FDOT contract T5880 bid tabulation

SR 5A (NOVA RD) FROM FLOMICH ST TO US 1. Let by Florida DOT on April 29, 2026, Volusia, District 5. 3 bids received; low bid $10,094,241 by Halifax Paving, Inc..

Owner
Florida DOT
Letting
29 APR 2026
Pay items
171
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Halifax Paving, Inc.$10,094,241Low
2Masci General Contractors, Inc$10,393,428+3.0%
3C.W. Roberts Contracting, Inc.$10,619,834+5.0%
FDOT contract T5880: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Halifax Paving, Inc.2. Masci General Contractors, Inc3. C.W. Roberts Contracting, Inc.
0005Mobilization (0101-1)LS1$1,007,862$669,484$420,000
0010Maintenance of traffic (0102-1)DA1$443,000$165,120$276,000
0015Pedestrian escort/flagger (0102-5)HR800$35.00$50.00$30.00
0020Traffic control officer (0102-14)HR472$125.00$90.00$105.00
0025Work zone sign (0102-60)ED45,462$0.20$0.21$0.25
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF3,624$40.00$41.00$42.00
0035Temporary barrier, relocate, low profile concrete (0102-71-23)LF882$15.00$9.50$15.50
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED86,955$0.09$0.11$0.11
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD8,910$0.08$0.07$0.17
0050Arrow board / advance warning arrow panel (0102-76)ED1,372$5.00$4.75$5.50
0055Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH917$5.00$6.25$5.30
0060Portable changeable message sign, temporary (0102-99)ED734$10.00$11.00$12.00
0065Temporary signalization and maintenance, intersection (0102-104)ED3,240$26.50$17.00$29.50
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED3,337$1.00$17.00$1.10
0075Type III barricade (0102-115)ED972$0.28$0.28$0.40
0080Sediment barrier (0104-10-3)LF3,003$2.00$1.00$1.00
0085Inlet protection system (0104-18)EACH187$150.00$100.00$115.00
0090Litter removal (0107-1)ACRE464.41$55.00$58.00$39.00
0095Mowing (0107-2)ACRE177.59$95.00$97.00$87.00
0100Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$20,000$7,500.00$18,000
0105Monitor existing structures- vibration monitoring (0108-2)LS1$20,000$12,500$22,000
0110Clearing & grubbing (0110-1-1)ACRE1$55,000$30,000$55,000
0115Removal of existing concrete (0110-4-10)SY2,073$50.00$14.50$37.00
0120Regular excavation (0120-1)CY397.30$100.00$14.50$18.00
0125Embankment (0120-6)CY790.70$50.00$15.00$29.00
0130Type B stabilization (0160-4)SY1,013$30.00$7.00$7.40
0135Optional base, base group 09 (0285-709)SY1,048$52.00$27.40$103.00
0140Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY179,578$2.75$2.10$2.40
0145Superpave asphaltic conc, traffic B (0334-1-12)TN230.60$200.00$115.20$300.00
0150Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN22,892$140.00$130.56$167.00
0155Inlets, curb, type 10, <10' (0425-1211)EACH7$9,000.00$9,801.00$10,500
0160Inlets, curb, type P-5, <10' (0425-1351)EACH1$9,500.00$10,724$11,100
0165Inlets, curb, type P-6, <10' (0425-1361)EACH1$10,000$11,450$11,700
0170Manholes, P-8, <10' (0425-2-61)EACH1$8,000.00$9,237.00$9,350.00
0175Manholes, J-7, partial (0425-2-73)EACH1$5,000.00$7,587.00$5,800.00
0180Manhole, adjust (0425-5)EACH15$1,000.00$950.00$550.00
0185Manhole, adjust, utilities (0425-5-1)EACH7$1,000.00$950.00$795.00
0190Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF794$110.00$137.59$128.00
0195Concrete curb & gutter, type F (0520-1-10)LF4,300$21.00$35.00$36.00
0200Concrete curb, type A (0520-2-1)LF305$25.00$35.00$83.00
0205Concrete curb, type D (0520-2-4)LF28$40.00$35.00$49.00
0210Traffic separator concrete- type I, 4' wide (0520-5-11)LF722$28.00$105.30$58.00
0215Concrete traffic separator, special- variable width (0520-70)SY26$100.00$175.90$155.00
0220Concrete sidewalk and driveways, 4" thick (0522-1)SY690$48.00$63.25$69.00
0225Concrete sidewalk and driveways, 6" thick (0522-2)SY1,031$60.00$87.54$138.00
0230Detectable warnings (0527-2)SF2,115$40.00$24.00$25.00
0235Performance turf, sod (0570-1-2)SY1,124$8.00$4.50$11.00
0240Conduit, furnish & install, open trench (0630-2-11)LF298$23.50$30.37$26.00
0245Conduit, furnish & install, directional bore (0630-2-12)LF181$30.00$38.88$34.00
0250Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,180.00$1,772.38$1,328.00
0255Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH22$2,006.00$2,869.01$2,258.00
0260Traffic monitoring site inductive loop assembly, & install, 1 loop (0695-6-11)EACH44$956.00$1,792.72$1,076.00
0265Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH2$7,834.00$9,062.01$8,819.00
0270Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$1,037.00$1,215.40$1,167.00
0275Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.71$1,300.00$1,729.00$1,390.00
0280Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.13$850.00$935.00$912.00
0285Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.13$850.00$935.00$898.00
0290Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM1.68$1,300.00$1,729.00$1,403.00
0295Initial contingency amount, DO not bid (0999-25)LS1$102,500$102,500$102,500
0300Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH47$410.00$650.00$661.00
0305Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH10$2,100.00$2,800.00$2,530.00
0310Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH7$2,500.00$3,200.00$3,088.00
0315Single column ground sign assembly, relocate (0700-1500)EACH3$100.00$375.00$641.00
0320Single column ground sign assembly, remove (0700-1600)EACH52$35.00$30.00$113.00
0325Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH9$250.00$220.00$235.00
0330Sign panel, remove, UP to 12 SF (0700-3601)EACH8$35.00$30.00$113.00
0335Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH31$125.00$110.00$211.00
0340Delineator, flexible tubular (0705-11-1)EACH12$125.00$110.00$160.00
0345Raised pavement marker, type B (0706-1-3)EACH3,615$5.00$6.30$5.50
0350Painted pavement markings, surface (0710-90)LS1$74,128$71,495$81,000
0355Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.28$5,600.00$8,032.50$5,948.00
0360Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF7,620$4.00$3.36$4.50
0365Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF296$4.25$5.25$4.65
0370Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,744$6.00$6.30$6.50
0375Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.89$2,200.00$2,934.75$2,356.00
0380Thermoplastic, standard, message or symbol (0711-11160)EACH19$125.00$189.00$135.00
0385Thermoplastic, standard, arrow (0711-11170)EACH177$85.00$92.40$92.00
0390Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF107$4.25$5.25$4.65
0395Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.16$2,200.00$2,934.75$2,289.00
0400Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF4,268$15.00$17.06$16.00
0405Thermoplastic, preformed, white, message (0711-14160)EACH2$150.00$383.25$162.00
0410Thermoplastic, preformed, white, arrow (0711-14170)EACH2$100.00$173.25$108.00
0415Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF347$16.00$11.03$17.00
0420Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM10.73$4,900.00$5,701.50$5,297.00
0425Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.26$5,600.00$8,258.25$6,035.00
0430Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM10.75$2,200.00$2,205.00$2,378.00
0435Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM7.32$4,900.00$5,701.50$5,295.00
0440Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.39$2,200.00$2,205.00$2,361.00
0445Conduit, furnish & install, directional bore (0630-2-12)LF484$24.00$26.56$27.00
0450Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH4$2,951.00$1,807.32$3,300.00
0455Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF954$2.65$2.31$3.00
0460Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF737$3.25$4.66$3.60
0465Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF596$1.00$0.97$2.00
0470Lighting repairs and retrofits, LED retrofit kit for existing luminaire (0715-21-2)EACH7$2,023.00$2,231.54$2,270.00
0475Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552)EACH1$14,974$16,950$16,800
0480Light pole complete, remove pole and foundation (0715-69000)EACH1$2,064.00$3,210.00$2,300.00
0485Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH8$802.00$865.20$900.00
0490Conduit, furnish & install, open trench (0630-2-11)LF3,611$16.00$21.36$18.00
0495Conduit, furnish & install, directional bore (0630-2-12)LF7,418$29.50$42.75$33.00
0500Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI10$12,663$19,544$14,250
0505Signal cable, remove- intersection (0632-7-6)PI9$1,502.00$3,403.12$1,690.00
0510Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF267$4.75$4.12$6.00
0515Fiber optic connection, install, splice (0633-2-31)EACH24$55.50$53.93$63.00
0520Fiber optic connection, install, termination (0633-2-32)EACH24$92.00$83.40$104.00
0525Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH2$104.00$222.81$117.00
0530Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH2$1,425.00$1,786.26$1,604.00
0535Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH2$123.00$264.33$139.00
0540Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH2$645.00$1,550.03$726.00
0545Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH252$1,767.00$3,134.97$1,989.00
0550Electrical power service, F&I, underground, meter by contractor (0639-1122)AS10$6,423.00$6,064.62$7,203.00
0555Electrical power service, remove underground (0639-1620)AS2$988.00$729.24$1,111.00
0560Electrical service wire, & install (0639-2-1)LF131$7.50$6.74$9.00
0565Electrical service wire, (0639-2-6)LF66$2.95$0.97$4.00
0570Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH2$493.00$729.24$555.00
0575Prestressed concrete pole, type P-II service pole (0641-2-12)EACH8$2,411.00$3,029.24$2,714.00
0580Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH7$300.00$992.32$338.00
0585Aluminum signals pole, (0646-1-11)EACH48$2,670.00$4,171.50$3,006.00
0590Aluminum signals pole, remove (0646-1-60)EACH11$300.00$729.24$338.00
0595Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$63,144$64,892$72,000
0600Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$77,434$74,900$87,170
0605Steel mast arm assembly, and install, double arm 70'-70' (0649-21-20)EACH1$12,349$114,394$135,000
0610Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS94$1,476.00$2,108.59$1,600.00
0615Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS2$2,526.00$3,139.64$2,800.00
0620Vehicular traffic signal, furnish & install 5 section cluster, 1 way (0650-1-39)AS10$2,345.00$3,244.98$2,600.00
0625Vehicular traffic signal, remove- poles to remain (0650-1-60)AS93$250.00$455.78$280.00
0630Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS47$872.00$1,051.87$980.00
0635Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$1,832.00$2,105.00$2,000.00
0640Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS23$100.00$277.00$113.00
0645Loop detector inductive, F&I, type 9 (0660-1109)EACH126$355.00$613.48$400.00
0650Loop assembly, F&I, type B (0660-2102)AS124$1,403.00$1,790.50$1,580.00
0655Loop assembly, F&I, type F (0660-2106)AS101$1,350.00$2,096.57$1,580.00
0660Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$19,836$20,980$22,330
0665Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH4$6,561.00$10,829$7,300.00
0670Vehicle detection system- remove cabinet equipment (0660-4-61)EACH2$674.00$10,829$760.00
0675Vehicle detection system- remove above ground (0660-4-62)EACH18$300.00$1,093.86$338.00
0680Signal priority and preemption system, furnish and install, detector (0663-1122)EACH2$8,552.00$10,590$9,627.00
0685Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH2$8,966.00$10,731$10,000
0690Signal priority & preemption system, relocate (0663-1400)EACH5$1,217.00$6,078.00$1,370.00
0695Signal priority & preemption system, adjust/modify (0663-1500)EACH1$1,593.00$1,155.00$1,800.00
0700Pedestrian detector, furnish & install, accessible (0665-1-12)EACH53$1,512.00$2,045.95$1,700.00
0705Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH27$163.00$277.00$183.00
0710Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$48,897$54,829$55,047
0715Traffic controller assembly, relocate controller with cabinet (0670-5500)AS2$7,723.00$15,062$8,600.00
0720Traffic controller, relocate- without cabinet (0671-2-50)EACH5$2,923.00$5,300.00$3,300.00
0725Traffic signal controller cabinet, furnish & install without controller, NEMA 44" W X 72" H X 24" D (0676-1117)EACH6$40,473$44,745$45,500
0730Traffic signal controller cabinet, remove (0676-1600)EACH6$1,467.00$4,132.36$1,650.00
0735ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH1$8,024.00$7,975.00$9,000.00
0740Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,285.00$5,797.00$4,825.00
0745Managed field ethernet switch, relocate (0684-1-4)EACH6$1,230.00$1,161.23$1,385.00
0750Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14)EACH10$14,305$14,361$16,100
0755Uninterruptible power supply, remove- pole/cabinet remains (0685-1-60)EACH1$964.00$1,109.00$1,086.00
0760Remote power management rpmu, furnish and install (0685-2-1)EACH9$1,263.00$1,400.00$1,422.00
0765Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$776.00$1,138.29$827.00
0770Sign panel, install, UP to 12 SF (0700-3401)EACH21$50.00$777.00$54.00
0775Sign panel, remove, UP to 12 SF (0700-3601)EACH44$53.00$277.00$56.00
0780Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$3,461.00$5,549.00$3,687.00
0785Itsfm subsurface documentation- project length (0611-1-1)MI3.91$4,102.00$4,253.90$4,617.00
0790Itsfm location documentation- intersection (0611-2-1)EACH8$1,641.00$2,100.00$1,850.00
0795Conduit, furnish & install, open trench (0630-2-11)LF69$13.50$15.59$15.00
0800Conduit, furnish & install, directional bore (0630-2-12)LF532$20.50$22.78$23.00
0805Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,792$4.75$4.12$5.50
0810Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF15,314$5.20$4.46$5.80
0815Fiber optic connection, install, splice (0633-2-31)EACH360$55.50$53.93$62.50
0820Fiber optic connection hardware, F&I, splice (0633-3-11)EACH7$1,536.00$1,747.40$1,729.00
0825Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH37$61.50$64.26$70.00
0830Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH97$67.50$69.21$76.00
0835Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH16$1,751.00$1,786.26$1,971.00
0840Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH2$953.00$1,550.00$1,073.00
0845Fiber optic cable locator (0633-6)DA360$190.00$212.70$213.00
0850Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$3,147.00$3,349.76$3,542.00
0855Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH8$7,054.00$5,827.44$7,941.00
FDOT contract T5880: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy