FDOT contract T4575 bid tabulation

PORT ST LUCIE BLVD FROM S OF PAAR DR TO S OF ALCANTARRA BLVD. Let by Florida DOT on May 28, 2025, St Lucie, District 4. 4 bids received; low bid $25,577,358 by Roadway Construction, LLC.

Owner
Florida DOT
Letting
28 MAY 2025
Pay items
232
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Roadway Construction, LLC$25,577,358Low
2Halley Engineering Contractors, Inc.$27,413,297+7.0%
3Ranger Construction Industries, Inc.$28,120,395+10%
4Ohla USA Inc$29,119,917+14%
FDOT contract T4575: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Roadway Construction, LLC2. Halley Engineering Contractors, Inc.3. Ranger Construction Industries, Inc.4. Ohla USA Inc
0005Mobilization (0101-1)LS1$2,557,736$2,750,000$2,808,000$2,900,000
0010Maintenance of traffic (0102-1)DA1$1,221,508$3,350,000$445,000$1,100,000
0015Special detour- temporary pavement (0102-2200)SY1$100.00$350,000$148,000$0.01
0020Special detour- temporary earthwork/base (0102-2300)CY1$100.00$200,000$126,000$0.01
0025Commercial material for temporary driveway maintenance (0102-3)CY418$52.04$45.00$146.00$0.01
0030Traffic control officer (0102-14)HR56$85.00$100.00$104.00$80.00
0035Work zone sign (0102-60)ED292,501$0.18$0.01$0.20$0.20
0040Business sign (0102-61)EACH3$65.00$400.00$77.00$65.00
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,463$0.01$50.00$59.00$0.01
0050Temporary barrier, relocate, low profile concrete (0102-71-23)LF809$0.01$17.00$19.00$0.01
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED506,710$0.09$0.01$0.11$0.09
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD42,065$0.05$0.05$0.10$0.05
0065Temporary separator, F&I remove (0102-75-1)LF322$18.50$25.00$22.00$19.00
0070Arrow board / advance warning arrow panel (0102-76)ED2,405$5.00$5.00$5.90$5.20
0075Portable changeable message sign, temporary (0102-99)ED15,880$8.50$0.01$10.00$9.00
0080Temporary signalization and maintenance, intersection (0102-104)ED1,748$26.70$26.70$18.00$22.00
0085Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,748$26.70$26.70$18.00$22.00
0090Type III barricade (0102-115)ED55,344$0.23$0.01$0.30$0.25
0095Sediment barrier (0104-10-3)LF10,827$1.90$3.00$5.40$4.00
0100Staked turbidity barrier- nylon reinforced PVC (0104-12)LF429$7.43$10.00$4.90$8.00
0105Inlet protection system (0104-18)EACH49$163.53$200.00$174.00$300.00
0110Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$30,000$35,000$13,800$0.01
0115Monitor existing structures- vibration monitoring (0108-2)LS1$8,200.00$10,000$2,780.00$0.01
0120Clearing & grubbing (0110-1-1)ACRE1$2,504,009$2,300,000$850,000$4,000,000
0125Removal of existing concrete (0110-4-10)SY9,445$11.02$35.00$13.50$35.00
0130Mailbox, F&I single (0110-7-1)EACH67$575.69$400.00$422.00$500.00
0135Regular excavation (0120-1)CY5,609.40$27.97$25.00$17.00$16.00
0140Embankment (0120-6)CY15,994.40$36.10$26.00$28.50$23.00
0145Type B stabilization (0160-4)SY57,765$13.59$10.40$9.80$0.01
0150Optional base, base group 06 (0285-706)SY13,319$25.52$23.50$18.00$29.00
0155Optional base, base group 09 (0285-709)SY35,089$28.10$24.00$18.40$27.00
0160Optional base, base group 10 (0285-710)SY156$71.68$159.00$122.00$100.00
0165Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY6,557$2.75$6.40$7.80$3.00
0170Superpave asphaltic conc, traffic B (0334-1-12)TN1,492.90$191.00$237.00$238.00$250.00
0175Superpave asphaltic conc, traffic C (0334-1-13)TN4,199.80$189.00$200.00$159.00$150.00
0180Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN2,299.10$229.00$242.00$208.00$210.00
0185Concrete class NS, gravity index 400-011 (0400-0-11)CY43$875.53$1,150.00$1,960.00$4,800.00
0190Inlets, curb, type P-5, <10' (0425-1351)EACH36$9,537.20$9,240.00$8,750.00$8,200.00
0195Inlets, curb, type P-6, <10' (0425-1361)EACH7$9,442.11$9,470.00$8,910.00$8,300.00
0200Inlets, curb, type J-5, <10' (0425-1451)EACH22$11,697$9,760.00$13,400$12,500
0205Inlets, curb, type J-5, partial (0425-1455)EACH3$5,710.05$9,290.00$8,090.00$7,500.00
0210Inlets, curb, type J-6, <10' (0425-1461)EACH7$14,300$11,100$17,700$16,500
0215Inlets, curb, type 7, <10' (0425-1471)EACH4$9,528.41$5,910.00$11,500$10,500
0220Inlets, DT bot, type D, <10' (0425-1541)EACH26$7,738.20$5,880.00$7,830.00$7,800.00
0225Inlets, ditch bottom, type D, J bot, <10' (0425-1543)EACH6$11,008$11,400$11,100$10,000
0230Inlets, ditch bottom, type D, J bot, >10' (0425-1544)EACH5$14,948$12,700$18,400$17,000
0235Inlets, DT bot, type D, modify (0425-1549)EACH13$8,176.18$6,500.00$8,290.00$7,500.00
0240Inlets, gutter, type V, <10' (0425-1711)EACH1$8,589.85$7,280.00$11,100$10,500
0245Inlets, gutter, type V, J bot, <10' (0425-1713)EACH10$9,762.21$7,600.00$13,400$12,500
0250Inlets, gutter, type V, partial (0425-1715)EACH1$6,601.94$6,250.00$7,570.00$7,000.00
0255Manholes, P-8, <10' (0425-2-61)EACH4$8,170.50$8,620.00$8,290.00$7,500.00
0260Manholes, J-7, >10' (0425-2-72)EACH1$28,162$7,690.00$62,600$60,000
0265Manholes, J-8, <10' (0425-2-91)EACH8$14,721$9,420.00$14,800$15,000
0270Yard drain (0425-10)EACH37$1,668.62$3,140.00$1,920.00$1,800.00
0275Pipe culvert, optional material, other shape - ellip/arch, 15"SD (0430-174215)LF916$152.34$120.00$158.00$150.00
0280Pipe culvert,optional material,round, 12"S/CD (0430-175112)LF673$84.57$100.00$137.00$130.00
0285Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF5,071$146.82$100.00$148.00$140.00
0290Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF2,056$175.11$130.00$195.00$180.00
0295Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF1,394$221.31$160.00$248.00$230.00
0300Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF1,373$252.12$200.00$352.00$330.00
0305Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF1,424$278.06$250.00$445.00$420.00
0310Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF307$372.43$290.00$519.00$490.00
0315Pipe culvert, opt material, round, 54"S/CD (0430-175154)LF40$385.69$370.00$665.00$620.00
0320Pipe culvert, opt material, round, 60"S/CD (0430-175160)LF116$398.10$460.00$811.00$750.00
0325Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242)LF180$504.51$360.00$607.00$550.00
0330Pipe culvert, opt material, shape - elip/arch, 48"S/CD (0430-175248)LF342$427.88$410.00$720.00$680.00
0335Pipe culvert, opt material, shape - elip/arch, 60"S/CD (0430-175260)LF191$490.86$610.00$1,070.00$1,000.00
0340Mitered end section, optional - elliptical / arch, 48" CD (0430-982641)EACH1$8,894.37$8,540.00$13,600$12,750
0345Mitered end section, optional other - ellip/arch, 15" SD (0430-984623)EACH45$2,408.85$1,980.00$3,140.00$3,000.00
0350Pipe handrail - guiderail, aluminum (0515-1-2)LF223$51.31$60.00$81.00$100.00
0355Concrete curb & gutter, type F (0520-1-10)LF17,272$43.41$30.00$38.70$25.00
0360Concrete curb, type D (0520-2-4)LF5,483$21.84$31.00$21.00$20.00
0365Concrete curb, ribbon curb (0520-2100)LF114$24.72$40.00$37.00$25.00
0370Valley gutter- concrete (0520-3)LF231$34.74$40.00$39.00$30.00
0375Concrete sidewalk and driveways, 4" thick (0522-1)SY8,248$51.55$75.00$80.50$70.00
0380Concrete sidewalk and driveways, 6" thick (0522-2)SY8,056$74.71$90.00$118.00$100.00
0385Patterned pavement (0523-3)SY2,187$85.00$121.00$154.00$130.00
0390Concrete slope pavement,non reinforced, 4" (0524-2-2)SY379$88.90$73.00$124.00$95.00
0395Pavers, architectural, remove existing and reinstall (0526-1101)SY21$136.72$300.00$127.00$150.00
0400Detectable warnings (0527-2)SF1,071$33.14$63.00$50.00$45.00
0405Riprap, rubble, F&I, ditch lining (0530-3-4)TN53$173.78$250.00$246.00$210.00
0410Bedding stone (0530-74)TN38$174.65$250.00$83.00$70.00
0415Performance turf, sod (0570-1-2)SY25,085$3.84$8.00$4.20$4.50
0420Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$21,000$21,000$21,000$21,000
0425Raised pavement marker, type B (0706-1-3)EACH2,646$4.00$4.00$5.50$4.50
0430Painted pavement markings, standard, white, solid, 6" (0710-11101)GM9.78$134.93$135.00$1,530.00$1,500.00
0435Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.81$1,485.15$1,500.00$1,530.00$2,100.00
0440Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF186$1.00$1.00$0.90$0.75
0445Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF266$1.35$1.35$1.30$2.00
0450Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF926$1.45$1.45$1.70$2.25
0455Painted pavement markings, standard, white, message or symbol (0710-11160)EACH2$100.00$100.00$87.00$140.00
0460Painted pavement markings, standard, white, arrows (0710-11170)EACH19$75.00$75.00$58.00$40.00
0465Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM7.09$1,034.27$1,035.00$1,530.00$1,500.00
0470Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202)GM0.11$1,415.09$1,500.00$1,530.00$2,200.00
0475Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF666$1.35$1.35$1.30$2.10
0480Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.07$665.49$675.00$764.00$775.00
0485Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00
0490Disputes review board, meeting- DO not bid (0999-20-1)DA28$3,900.00$3,900.00$3,900.00$3,900.00
0495Disputes review board, hearing- DO not bid (0999-20-2)EACH2$4,500.00$4,500.00$4,500.00$4,500.00
0500Initial contingency amount, DO not bid (0999-25)LS1$113,023$113,023$113,023$113,023
0505Initial contingency amount, DO not bid (0999-25)LS1$36,977$36,977$36,977$36,977
0510Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH45$473.00$473.00$573.00$500.00
0515Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH22$1,467.00$1,467.00$2,200.00$1,550.00
0520Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH5$1,100.00$1,100.00$2,550.00$1,150.00
0525Single column ground sign assembly, relocate (0700-1500)EACH10$455.00$455.00$318.00$480.00
0530Single column ground sign assembly, remove (0700-1600)EACH30$50.00$50.00$58.00$50.00
0535Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH4$7,464.00$7,464.00$5,780.00$7,900.00
0540Multi-column ground sign assembly, relocate (0700-2500)EACH1$4,300.00$4,300.00$3,120.00$4,500.00
0545Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH16$79.00$79.00$8.10$80.00
0550Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111)EACH1$13,777$13,777$9,140.00$15,000
0555Enhanced highway sign solar powered, relocate - ground mount (0700-142802)EACH4$1,800.00$1,800.00$5,310.00$1,900.00
0560Enhanced highway sign solar powered, remove - mount (0700-142902)EACH2$600.00$600.00$608.00$650.00
0565Tubular marker, 36" yellow (0704-1-4)EACH15$230.00$230.00$110.00$240.00
0570Object marker, type 1 (0705-10-1)EACH3$210.00$210.00$260.00$220.00
0575Raised pavement marker, type B (0706-1-3)EACH1,108$4.00$4.00$5.50$4.50
0580Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF58$3.10$3.10$8.10$0.75
0585Painted pavement markings, surface (0710-90)LS1$34,538$35,000$21,600$29,000
0590Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF3,606$1.80$1.80$3.50$2.25
0595Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF731$3.80$3.80$6.90$7.00
0600Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.39$1,776.62$1,800.00$2,660.00$2,350.00
0605Thermoplastic, standard, message or symbol (0711-11160)EACH8$200.00$200.00$133.00$400.00
0610Thermoplastic, standard, arrow (0711-11170)EACH64$100.00$100.00$110.00$85.00
0615Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF470$2.50$2.50$5.80$3.70
0620Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.28$1,774.65$1,800.00$2,660.00$2,400.00
0625Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,162$18.00$18.00$22.00$13.00
0630Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.91$4,498.85$4,500.00$7,290.00$6,500.00
0635Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.02$4,333.33$5,200.00$7,520.00$7,200.00
0640Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.03$1,898.13$1,900.00$2,660.00$2,100.00
0645Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.52$4,548.71$4,550.00$7,290.00$6,500.00
0650Conduit, furnish & install, open trench (0630-2-11)LF5,656$16.90$16.90$17.00$14.00
0655Conduit, furnish & install, directional bore (0630-2-12)LF1,502$25.20$25.20$38.00$35.00
0660Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH64$1,845.30$1,845.30$2,170.00$1,700.00
0665Electrical power service, F&I, overhead, meter furnished by power company (0639-1111)AS1$4,488.70$4,488.70$5,530.00$4,700.00
0670Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$3,490.00$3,490.00$4,080.00$2,400.00
0675Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,848.00$2,848.00$2,740.00$2,300.00
0680Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF22,194$3.30$3.30$3.40$2.50
0685Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF300$4.70$4.70$6.80$5.00
0690Load center, F&I, secondary voltage (0715-7-11)EACH1$15,392$15,392$35,300$24,000
0695Light pole complete, F&I, standard pole special foundation, 30' mounting height, 12' arm length (0715-62142)EACH38$11,355$11,355$14,300$14,000
0700Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH44$855.40$855.40$1,350.00$950.00
0705Light pole complete- special design, F&I, single arm mount, aluminum, 30' (0715-511130)EACH6$12,475$12,475$15,500$15,000
0710Conduit, furnish & install, open trench (0630-2-11)LF2,070$29.40$29.40$29.00$14.00
0715Conduit, furnish & install, directional bore (0630-2-12)LF4,594$33.60$33.60$43.00$35.00
0720Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$15,821$15,821$18,900$16,000
0725Signal cable, remove- intersection (0632-7-6)PI1$853.40$853.40$2,130.00$3,500.00
0730Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF480$4.30$4.30$4.30$5.00
0735Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124)LF6,560$5.10$5.10$4.90$6.00
0740Fiber optic cable, relocate, underground (0633-1420)LF500$2.50$2.50$3.50$4.25
0745Fiber optic connection, install, splice (0633-2-31)EACH306$50.50$50.50$49.00$60.00
0750Fiber optic connection hardware, F&I, splice (0633-3-11)EACH3$1,507.70$1,507.70$1,460.00$1,770.00
0755Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH3$61.60$61.60$59.00$70.00
0760Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH2$2,443.10$2,443.10$2,300.00$2,800.00
0765Fiber optic cable locator (0633-6)DA874$0.01$258.00$203.00$155.00
0770Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF1,165$5.40$5.40$5.90$6.00
0775Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH71$1,143.70$1,143.70$2,240.00$1,900.00
0780Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH21$2,565.50$2,565.50$3,770.00$2,850.00
0785Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH4$4,877.00$4,877.00$6,840.00$4,600.00
0790Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$6,396.30$6,396.30$5,940.00$4,700.00
0795Electrical service wire, & install (0639-2-1)LF311$11.80$11.80$12.00$6.00
0800Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,506.80$2,506.80$2,740.00$2,400.00
0805Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH2$3,840.20$3,840.20$9,280.00$7,700.00
0810Aluminum signals pole, (0646-1-11)EACH16$2,357.30$2,357.30$3,810.00$2,800.00
0815Aluminum signals pole, remove (0646-1-60)EACH2$640.10$640.10$711.00$860.00
0820Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH2$51,457$51,457$76,000$59,000
0825Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$78,259$78,259$108,000$79,000
0830Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH3$84,922$84,922$109,000$84,000
0835Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH2$106,808$106,808$85,100$89,000
0840Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS17$1,428.60$1,428.60$2,530.00$1,900.00
0845Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS4$2,011.80$2,011.80$3,060.00$2,400.00
0850Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$2,911.80$2,911.30$3,810.00$3,200.00
0855Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS16$846.90$846.90$1,350.00$1,150.00
0860Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$15,119$15,119$12,100$11,000
0865Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH1$10,405$10,405$5,330.00$7,100.00
0870Pedestrian detector, furnish & install, standard (0665-1-11)EACH16$1,834.20$1,834.20$395.00$280.00
0875Traffic controller assembly, F&I, NEMA (0670-5110)AS2$55,805$55,805$69,400$52,000
0880Traffic controller assembly, remove controller with (0670-5600)AS1$853.40$853.40$1,070.00$2,750.00
0885System control equipment, furnish & install, adaptive control system- NEMA, cabinet equipment (0680-1112)EACH2$36,344$36,344$61,500$28,500
0890System control equipment, furnish & install, adaptive control system- NEMA, above ground equipment (0680-1113)EACH8$17,472$17,472$20,200$14,000
0895ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH2$6,922.80$6,922.80$8,140.00$9,800.00
0900Managed field ethernet switch, furnish & install (0684-1-1)EACH2$2,496.20$2,496.20$11,700$14,000
0905Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH2$18,318$18,318$16,400$29,500
0910Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH8$3,178.20$3,178.20$5,070.00$3,100.00
0915Landscape complete- large plants (0580-1-2)LS1$239,500$105,000$327,000$135,000
0920Irrigation system (0590-70)LS1$435,000$234,000$515,000$440,000
0925Local agency initial amount (DO not bid) (0999-26)LS1$225,624$225,624$225,624$225,624
0930Utility pipe, F&I, PVC pipe, 2.5", project 431752-5-56-01 (1050-10103)LF1,835$33.44$43.00$56.00$50.00
0935Utility pipe,remove & dispose, 2- 4.9" (1050-16002)LF4,872$13.85$4.50$23.00$20.00
0940Utility pipe,remove & dispose, 5- 7.9" (1050-16003)LF1,183$11.73$4.80$23.00$20.00
0945Utility pipe,remove & dispose, 8- 19.9" (1050-16004)LF6,172$15.76$6.05$25.00$22.00
0950Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31202)LF1,135$35.46$41.00$63.00$55.00
0955Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31203)LF690$42.76$44.00$220.00$190.00
0960Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31204)LF1,186$43.76$46.00$218.00$190.00
0965Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206)LF1,202$55.67$67.00$243.00$210.00
0970Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208)LF2,126$69.99$79.00$213.00$185.00
0975Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212)LF1,850$112.13$110.00$248.00$215.00
0980Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 16" (1050-31216)LF2,550$155.10$120.00$255.00$220.00
0985Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108)EACH84$1,104.66$520.00$1,300.00$1,150.00
0990Utility fittings, ductile iron, furnish & install elbow, (1055-51112)EACH44$2,422.00$2,280.00$3,070.00$2,700.00
0995Utility fittings, ductile iron, furnish & install elbow, (1055-51116)EACH48$3,362.20$3,360.00$4,200.00$3,600.00
1000Utility fittings, ductile iron, furnish & install tee, 8" (1055-51208)EACH1$1,257.28$1,630.00$1,560.00$1,400.00
1005Utility fittings, ductile iron, furnish & install tee, 16" (1055-51216)EACH7$3,588.91$5,930.00$4,280.00$3,750.00
1010Utility fittings, ductile iron, furnish & install reducer, 8" (1055-51308)EACH6$1,227.92$1,220.00$1,340.00$1,150.00
1015Utility fittings, ductile iron, furnish & install union, 8" (1055-51408)EACH4$1,153.38$1,430.00$1,350.00$1,180.00
1020Utility fittings, ductile iron, furnish & install union, 12" (1055-51412)EACH8$1,914.82$1,820.00$2,530.00$2,200.00
1025Utility fittings, ductile iron, furnish & install union, 16" (1055-51416)EACH21$3,113.96$2,930.00$4,170.00$3,600.00
1030Utility fittings, ductile iron, furnish & install Y, 8" (1055-51608)EACH1$2,932.63$3,000.00$3,360.00$2,900.00
1035Utility fittings, ductile iron, furnish & install cross, 8" (1055-51808)EACH2$2,526.55$2,420.00$2,960.00$2,600.00
1040Utility fittings, ductile iron, furnish & install cross, (1055-51816)EACH5$4,733.07$5,140.00$5,560.00$4,800.00
1045Utility fixture, valve/meter box, furnish & install, 1" (1080-21100)EACH4$1,506.00$1,440.00$2,760.00$2,400.00
1050Utility fixture, valve/meter box, furnish & install, 1.5" (1080-21101)EACH30$4,263.51$1,940.00$3,350.00$2,900.00
1055Utility fixture, valve/meter box, furnish & install, 2" (1080-21102)EACH3$2,757.51$2,360.00$3,890.00$3,400.00
1060Utility fixture, valve/meter box, adjust (1080-21500)EACH97$836.92$760.00$621.00$540.00
1065Utility fixture- tapping saddle/sleeve, furnish & 8" (1080-23108)EACH1$15,682$15,500$19,600$17,000
1070Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112)EACH2$25,773$22,800$33,400$29,000
1075Utility fixture- tapping saddle/sleeve, furnish & 16" (1080-23116)EACH1$19,876$19,000$27,100$24,000
1080Utility fixture, valve assembly, furnish and install, 2" (1080-24102)EACH6$3,426.86$2,440.00$2,620.00$2,300.00
1085Utility fixture, valve assembly, furnish and install, 3" (1080-24103)EACH26$4,534.88$2,170.00$2,750.00$2,400.00
1090Utility fixture, valve assembly, furnish and install, 4" (1080-24104)EACH8$3,405.33$2,220.00$2,830.00$2,500.00
1095Utility fixture, valve assembly, furnish and install, 6" (1080-24106)EACH15$2,996.06$2,890.00$3,310.00$2,900.00
1100Utility fixture, valve assembly, furnish and install, 8" (1080-24108)EACH8$4,983.29$4,320.00$4,190.00$3,650.00
1105Utility fixture, valve assembly, furnish and install, 12" (1080-24112)EACH4$7,018.90$5,890.00$7,550.00$6,600.00
1110Utility fixture, valve assembly, furnish and install, 16" (1080-24116)EACH13$12,535$10,400$13,400$11,600
1115Utility fixture- blowoff assembly, furnish and install, (1080-25102)EACH3$3,225.17$2,400.00$4,370.00$3,800.00
1120Utility fixture, vac/air furnish & install 2" (1080-26102)EACH3$12,050$10,600$16,200$14,000
1125Utility fixture- line stop assembly, furnish and install, (1080-27108)EACH5$6,818.55$16,300$22,100$19,300
1130Utility fixture- line stop assembly, furnish and install, (1080-27112)EACH10$9,968.54$21,600$27,000$23,500
1135Utility fixture- line stop assembly, furnish and install, (1080-27116)EACH21$21,864$34,100$42,900$37,000
1140Utility fixture- sample point, furnish & install, 6" (1080-32106)EACH20$701.75$680.00$1,630.00$1,450.00
1145Utility fixture- sample point, furnish & install, 8" (1080-32108)EACH6$1,692.09$760.00$1,630.00$1,450.00
1150Utility fixture- sample point, furnish & install, 12" (1080-32112)EACH8$1,529.33$790.00$1,750.00$1,550.00
1155Utility fixture- sample point, furnish & install, 16" (1080-32116)EACH20$1,847.51$820.00$1,800.00$1,550.00
1160Fire hydrant, F&I, standard, 2 hose, 6" (1644-112-06)EACH6$12,024$5,630.00$9,600.00$8,500.00
FDOT contract T4575: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy