FDOT contract T6576 bid tabulation
SR 932 (NW 103RD ST) AT NW 103 ST AND NW 32 AVE. Let by Florida DOT on January 29, 2025, Miami-Dade, District 6. 9 bids received; low bid $1,614,999 by Florida Signal & Lighting Contractors, Inc..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 94
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Florida Signal & Lighting Contractors, Inc. | $1,614,999 | Low |
| 2 | Weekley Asphalt Paving, Inc. | $1,674,496 | +4.0% |
| 3 | Horizon Contractors, Inc. | $1,683,000 | +4.0% |
| 4 | Signal Technology and Installation Corp. | $1,721,092 | +7.0% |
| 5 | Horsepower Electric, Inc. | $1,769,769 | +10% |
| 6 | Florida Engineering & Development Corp | $1,783,655 | +10% |
| 7 | Aum Construction Inc. | $1,799,078 | +11% |
| 8 | General Asphalt Company, LLC | $1,937,807 | +20% |
| 9 | Roadway Construction, LLC | $1,962,680 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Florida Signal & Lighting Contractors, Inc. | 2. Weekley Asphalt Paving, Inc. | 3. Horizon Contractors, Inc. | 4. Signal Technology and Installation Corp. | 5. Horsepower Electric, Inc. | 6. Florida Engineering & Development Corp |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $160,000 | $81,385 | $250,000 | $129,246 | $102,666 | $204,224 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $145,000 | $200,414 | $72,000 | $95,767 | $100,000 | $146,454 |
| 0015 | Traffic control officer (0102-14) | HR | 60 | $80.00 | $88.00 | $70.00 | $100.78 | $80.00 | $98.12 |
| 0020 | Work zone sign (0102-60) | ED | 3,960 | $0.35 | $0.25 | $0.30 | $0.37 | $0.30 | $0.30 |
| 0025 | Business sign (0102-61) | EACH | 6 | $60.00 | $49.00 | $50.00 | $60.47 | $50.00 | $1,377.98 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 7,400 | $0.23 | $0.16 | $0.15 | $0.15 | $0.20 | $0.12 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 18,423 | $0.15 | $0.06 | $0.08 | $0.09 | $0.10 | $0.07 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 520 | $7.00 | $5.40 | $5.50 | $6.72 | $10.00 | $5.50 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 548 | $15.00 | $12.20 | $13.00 | $16.13 | $15.00 | $13.21 |
| 0050 | Type III barricade (0102-115) | ED | 440 | $0.35 | $0.29 | $0.35 | $0.48 | $0.35 | $0.39 |
| 0055 | Inlet protection system (0104-18) | EACH | 17 | $500.00 | $160.00 | $80.00 | $157.15 | $120.00 | $107.19 |
| 0060 | Litter removal (0107-1) | ACRE | 6.74 | $300.00 | $100.00 | $0.01 | $55.90 | $100.00 | $110.18 |
| 0065 | Mowing (0107-2) | ACRE | 3.63 | $300.00 | $100.00 | $0.01 | $70.89 | $100.00 | $247.02 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $30,000 | $106,364 | $9,800.00 | $22,277 | $24,510 | $24,541 |
| 0075 | Removal of existing concrete (0110-4-10) | SY | 677 | $18.00 | $39.00 | $28.00 | $37.63 | $39.22 | $41.79 |
| 0080 | Tree protection barrier (0110-21) | LF | 92 | $15.00 | $25.00 | $0.01 | $14.70 | $10.00 | $9.89 |
| 0085 | Tree removal (0110-23) | EACH | 1 | $3,000.00 | $1,500.00 | $25,430 | $2,227.68 | $2,450.97 | $2,751.26 |
| 0090 | Regular excavation (0120-1) | CY | 498.40 | $30.00 | $50.00 | $20.00 | $31.83 | $35.01 | $84.01 |
| 0095 | Embankment (0120-6) | CY | 5 | $200.00 | $85.00 | $20.00 | $82.75 | $91.04 | $82.83 |
| 0100 | Type B stabilization (0160-4) | SY | 1,483 | $9.00 | $20.00 | $0.01 | $8.60 | $9.45 | $17.33 |
| 0105 | Optional base, base group 09 (0285-709) | SY | 1,206 | $36.00 | $52.99 | $50.00 | $71.61 | $78.78 | $43.28 |
| 0110 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 6,434 | $6.00 | $3.00 | $7.00 | $5.53 | $6.08 | $6.05 |
| 0115 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 132.70 | $350.00 | $250.00 | $320.00 | $197.31 | $217.09 | $319.43 |
| 0120 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 630.30 | $210.00 | $200.00 | $250.00 | $222.77 | $245.10 | $258.62 |
| 0125 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $7,000.00 | $16,000 | $15,000 | $13,249 | $14,577 | $10,597 |
| 0130 | Manholes, P-7, >10' (0425-2-42) | EACH | 1 | $7,000.00 | $19,500 | $15,000 | $15,912 | $17,507 | $17,789 |
| 0135 | Manhole, adjust (0425-5) | EACH | 3 | $1,500.00 | $1,470.00 | $1,000.00 | $1,400.26 | $1,540.61 | $1,297.33 |
| 0140 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 15 | $300.00 | $430.00 | $400.00 | $1,018.37 | $1,120.44 | $320.50 |
| 0145 | French drain, 24" (0443-70-4) | LF | 96 | $300.00 | $395.00 | $300.00 | $477.36 | $525.21 | $407.59 |
| 0150 | Concrete curb & gutter, type F (0520-1-10) | LF | 565 | $35.00 | $45.00 | $40.00 | $86.57 | $95.24 | $69.24 |
| 0155 | Concrete traffic separator, special- variable width (0520-70) | SY | 175 | $54.00 | $244.14 | $80.00 | $140.03 | $154.06 | $170.45 |
| 0160 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 158 | $54.00 | $125.00 | $70.00 | $104.39 | $114.85 | $84.80 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 110 | $63.00 | $162.83 | $100.00 | $140.03 | $154.06 | $101.93 |
| 0170 | Detectable warnings (0527-2) | SF | 54 | $35.00 | $49.00 | $30.00 | $40.74 | $44.82 | $46.28 |
| 0175 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 219 | $80.00 | $59.00 | $60.00 | $69.85 | $50.00 | $44.02 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 154 | $40.00 | $15.00 | $10.00 | $19.75 | $7.00 | $12.03 |
| 0185 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0190 | Raised pavement marker, type B (0706-1-3) | EACH | 680 | $8.00 | $5.00 | $3.85 | $5.70 | $6.67 | $5.50 |
| 0195 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.31 | $1,750.00 | $1,584.00 | $2,800.00 | $1,846.74 | $3,520.00 | $1,743.21 |
| 0200 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 6 | $60.00 | $40.00 | $40.00 | $142.28 | $46.67 | $44.02 |
| 0205 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.31 | $1,750.00 | $1,584.00 | $3,000.00 | $1,846.74 | $3,520.00 | $1,743.21 |
| 0210 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0215 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 5 | $560.00 | $495.00 | $500.00 | $924.87 | $1,233.33 | $544.75 |
| 0220 | Single column ground sign assembly, remove (0700-1600) | EACH | 6 | $50.00 | $10.00 | $100.00 | $73.99 | $246.67 | $11.01 |
| 0225 | Tubular marker, 36" yellow (0704-1-4) | EACH | 4 | $115.00 | $95.00 | $200.00 | $134.37 | $133.33 | $104.55 |
| 0230 | Raised pavement marker, type B (0706-1-3) | EACH | 178 | $7.00 | $5.00 | $4.00 | $136.00 | $6.67 | $5.50 |
| 0235 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 4 | $50.00 | $2.00 | $20.00 | $4.71 | $3.33 | $2.20 |
| 0240 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,600.00 | $6,998.00 | $6,000.00 | $10,705 | $7,040.00 | $7,701.32 |
| 0245 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 663 | $2.60 | $2.40 | $10.00 | $3.03 | $3.33 | $2.64 |
| 0250 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 173 | $4.00 | $3.60 | $10.00 | $4.48 | $4.93 | $3.96 |
| 0255 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 176 | $5.00 | $4.80 | $10.00 | $5.98 | $6.67 | $5.28 |
| 0260 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.03 | $1,750.00 | $1,584.00 | $10,000 | $5,960.00 | $7,040.00 | $1,743.33 |
| 0265 | Thermoplastic, standard, arrow (0711-11170) | EACH | 12 | $200.00 | $80.00 | $150.00 | $268.74 | $120.00 | $88.04 |
| 0270 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 27 | $50.00 | $3.60 | $4.00 | $4.48 | $4.93 | $3.96 |
| 0275 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.07 | $7,000.00 | $6,336.00 | $10,000 | $5,959.44 | $7,040.00 | $6,972.96 |
| 0280 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 649 | $21.00 | $19.00 | $22.00 | $24.19 | $32.00 | $20.91 |
| 0285 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.33 | $7,000.00 | $6,336.00 | $7,000.00 | $8,733.97 | $8,448.00 | $6,972.79 |
| 0290 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.22 | $7,000.00 | $6,336.00 | $7,000.00 | $11,556 | $11,600 | $6,972.79 |
| 0295 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.27 | $2,000.00 | $1,584.00 | $7,000.00 | $5,959.29 | $7,040.00 | $1,743.20 |
| 0300 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.35 | $7,000.00 | $6,336.00 | $7,000.00 | $8,733.94 | $8,448.00 | $6,972.80 |
| 0305 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 522 | $35.00 | $45.00 | $60.00 | $40.32 | $30.00 | $59.32 |
| 0310 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,850.00 | $1,800.00 | $1,900.00 | $2,308.27 | $1,500.00 | $1,890.22 |
| 0315 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,879 | $3.00 | $5.00 | $3.50 | $6.81 | $5.00 | $3.52 |
| 0320 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 1,723 | $0.45 | $1.00 | $0.25 | $2.92 | $1.00 | $0.22 |
| 0325 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 2 | $2,500.00 | $800.00 | $800.00 | $1,339.34 | $1,500.00 | $835.62 |
| 0330 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 938 | $40.00 | $50.00 | $69.00 | $50.39 | $30.00 | $69.00 |
| 0335 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $12,500 | $15,000 | $18,000 | $11,830 | $25,000 | $16,567 |
| 0340 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $900.00 | $800.00 | $1,000.00 | $2,219.45 | $1,500.00 | $831.21 |
| 0345 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 38 | $1,700.00 | $1,600.00 | $1,400.00 | $1,920.81 | $1,500.00 | $1,431.42 |
| 0350 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $3,200.00 | $4,000.00 | $3,000.00 | $2,961.16 | $3,000.00 | $2,651.22 |
| 0355 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,800.00 | $5,000.00 | $10,000 | $4,623.23 | $8,000.00 | $10,189 |
| 0360 | Electrical service wire, & install (0639-2-1) | LF | 170 | $10.00 | $20.00 | $13.00 | $9.26 | $15.00 | $12.44 |
| 0365 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,500.00 | $3,280.00 | $3,500.00 | $5,612.73 | $3,500.00 | $3,451.72 |
| 0370 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,900.00 | $3,000.00 | $7,000.00 | $3,431.51 | $3,700.00 | $7,070.40 |
| 0375 | Aluminum signals pole, (0646-1-11) | EACH | 5 | $2,000.00 | $1,500.00 | $2,700.00 | $4,643.54 | $3,000.00 | $2,741.90 |
| 0380 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $940.00 | $500.00 | $620.00 | $295.94 | $500.00 | $623.43 |
| 0385 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 2 | $89,000 | $69,000 | $82,000 | $77,182 | $90,000 | $78,000 |
| 0390 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $95,600 | $75,000 | $92,000 | $87,675 | $97,000 | $88,000 |
| 0395 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $115,000 | $87,000 | $105,000 | $93,754 | $110,000 | $97,000 |
| 0400 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 4 | $3,500.00 | $4,500.00 | $3,700.00 | $5,918.52 | $10,000 | $3,740.17 |
| 0405 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 7 | $1,750.00 | $1,500.00 | $1,450.00 | $1,732.39 | $3,000.00 | $1,468.51 |
| 0410 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $2,000.00 | $1,800.00 | $2,000.00 | $2,223.93 | $3,500.00 | $1,920.82 |
| 0415 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 3 | $2,500.00 | $2,000.00 | $2,300.00 | $2,774.09 | $4,000.00 | $2,282.55 |
| 0420 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 2 | $1,500.00 | $1,800.00 | $800.00 | $884.69 | $1,150.00 | $804.91 |
| 0425 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $2,100.00 | $2,100.00 | $1,700.00 | $1,716.78 | $2,000.00 | $1,706.55 |
| 0430 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 7 | $650.00 | $400.00 | $350.00 | $537.52 | $600.00 | $348.97 |
| 0435 | Loop assembly, F&I, type F (0660-2106) | AS | 9 | $1,900.00 | $2,000.00 | $2,400.00 | $4,083.21 | $2,300.00 | $2,412.63 |
| 0440 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $560.00 | $800.00 | $240.00 | $471.00 | $600.00 | $241.34 |
| 0445 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 1 | $50,000 | $40,000 | $52,000 | $52,868 | $60,000 | $49,000 |
| 0450 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $650.00 | $1,000.00 | $1,000.00 | $2,219.45 | $1,000.00 | $831.21 |
| 0455 | Network device, cellular (0684-90102) | EACH | 1 | $3,000.00 | $6,500.00 | $2,000.00 | $2,117.61 | $4,000.00 | $1,951.52 |
| 0460 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 3 | $1,000.00 | $900.00 | $1,000.00 | $986.14 | $1,100.00 | $1,071.78 |
| 0465 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 4 | $3,500.00 | $4,000.00 | $3,000.00 | $5,500.75 | $5,000.00 | $3,068.09 |
| 0470 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 2 | $2,500.00 | $2,000.00 | $1,600.00 | $2,446.85 | $7,000.00 | $1,534.99 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.