $60.00 | $81.00 | $100.00 |
| 0355 | Concrete curb & gutter, type F (0520-1-10) | LF | 17,272 | $43.41 | $30.00 | $38.70 | $25.00 |
| 0360 | Concrete curb, type D (0520-2-4) | LF | 5,483 | $21.84 | $31.00 | $21.00 | $20.00 |
| 0365 | Concrete curb, ribbon curb (0520-2100) | LF | 114 | $24.72 | $40.00 | $37.00 | $25.00 |
| 0370 | Valley gutter- concrete (0520-3) | LF | 231 | $34.74 | $40.00 | $39.00 | $30.00 |
| 0375 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 8,248 | $51.55 | $75.00 | $80.50 | $70.00 |
| 0380 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 8,056 | $74.71 | $90.00 | $118.00 | $100.00 |
| 0385 | Patterned pavement (0523-3) | SY | 2,187 | $85.00 | $121.00 | $154.00 | $130.00 |
| 0390 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 379 | $88.90 | $73.00 | $124.00 | $95.00 |
| 0395 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 21 | $136.72 | $300.00 | $127.00 | $150.00 |
| 0400 | Detectable warnings (0527-2) | SF | 1,071 | $33.14 | $63.00 | $50.00 | $45.00 |
| 0405 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 53 | $173.78 | $250.00 | $246.00 | $210.00 |
| 0410 | Bedding stone (0530-74) | TN | 38 | $174.65 | $250.00 | $83.00 | $70.00 |
| 0415 | Performance turf, sod (0570-1-2) | SY | 25,085 | $3.84 | $8.00 | $4.20 | $4.50 |
| 0420 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $21,000 | $21,000 | $21,000 | $21,000 |
| 0425 | Raised pavement marker, type B (0706-1-3) | EACH | 2,646 | $4.00 | $4.00 | $5.50 | $4.50 |
| 0430 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 9.78 | $134.93 | $135.00 | $1,530.00 | $1,500.00 |
| 0435 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.81 | $1,485.15 | $1,500.00 | $1,530.00 | $2,100.00 |
| 0440 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 186 | $1.00 | $1.00 | $0.90 | $0.75 |
| 0445 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 266 | $1.35 | $1.35 | $1.30 | $2.00 |
| 0450 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 926 | $1.45 | $1.45 | $1.70 | $2.25 |
| 0455 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 2 | $100.00 | $100.00 | $87.00 | $140.00 |
| 0460 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 19 | $75.00 | $75.00 | $58.00 | $40.00 |
| 0465 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.09 | $1,034.27 | $1,035.00 | $1,530.00 | $1,500.00 |
| 0470 | Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202) | GM | 0.11 | $1,415.09 | $1,500.00 | $1,530.00 | $2,200.00 |
| 0475 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 666 | $1.35 | $1.35 | $1.30 | $2.10 |
| 0480 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.07 | $665.49 | $675.00 | $764.00 | $775.00 |
| 0485 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0490 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 28 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0495 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0500 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $113,023 | $113,023 | $113,023 | $113,023 |
| 0505 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $36,977 | $36,977 | $36,977 | $36,977 |
| 0510 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 45 | $473.00 | $473.00 | $573.00 | $500.00 |
| 0515 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 22 | $1,467.00 | $1,467.00 | $2,200.00 | $1,550.00 |
| 0520 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 5 | $1,100.00 | $1,100.00 | $2,550.00 | $1,150.00 |
| 0525 | Single column ground sign assembly, relocate (0700-1500) | EACH | 10 | $455.00 | $455.00 | $318.00 | $480.00 |
| 0530 | Single column ground sign assembly, remove (0700-1600) | EACH | 30 | $50.00 | $50.00 | $58.00 | $50.00 |
| 0535 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 4 | $7,464.00 | $7,464.00 | $5,780.00 | $7,900.00 |
| 0540 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $4,300.00 | $4,300.00 | $3,120.00 | $4,500.00 |
| 0545 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 16 | $79.00 | $79.00 | $8.10 | $80.00 |
| 0550 | Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111) | EACH | 1 | $13,777 | $13,777 | $9,140.00 | $15,000 |
| 0555 | Enhanced highway sign solar powered, relocate - ground mount (0700-142802) | EACH | 4 | $1,800.00 | $1,800.00 | $5,310.00 | $1,900.00 |
| 0560 | Enhanced highway sign solar powered, remove - mount (0700-142902) | EACH | 2 | $600.00 | $600.00 | $608.00 | $650.00 |
| 0565 | Tubular marker, 36" yellow (0704-1-4) | EACH | 15 | $230.00 | $230.00 | $110.00 | $240.00 |
| 0570 | Object marker, type 1 (0705-10-1) | EACH | 3 | $210.00 | $210.00 | $260.00 | $220.00 |
| 0575 | Raised pavement marker, type B (0706-1-3) | EACH | 1,108 | $4.00 | $4.00 | $5.50 | $4.50 |
| 0580 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 58 | $3.10 | $3.10 | $8.10 | $0.75 |
| 0585 | Painted pavement markings, surface (0710-90) | LS | 1 | $34,538 | $35,000 | $21,600 | $29,000 |
| 0590 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,606 | $1.80 | $1.80 | $3.50 | $2.25 |
| 0595 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 731 | $3.80 | $3.80 | $6.90 | $7.00 |
| 0600 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.39 | $1,776.62 | $1,800.00 | $2,660.00 | $2,350.00 |
| 0605 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 8 | $200.00 | $200.00 | $133.00 | $400.00 |
| 0610 | Thermoplastic, standard, arrow (0711-11170) | EACH | 64 | $100.00 | $100.00 | $110.00 | $85.00 |
| 0615 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 470 | $2.50 | $2.50 | $5.80 | $3.70 |
| 0620 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.28 | $1,774.65 | $1,800.00 | $2,660.00 | $2,400.00 |
| 0625 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,162 | $18.00 | $18.00 | $22.00 | $13.00 |
| 0630 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.91 | $4,498.85 | $4,500.00 | $7,290.00 | $6,500.00 |
| 0635 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.02 | $4,333.33 | $5,200.00 | $7,520.00 | $7,200.00 |
| 0640 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.03 | $1,898.13 | $1,900.00 | $2,660.00 | $2,100.00 |
| 0645 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.52 | $4,548.71 | $4,550.00 | $7,290.00 | $6,500.00 |
| 0650 | Conduit, furnish & install, open trench (0630-2-11) | LF | 5,656 | $16.90 | $16.90 | $17.00 | $14.00 |
| 0655 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,502 | $25.20 | $25.20 | $38.00 | $35.00 |
| 0660 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 64 | $1,845.30 | $1,845.30 | $2,170.00 | $1,700.00 |
| 0665 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 1 | $4,488.70 | $4,488.70 | $5,530.00 | $4,700.00 |
| 0670 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,490.00 | $3,490.00 | $4,080.00 | $2,400.00 |
| 0675 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,848.00 | $2,848.00 | $2,740.00 | $2,300.00 |
| 0680 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 22,194 | $3.30 | $3.30 | $3.40 | $2.50 |
| 0685 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 300 | $4.70 | $4.70 | $6.80 | $5.00 |
| 0690 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $15,392 | $15,392 | $35,300 | $24,000 |
| 0695 | Light pole complete, F&I, standard pole special foundation, 30' mounting height, 12' arm length (0715-62142) | EACH | 38 | $11,355 | $11,355 | $14,300 | $14,000 |
| 0700 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 44 | $855.40 | $855.40 | $1,350.00 | $950.00 |
| 0705 | Light pole complete- special design, F&I, single arm mount, aluminum, 30' (0715-511130) | EACH | 6 | $12,475 | $12,475 | $15,500 | $15,000 |
| 0710 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,070 | $29.40 | $29.40 | $29.00 | $14.00 |
| 0715 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,594 | $33.60 | $33.60 | $43.00 | $35.00 |
| 0720 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $15,821 | $15,821 | $18,900 | $16,000 |
| 0725 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $853.40 | $853.40 | $2,130.00 | $3,500.00 |
| 0730 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 480 | $4.30 | $4.30 | $4.30 | $5.00 |
| 0735 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 6,560 | $5.10 | $5.10 | $4.90 | $6.00 |
| 0740 | Fiber optic cable, relocate, underground (0633-1420) | LF | 500 | $2.50 | $2.50 | $3.50 | $4.25 |
| 0745 | Fiber optic connection, install, splice (0633-2-31) | EACH | 306 | $50.50 | $50.50 | $49.00 | $60.00 |
| 0750 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 3 | $1,507.70 | $1,507.70 | $1,460.00 | $1,770.00 |
| 0755 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 3 | $61.60 | $61.60 | $59.00 | $70.00 |
| 0760 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 2 | $2,443.10 | $2,443.10 | $2,300.00 | $2,800.00 |
| 0765 | Fiber optic cable locator (0633-6) | DA | 874 | $0.01 | $258.00 | $203.00 | $155.00 |
| 0770 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 1,165 | $5.40 | $5.40 | $5.90 | $6.00 |
| 0775 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 71 | $1,143.70 | $1,143.70 | $2,240.00 | $1,900.00 |
| 0780 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 21 | $2,565.50 | $2,565.50 | $3,770.00 | $2,850.00 |
| 0785 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 4 | $4,877.00 | $4,877.00 | $6,840.00 | $4,600.00 |
| 0790 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $6,396.30 | $6,396.30 | $5,940.00 | $4,700.00 |
| 0795 | Electrical service wire, & install (0639-2-1) | LF | 311 | $11.80 | $11.80 | $12.00 | $6.00 |
| 0800 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,506.80 | $2,506.80 | $2,740.00 | $2,400.00 |
| 0805 | Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70) | EACH | 2 | $3,840.20 | $3,840.20 | $9,280.00 | $7,700.00 |
| 0810 | Aluminum signals pole, (0646-1-11) | EACH | 16 | $2,357.30 | $2,357.30 | $3,810.00 | $2,800.00 |
| 0815 | Aluminum signals pole, remove (0646-1-60) | EACH | 2 | $640.10 | $640.10 | $711.00 | $860.00 |
| 0820 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 2 | $51,457 | $51,457 | $76,000 | $59,000 |
| 0825 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 1 | $78,259 | $78,259 | $108,000 | $79,000 |
| 0830 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 3 | $84,922 | $84,922 | $109,000 | $84,000 |
| 0835 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 2 | $106,808 | $106,808 | $85,100 | $89,000 |
| 0840 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 17 | $1,428.60 | $1,428.60 | $2,530.00 | $1,900.00 |
| 0845 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $2,011.80 | $2,011.80 | $3,060.00 | $2,400.00 |
| 0850 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $2,911.80 | $2,911.30 | $3,810.00 | $3,200.00 |
| 0855 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $846.90 | $846.90 | $1,350.00 | $1,150.00 |
| 0860 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 1 | $15,119 | $15,119 | $12,100 | $11,000 |
| 0865 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 1 | $10,405 | $10,405 | $5,330.00 | $7,100.00 |
| 0870 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 16 | $1,834.20 | $1,834.20 | $395.00 | $280.00 |
| 0875 | Traffic controller assembly, F&I, NEMA (0670-5110) | AS | 2 | $55,805 | $55,805 | $69,400 | $52,000 |
| 0880 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $853.40 | $853.40 | $1,070.00 | $2,750.00 |
| 0885 | System control equipment, furnish & install, adaptive control system- NEMA, cabinet equipment (0680-1112) | EACH | 2 | $36,344 | $36,344 | $61,500 | $28,500 |
| 0890 | System control equipment, furnish & install, adaptive control system- NEMA, above ground equipment (0680-1113) | EACH | 8 | $17,472 | $17,472 | $20,200 | $14,000 |
| 0895 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 2 | $6,922.80 | $6,922.80 | $8,140.00 | $9,800.00 |
| 0900 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $2,496.20 | $2,496.20 | $11,700 | $14,000 |
| 0905 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 2 | $18,318 | $18,318 | $16,400 | $29,500 |
| 0910 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 8 | $3,178.20 | $3,178.20 | $5,070.00 | $3,100.00 |
| 0915 | Landscape complete- large plants (0580-1-2) | LS | 1 | $239,500 | $105,000 | $327,000 | $135,000 |
| 0920 | Irrigation system (0590-70) | LS | 1 | $435,000 | $234,000 | $515,000 | $440,000 |
| 0925 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $225,624 | $225,624 | $225,624 | $225,624 |
| 0930 | Utility pipe, F&I, PVC pipe, 2.5", project 431752-5-56-01 (1050-10103) | LF | 1,835 | $33.44 | $43.00 | $56.00 | $50.00 |
| 0935 | Utility pipe,remove & dispose, 2- 4.9" (1050-16002) | LF | 4,872 | $13.85 | $4.50 | $23.00 | $20.00 |
| 0940 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 1,183 | $11.73 | $4.80 | $23.00 | $20.00 |
| 0945 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 6,172 | $15.76 | $6.05 | $25.00 | $22.00 |
| 0950 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31202) | LF | 1,135 | $35.46 | $41.00 | $63.00 | $55.00 |
| 0955 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31203) | LF | 690 | $42.76 | $44.00 | $220.00 | $190.00 |
| 0960 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31204) | LF | 1,186 | $43.76 | $46.00 | $218.00 | $190.00 |
| 0965 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 1,202 | $55.67 | $67.00 | $243.00 | $210.00 |
| 0970 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 2,126 | $69.99 | $79.00 | $213.00 | $185.00 |
| 0975 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212) | LF | 1,850 | $112.13 | $110.00 | $248.00 | $215.00 |
| 0980 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 16" (1050-31216) | LF | 2,550 | $155.10 | $120.00 | $255.00 | $220.00 |
| 0985 | Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108) | EACH | 84 | $1,104.66 | $520.00 | $1,300.00 | $1,150.00 |
| 0990 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 44 | $2,422.00 | $2,280.00 | $3,070.00 | $2,700.00 |
| 0995 | Utility fittings, ductile iron, furnish & install elbow, (1055-51116) | EACH | 48 | $3,362.20 | $3,360.00 | $4,200.00 | $3,600.00 |
| 1000 | Utility fittings, ductile iron, furnish & install tee, 8" (1055-51208) | EACH | 1 | $1,257.28 | $1,630.00 | $1,560.00 | $1,400.00 |
| 1005 | Utility fittings, ductile iron, furnish & install tee, 16" (1055-51216) | EACH | 7 | $3,588.91 | $5,930.00 | $4,280.00 | $3,750.00 |
| 1010 | Utility fittings, ductile iron, furnish & install reducer, 8" (1055-51308) | EACH | 6 | $1,227.92 | $1,220.00 | $1,340.00 | $1,150.00 |
| 1015 | Utility fittings, ductile iron, furnish & install union, 8" (1055-51408) | EACH | 4 | $1,153.38 | $1,430.00 | $1,350.00 | $1,180.00 |
| 1020 | Utility fittings, ductile iron, furnish & install union, 12" (1055-51412) | EACH | 8 | $1,914.82 | $1,820.00 | $2,530.00 | $2,200.00 |
| 1025 | Utility fittings, ductile iron, furnish & install union, 16" (1055-51416) | EACH | 21 | $3,113.96 | $2,930.00 | $4,170.00 | $3,600.00 |
| 1030 | Utility fittings, ductile iron, furnish & install Y, 8" (1055-51608) | EACH | 1 | $2,932.63 | $3,000.00 | $3,360.00 | $2,900.00 |
| 1035 | Utility fittings, ductile iron, furnish & install cross, 8" (1055-51808) | EACH | 2 | $2,526.55 | $2,420.00 | $2,960.00 | $2,600.00 |
| 1040 | Utility fittings, ductile iron, furnish & install cross, (1055-51816) | EACH | 5 | $4,733.07 | $5,140.00 | $5,560.00 | $4,800.00 |
| 1045 | Utility fixture, valve/meter box, furnish & install, 1" (1080-21100) | EACH | 4 | $1,506.00 | $1,440.00 | $2,760.00 | $2,400.00 |
| 1050 | Utility fixture, valve/meter box, furnish & install, 1.5" (1080-21101) | EACH | 30 | $4,263.51 | $1,940.00 | $3,350.00 | $2,900.00 |
| 1055 | Utility fixture, valve/meter box, furnish & install, 2" (1080-21102) | EACH | 3 | $2,757.51 | $2,360.00 | $3,890.00 | $3,400.00 |
| 1060 | Utility fixture, valve/meter box, adjust (1080-21500) | EACH | 97 | $836.92 | $760.00 | $621.00 | $540.00 |
| 1065 | Utility fixture- tapping saddle/sleeve, furnish & 8" (1080-23108) | EACH | 1 | $15,682 | $15,500 | $19,600 | $17,000 |
| 1070 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 2 | $25,773 | $22,800 | $33,400 | $29,000 |
| 1075 | Utility fixture- tapping saddle/sleeve, furnish & 16" (1080-23116) | EACH | 1 | $19,876 | $19,000 | $27,100 | $24,000 |
| 1080 | Utility fixture, valve assembly, furnish and install, 2" (1080-24102) | EACH | 6 | $3,426.86 | $2,440.00 | $2,620.00 | $2,300.00 |
| 1085 | Utility fixture, valve assembly, furnish and install, 3" (1080-24103) | EACH | 26 | $4,534.88 | $2,170.00 | $2,750.00 | $2,400.00 |
| 1090 | Utility fixture, valve assembly, furnish and install, 4" (1080-24104) | EACH | 8 | $3,405.33 | $2,220.00 | $2,830.00 | $2,500.00 |
| 1095 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 15 | $2,996.06 | $2,890.00 | $3,310.00 | $2,900.00 |
| 1100 | Utility fixture, valve assembly, furnish and install, 8" (1080-24108) | EACH | 8 | $4,983.29 | $4,320.00 | $4,190.00 | $3,650.00 |
| 1105 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 4 | $7,018.90 | $5,890.00 | $7,550.00 | $6,600.00 |
| 1110 | Utility fixture, valve assembly, furnish and install, 16" (1080-24116) | EACH | 13 | $12,535 | $10,400 | $13,400 | $11,600 |
| 1115 | Utility fixture- blowoff assembly, furnish and install, (1080-25102) | EACH | 3 | $3,225.17 | $2,400.00 | $4,370.00 | $3,800.00 |
| 1120 | Utility fixture, vac/air furnish & install 2" (1080-26102) | EACH | 3 | $12,050 | $10,600 | $16,200 | $14,000 |
| 1125 | Utility fixture- line stop assembly, furnish and install, (1080-27108) | EACH | 5 | $6,818.55 | $16,300 | $22,100 | $19,300 |
| 1130 | Utility fixture- line stop assembly, furnish and install, (1080-27112) | EACH | 10 | $9,968.54 | $21,600 | $27,000 | $23,500 |
| 1135 | Utility fixture- line stop assembly, furnish and install, (1080-27116) | EACH | 21 | $21,864 | $34,100 | $42,900 | $37,000 |
| 1140 | Utility fixture- sample point, furnish & install, 6" (1080-32106) | EACH | 20 | $701.75 | $680.00 | $1,630.00 | $1,450.00 |
| 1145 | Utility fixture- sample point, furnish & install, 8" (1080-32108) | EACH | 6 | $1,692.09 | $760.00 | $1,630.00 | $1,450.00 |
| 1150 | Utility fixture- sample point, furnish & install, 12" (1080-32112) | EACH | 8 | $1,529.33 | $790.00 | $1,750.00 | $1,550.00 |
| 1155 | Utility fixture- sample point, furnish & install, 16" (1080-32116) | EACH | 20 | $1,847.51 | $820.00 | $1,800.00 | $1,550.00 |
| 1160 | Fire hydrant, F&I, standard, 2 hose, 6" (1644-112-06) | EACH | 6 | $12,024 | $5,630.00 | $9,600.00 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.