FDOT contract T7533 bid tabulation

SR 93 (US 19/I-275) FROM N OF SKYWAY FISHING PIER TO S OF... Let by Florida DOT on May 28, 2025, Pinellas, District 7. 3 bids received; low bid $7,799,799 by DB Civil Construction, LLC.

Owner
Florida DOT
Letting
28 MAY 2025
Pay items
38
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1DB Civil Construction, LLC$7,799,799Low
2Nelson, David, Construction Co.$12,321,041+58%
3Watson Civil Construction, Inc.$15,069,909+93%
FDOT contract T7533: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. DB Civil Construction, LLC2. Nelson, David, Construction Co.3. Watson Civil Construction, Inc.
0005Mobilization (0101-1)LS1$370,000$1,000,000$750,000
0010Mobilization (0101-1)LS1$300,000$1,000,000$750,000
0015Maintenance of traffic (0102-1)DA1$100,000$159,560$984,000
0020Maintenance of traffic (0102-1)DA1$70,000$159,560$984,000
0025Work zone sign (0102-60)ED1,395$1.00$0.41$0.37
0030Temporary barrier, F&I, anchored (0102-71-15)LF725$50.00$52.00$44.00
0035Temporary barrier, F&I, free standing (0102-71-16)LF2,540$46.00$29.00$19.00
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED3,645$1.00$0.21$0.22
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,125$0.50$0.17$0.09
0050Temporary crash cushion, redirective option (0102-89-1)LO9$1,000.00$1,500.00$1,100.00
0055Portable changeable message sign, temporary (0102-99)ED28$30.00$35.00$22.00
0060Sediment barrier (0104-10-3)LF2,071$4.00$6.50$3.40
0065Clearing & grubbing (0110-1-1)ACRE1$110,000$25,110$250,000
0070Clearing & grubbing (0110-1-1)ACRE1$100,000$25,110$250,000
0075Tree removal (0110-23)EACH3$5,000.00$6,400.00$18,000
0080Fencing, type A, 5.1-6.0', reset existing (0550-10128)LF897$22.00$45.00$45.00
0085Fiber optic cable locator (0633-6)DA350$250.00$380.00$295.00
0090Single column ground sign assembly, relocate (0700-1500)EACH1$900.00$1,280.00$500.00
0095Initial contingency amount, DO not bid (0999-25)LS1$39,500$39,500$39,500
0100Initial contingency amount, DO not bid (0999-25)LS1$39,500$39,500$39,500
0105Utility pipe,plug & place out of service, 5- 7.9" (1050-18003)LF848$42.00$25.00$49.00
0110Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206)LF71$400.00$109.00$524.00
0115Utility pipe- high density polyethylene, furnish & install, water/sewer, 10" (1050-42210)LF35,384$148.00$239.50$275.00
0120Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 4" (1050-51204)LF10$1,000.00$430.00$391.00
0125Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206)LF491$150.00$180.00$265.00
0130Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 8" (1050-51208)LF1,678$185.00$338.00$175.00
0135Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108)EACH15$3,500.00$645.00$1,500.00
0140Utility fittings, ductile iron, furnish & install tee, 8" (1055-51208)EACH2$4,700.00$980.00$1,720.00
0145Utility fittings, ductile iron, furnish & install reducer, 8" (1055-51308)EACH4$3,000.00$1,100.00$2,200.00
0150Utility fixture, valve assembly, furnish and install, 6" (1080-24106)EACH5$5,000.00$4,900.00$2,700.00
0155Utility fixture, valve assembly, furnish and install, 8" (1080-24108)EACH14$6,000.00$6,300.00$3,400.00
0160Utility fixture- blowoff assembly, furnish and install, (1080-25108)EACH9$9,000.00$3,800.00$10,000
0165Utility fixture, vac/air furnish & install 10" (1080-26110)EACH16$12,000$8,000.00$2,800.00
0170Utility fixture, mechanical restraint, furnish & install, 6" (1080-29106)EACH57$820.00$220.00$272.00
0175Utility fixture, mechanical restraint, furnish & install, 8" (1080-29108)EACH166$850.00$310.00$327.00
0180Utility fixture- sample point, furnish & install, 8" (1080-32108)EACH11$1,900.00$940.00$16,000
0185Fire hydrant, F&I, standard, 1 hose, 6" (1644-111-08)EACH1$9,500.00$8,450.00$11,000
0190Fire hydrant, remove (1644-900)EACH1$1,780.50$1,050.00$1,200.00
FDOT contract T7533: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy