FDOT contract T6611 bid tabulation

SR 5 (US 1/BISCAYNE BLVD) FROM NE 61 ST TO NE 6 AVE. Let by Florida DOT on March 26, 2025, Miami-Dade, District 6. 7 bids received; low bid $5,969,145 by General Asphalt Company, LLC.

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
108
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1General Asphalt Company, LLC$5,969,145Low
2Roadway Construction, LLC$6,349,722+6.0%
3Weekley Asphalt Paving, Inc.$6,409,444+7.0%
4Florida Engineering & Development Corp$6,441,733+8.0%
5Aum Construction Inc.$6,799,999+14%
6Ohla USA Inc$6,870,803+15%
7The Stout Group LLC$6,944,186+16%
FDOT contract T6611: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. General Asphalt Company, LLC2. Roadway Construction, LLC3. Weekley Asphalt Paving, Inc.4. Florida Engineering & Development Corp5. Aum Construction Inc.6. Ohla USA Inc
0005Mobilization (0101-1)LS1$200,000$634,972$362,000$632,250$740,000$680,000
0010Maintenance of traffic (0102-1)DA1$455,000$1,021,531$551,000$303,000$300,000$865,000
0015Commercial material for temporary driveway maintenance (0102-3)CY56$88.00$135.63$95.00$172.15$100.00$370.00
0020Traffic control officer (0102-14)HR912$88.00$85.00$90.00$83.48$80.00$70.00
0025Work zone sign (0102-60)ED31,440$0.21$0.19$0.19$0.23$0.30$0.20
0030Business sign (0102-61)EACH120$33.00$30.00$30.00$46.35$100.00$32.00
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED88,060$0.10$0.09$0.09$0.09$0.20$0.10
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD50,085$0.08$0.07$0.07$0.08$0.10$0.08
0045Arrow board / advance warning arrow panel (0102-76)ED2,640$5.50$5.00$5.00$4.12$7.00$0.53
0050Portable changeable message sign, temporary (0102-99)ED668$11.00$10.00$10.00$10.30$15.00$11.00
0055Temporary signalization and maintenance, intersection (0102-104)ED4,800$1.98$2.00$7.00$4.64$10.00$7.50
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED4,800$1.98$2.00$7.00$4.64$10.00$7.50
0065Type III barricade (0102-115)ED14,720$0.28$0.25$0.25$0.29$0.50$0.27
0070Inlet protection system (0104-18)EACH127$220.00$137.81$160.00$92.06$250.00$205.00
0075Litter removal (0107-1)ACRE10.55$0.01$0.01$100.00$418.72$500.00$80.00
0080Mowing (0107-2)ACRE0.45$0.01$0.02$1,000.00$1,956.53$5,000.00$80.00
0085Monitor existing structures- vibration monitoring (0108-2)LS1$1.10$100.00$45,000$16,480$20,869$12,000
0090Selective clearing and areas with trees to remain (0110-2-2)ACRE0.01$242,000$717,692$400,000$222,851$500,000$1,300,000
0095Removal of existing concrete (0110-4-10)SY4,045$52.25$27.75$65.38$54.99$35.00$70.00
0100Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY55,903$4.19$5.00$5.00$4.90$5.00$5.00
0105Superpave asphaltic conc, traffic C (0334-1-13)TN3,843.30$165.42$180.00$210.00$191.70$250.00$150.00
0110Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN3,843.30$194.72$215.00$220.00$224.06$260.00$200.00
0115Manhole, adjust (0425-5)EACH128$880.00$500.00$450.00$981.80$1,500.00$800.00
0120Concrete curb & gutter, type F (0520-1-10)LF2,598$63.80$46.25$52.10$52.34$45.00$80.00
0125Concrete curb, type D (0520-2-4)LF17$55.00$63.06$190.00$65.20$45.00$88.00
0130Concrete sidewalk and driveways, 4" thick (0522-1)SY1,020$80.08$65.95$105.19$69.95$90.00$79.00
0135Concrete sidewalk and driveways, 6" thick (0522-2)SY3,025$96.36$87.09$135.21$91.11$100.00$95.00
0140Patterned pavement (0523-3)SY580$825.00$300.00$521.54$858.38$385.00$770.00
0145Detectable warnings (0527-2)SF838$44.00$27.39$49.00$40.83$40.00$69.00
0150Performance turf, sod (0570-1-2)SY138$11.55$24.57$15.00$11.36$20.00$45.00
0155Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$11,000$11,000$11,000$11,000$11,000$11,000
0160Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH7$2,189.99$3,200.00$3,800.00$2,050.63$2,000.00$2,800.00
0165Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH7$2,337.39$2,800.00$4,000.00$2,188.65$1,800.00$2,600.00
0170Raised pavement marker, type B (0706-1-3)EACH3,858$3.30$1.50$5.00$5.15$5.00$1.60
0175Painted pavement markings, standard, white, solid, 6" (0710-11101)GM7.58$2,200.00$350.18$1,400.00$1,442.00$3,000.00$370.00
0180Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.22$2,750.00$471.28$1,600.00$1,647.98$4,000.00$475.00
0185Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF13,494$1.10$0.20$1.00$1.03$1.50$0.21
0190Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF302$1.65$0.30$3.00$3.09$3.00$0.31
0195Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF3,030$2.20$0.40$3.00$3.09$3.00$0.42
0200Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM4.18$2,200.00$100.05$800.00$824.00$2,500.00$105.00
0205Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.26$2,200.00$201.55$800.00$823.99$3,000.00$205.00
0210Painted pavement markings, standard, white, message or symbol (0710-11160)EACH6$88.00$15.00$85.00$87.55$100.00$16.00
0215Painted pavement markings, standard, white, arrows (0710-11170)EACH194$44.00$10.00$45.00$46.35$60.00$11.00
0220Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM5.76$2,200.00$350.12$1,400.00$1,442.00$3,000.00$370.00
0225Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,046$1.65$0.30$3.00$3.09$3.00$0.32
0230Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM1.97$2,200.00$349.65$800.00$824.00$2,500.00$370.00
0235Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.10$2,200.00$196.08$800.00$824.02$5,000.00$210.00
0240Initial contingency amount, DO not bid (0999-25)LS1$64,288$64,288$64,288$64,288$64,288$64,288
0245Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH16$440.00$400.00$700.00$721.00$750.00$700.00
0250Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH7$1,100.00$1,300.00$1,800.00$1,854.00$1,700.00$1,800.00
0255Single column ground sign assembly, remove (0700-1600)EACH9$55.00$20.00$50.00$51.50$100.00$50.00
0260Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH14$330.00$250.00$350.00$360.50$450.00$350.00
0265Sign panel, remove, UP to 12 SF (0700-3601)EACH11$55.00$55.00$25.00$25.75$100.00$25.00
0270Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH8$137.50$120.00$150.00$154.50$150.00$150.00
0275Delineator, flexible tubular (0705-11-1)EACH5$110.00$90.00$100.00$103.00$150.00$100.00
0280Raised pavement marker, type B (0706-1-3)EACH1,929$3.30$5.00$5.00$5.15$5.00$5.26
0285Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF87$5.50$5.00$10.00$10.30$15.00$5.26
0290Painted pavement markings, surface (0710-90)LS1$44,000$58,512$40,000$41,200$55,000$61,590
0295Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.09$5,500.00$6,900.35$7,500.00$7,725.06$10,000$6,450.00
0300Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF6,747$2.20$3.24$4.00$4.12$3.00$3.40
0305Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF151$2.75$4.87$5.00$5.15$3.50$5.20
0310Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,515$3.30$6.48$6.00$6.18$4.50$7.00
0315Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.13$1,452.00$2,267.44$3,500.00$3,605.04$10,000$2,202.00
0320Thermoplastic, standard, message or symbol (0711-11160)EACH3$110.00$71.00$225.00$231.75$250.00$75.00
0325Thermoplastic, standard, arrow (0711-11170)EACH97$66.00$54.00$80.00$82.40$90.00$57.00
0330Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF523$2.75$4.53$5.00$5.15$4.00$4.75
0335Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.05$1,452.00$2,205.88$3,500.00$3,605.10$10,000$2,330.00
0340Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,808$15.40$15.59$16.00$16.48$22.00$16.40
0345Thermoplastic, preformed, white, message (0711-14160)EACH2$550.00$316.00$400.00$412.00$750.00$332.00
0350Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.79$5,500.00$4,888.58$5,200.00$5,356.00$6,500.00$5,130.00
0355Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.02$5,500.00$5,430.83$6,000.00$6,180.00$15,000$5,715.00
0360Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.09$1,452.00$1,222.58$3,000.00$3,090.00$6,000.00$1,280.00
0365Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM2.88$5,500.00$4,581.59$5,200.00$5,355.71$6,500.00$4,800.00
0370Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.99$1,452.00$1,149.65$3,000.00$3,090.00$6,500.00$1,200.00
0375Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.05$19,800$61,999$32,000$32,960$45,000$52,200
0380Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.05$19,800$15,500$9,500.00$9,785.00$45,000$16,300
0385Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.05$19,800$61,999$32,000$30,900$45,000$52,200
0390Preformed/permanent tape, remove (0713-107)SF289$3.30$5.00$16.00$16.48$10.00$5.25
0395Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH48$1,587.96$1,500.00$1,700.00$1,486.91$1,500.00$1,555.00
0400Conduit, furnish & install, directional bore (0630-2-12)LF4,298$80.30$34.00$38.00$75.19$38.00$40.00
0405Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI11$12,055$8,500.00$10,000$11,288$12,000$10,325
0410Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH278$1,509.97$1,500.00$1,400.00$1,413.88$1,500.00$1,555.00
0415Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH12$2,164.80$2,980.00$3,200.00$2,027.04$3,500.00$3,080.00
0420Pull & splice box, install (0635-2-30)EACH11$1,309.11$1,000.00$1,700.00$1,225.80$1,000.00$975.00
0425Electrical power service, F&I, underground, meter by contractor (0639-1122)AS11$8,074.66$5,200.00$6,200.00$7,560.82$7,500.00$6,380.00
0430Electrical power service, F&I, underground, meter not required (0639-1123)AS5$7,635.32$4,400.00$6,000.00$7,149.44$7,000.00$3,255.00
0435Electrical power service, remove underground (0639-1620)AS11$591.47$1,500.00$4,800.00$553.83$950.00$1,020.00
0440Electrical service wire, & install (0639-2-1)LF1,836$11.77$10.00$15.00$11.02$10.00$9.12
0445Electrical service wire, (0639-2-6)LF2,051$0.11$2.00$1.00$0.10$1.00$0.54
0450Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH4$394.35$1,800.00$500.00$369.26$500.00$796.00
0455Prestressed concrete pole, type P-II service pole (0641-2-12)EACH10$3,285.48$2,850.00$3,000.00$3,076.40$2,500.00$3,210.00
0460Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH10$788.59$1,500.00$1,200.00$738.41$1,000.00$755.00
0465Aluminum signals pole, (0646-1-11)EACH26$2,239.71$2,500.00$1,500.00$2,097.18$2,000.00$3,200.00
0470Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH19$2,184.05$2,500.00$2,200.00$2,045.07$1,800.00$2,220.00
0475Aluminum signals pole, remove (0646-1-60)EACH13$591.47$500.00$250.00$553.83$500.00$285.00
0480Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS20$753.50$1,500.00$1,500.00$705.55$1,500.00$1,185.00
0485Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS6$1,618.10$2,200.00$1,700.00$1,515.13$2,200.00$1,975.00
0490Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS8$197.23$500.00$350.00$184.68$500.00$215.00
0495Loop assembly, F&I, type F (0660-2106)AS1$2,836.46$3,200.00$3,000.00$2,655.96$2,000.00$2,700.00
0500Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH11$18,941$17,500$16,000$17,736$18,000$15,800
0505Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH42$2,734.27$3,600.00$2,500.00$2,560.27$3,700.00$4,410.00
0510Vehicle detection system- remove (0660-4-60)EACH10$591.47$650.00$600.00$553.83$500.00$700.00
0515Pedestrian detector, furnish & install, standard (0665-1-11)EACH79$346.61$450.00$650.00$324.55$400.00$572.00
0520Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH31$98.67$250.00$250.00$92.39$50.00$71.00
0525Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH5$1,016.84$650.00$800.00$952.13$1,250.00$903.00
0530Sign panel, remove, UP to 12 SF (0700-3601)EACH5$197.23$150.00$200.00$184.68$200.00$142.00
0535Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH1$7,106.99$4,500.00$3,800.00$6,654.73$3,500.00$3,302.00
0540Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH7$894.63$1,100.00$1,000.00$837.70$750.00$1,035.00
FDOT contract T6611: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy