FDOT contract T5881 bid tabulation

SR 5 (US 1) FROM SR 400 (BEVILLE RD) TO N OF FAIRVIEW AVE. Let by Florida DOT on April 29, 2026, Volusia, District 5. 2 bids received; low bid $9,229,481 by Masci General Contractors, Inc.

Owner
Florida DOT
Letting
29 APR 2026
Pay items
188
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Masci General Contractors, Inc$9,229,481Low
2C.W. Roberts Contracting, Inc.$9,470,529+3.0%
FDOT contract T5881: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Masci General Contractors, Inc2. C.W. Roberts Contracting, Inc.
0005Mobilization (0101-1)LS1$647,365$490,000
0010Maintenance of traffic (0102-1)DA1$172,000$200,000
0015Pedestrian or bicycle special detour (0102-4-1)SY1$11,000$15,000
0020Pedestrian escort/flagger (0102-5)HR723$55.00$33.00
0025Traffic control officer (0102-14)HR504$95.00$117.00
0030Work zone sign (0102-60)ED67,535$0.23$0.22
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED268,851$0.11$0.10
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD24,425$0.07$0.09
0045Arrow board / advance warning arrow panel (0102-76)ED862$4.75$5.20
0050Portable changeable message sign, temporary (0102-99)ED1,148$11.00$10.25
0055Temporary signalization and maintenance, intersection (0102-104)ED4,300$25.04$37.00
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED4,300$6.90$1.15
0065Type III barricade (0102-115)ED3,613$0.28$0.32
0070Radar speed display unit (0102-150-2)ED628$4.95$5.10
0075Inlet protection system (0104-18)EACH78$100.00$150.00
0080Litter removal (0107-1)ACRE287.54$67.00$40.00
0085Mowing (0107-2)ACRE139.31$140.00$34.00
0090Monitor existing structures- vibration monitoring (0108-2)LS1$18,400$21,500
0095Clearing & grubbing (0110-1-1)ACRE1$30,000$82,000
0100Selective clearing and areas with trees to remain (0110-2-2)ACRE0.32$90,000$50,000
0105Removal of existing concrete (0110-4-10)SY3,859$15.00$34.00
0110Tree protection barrier (0110-21)LF1,432$5.95$3.50
0115Regular excavation (0120-1)CY102.20$15.00$100.00
0120Embankment (0120-6)CY260$15.00$75.00
0125Optional base, base group 09 (0285-709)SY80$29.50$116.00
0130Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY95,291$2.65$2.20
0135Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY27,529$1.80$6.20
0140Superpave asphaltic conc, traffic C (0334-1-13)TN9,427.80$115.20$111.00
0145Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN10,132.60$131.56$155.00
0150Inlets, curb, type P-4, <10' (0425-1341)EACH4$12,036$8,650.00
0155Inlets, curb, type P-5, <10' (0425-1351)EACH1$10,156$8,135.00
0160Inlets, DT bot, type C,<10' (0425-1521)EACH1$7,953.00$5,295.00
0165Inlets, gutter, type V, <10' (0425-1711)EACH1$11,059$7,800.00
0170Manholes, P-7, <10' (0425-2-41)EACH4$7,602.00$5,750.00
0175Manholes, P-7, partial (0425-2-43)EACH2$7,602.00$2,495.00
0180Manholes, P-8, <10' (0425-2-61)EACH1$8,652.00$5,800.00
0185Manhole, adjust (0425-5)EACH4$1,100.00$821.00
0190Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF94$210.59$265.00
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF23$210.59$261.00
0200Trench drain, standard (0436-1-1)LF30$425.95$1,398.00
0205Concrete curb & gutter, type E (0520-1-7)LF928$42.50$33.00
0210Concrete curb & gutter, type F (0520-1-10)LF1,814$46.35$41.00
0215Concrete curb, type A (0520-2-1)LF2,461$41.29$26.00
0220Concrete curb, type D (0520-2-4)LF308$42.15$40.00
0225Traffic separator concrete- type I, 4' wide (0520-5-11)LF1,396$118.29$71.00
0230Concrete traffic separator, special- variable width (0520-70)SY986$221.39$118.00
0235Concrete sidewalk and driveways, 4" thick (0522-1)SY380$79.11$117.50
0240Concrete sidewalk and driveways, 6" thick (0522-2)SY1,075$95.23$137.00
0245Pavers, architectural, (0526-1-2)SY61$147.52$317.00
0250Detectable warnings (0527-2)SF2,105$24.00$24.00
0255Performance turf, sod (0570-1-2)SY1,922$4.50$25.00
0260Raised pavement marker, type B (0706-1-3)EACH1,673$5.00$5.25
0265Painted pavement markings, standard, white, solid, 6" (0710-11101)GM8.13$1,751.00$1,925.00
0270Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.22$3,300.00$3,300.00
0275Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF4,490$1.10$1.08
0280Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF252$2.20$2.30
0285Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF4,954$2.35$2.30
0290Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM4.32$675.00$715.00
0295Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM3.18$800.00$825.00
0300Painted pavement markings, standard, white, message or symbol (0710-11160)EACH134$69.00$72.00
0305Painted pavement markings, standard, white, arrows (0710-11170)EACH78$49.25$49.50
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM3.16$1,785.00$1,900.00
0315Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF40$2.30$2.30
0320Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.03$899.00$932.00
0325Initial contingency amount, DO not bid (0999-25)LS1$93,500$93,500
0330Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH69$603.00$630.00
0335Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH17$2,615.00$2,200.00
0340Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$2,990.00$2,750.00
0345Single column ground sign assembly, relocate (0700-1500)EACH2$220.00$535.00
0350Single column ground sign assembly, remove (0700-1600)EACH20$73.00$108.00
0355Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH119$325.00$350.00
0360Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH16$1,455.00$755.00
0365Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH8$1,825.00$1,020.00
0370Sign panel, remove, UP to 12 SF (0700-3601)EACH152$55.00$107.00
0375Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$6,199.00$3,850.00
0380Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH36$115.00$180.00
0385Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160)EACH3$10,290$9,450.00
0390Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH4$9,284.00$8,200.00
0395Tubular marker, 36" yellow (0704-1-4)EACH31$210.00$255.00
0400Object marker, type 3 (0705-10-3)EACH4$185.00$112.00
0405Raised pavement marker, type B (0706-1-3)EACH1,673$5.00$5.50
0410Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF148$5.15$5.75
0415Painted pavement markings, surface (0710-90)LS1$65,000$62,000
0420Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF7,290$4.10$4.50
0425Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF261$5.15$5.75
0430Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,928$7.35$7.75
0435Thermoplastic, standard, vertical deflection marking (0711-11130)EACH22$52.00$55.15
0440Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM3.33$2,060.00$2,300.00
0445Thermoplastic, standard, message or symbol (0711-11160)EACH1$200.00$168.00
0450Thermoplastic, standard, arrow (0711-11170)EACH129$110.00$110.00
0455Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF188$5.15$5.70
0460Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.03$2,060.00$2,300.00
0465Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF4,659$13.00$14.00
0470Thermoplastic, preformed, white, message (0711-14160)EACH73$210.00$222.00
0475Thermoplastic, preformed, white, arrow (0711-14170)EACH73$100.00$105.00
0480Thermoplastic, preformed, color, in pavement warning (0711-14760)EACH16$900.00$935.00
0485Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM9.23$5,400.00$6,000.00
0490Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.24$9,600.00$10,500
0495Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM4.63$1,600.00$1,660.00
0500Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM5.42$5,400.00$5,900.00
0505Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF74$5.15$5.55
0510Itsfm subsurface documentation- project length (0611-1-1)MI2.92$4,253.90$4,950.00
0515Itsfm location documentation- intersection (0611-2-1)EACH6$1,944.64$2,000.00
0520Conduit, furnish & install, open trench (0630-2-11)LF1,188$21.92$19.00
0525Conduit, furnish & install, directional bore (0630-2-12)LF3,834$33.68$38.00
0530Conduit, furnish & install, aboveground (0630-2-14)LF330$67.42$49.25
0535Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI9$9,671.20$11,200
0540Signal cable- repair/replace/other, furnish & install (0632-7-2)LF30$7.07$10.75
0545Signal cable, remove- intersection (0632-7-6)PI3$4,861.60$1,850.00
0550Fiber optic cable, F&I, overhead, 2-12 fibers (0633-1111)LF556$4.95$5.75
0555Fiber optic cable, F&I, overhead,13-48 fibers (0633-1112)LF1,108$4.85$8.75
0560Fiber optic cable, F&I, overhead,49-96 fibers (0633-1113)LF8,954$5.25$6.25
0565Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,921$3.77$5.75
0570Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF201$3.91$8.90
0575Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF2,006$4.05$6.25
0580Fiber optic cable, relocate, underground (0633-1420)LF320$2.62$4.50
0585Fiber optic connection, install, splice (0633-2-31)EACH180$56.50$66.00
0590Fiber optic connection, install, termination (0633-2-32)EACH102$86.73$120.00
0595Fiber optic connection hardware, F&I, splice (0633-3-11)EACH5$1,749.00$1,850.00
0600Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH16$67.10$73.50
0605Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH16$184.46$126.00
0610Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH10$2,341.00$2,825.00
0615Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH4$1,483.22$1,175.00
0620Fiber optic connection hardware, adjust/modify patch panel (0633-3-56)EACH2$1,033.09$865.00
0625Fiber optic cable locator (0633-6)DA430$189.31$235.00
0630Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF164$5.52$6.35
0635Span wire assembly, adjust (0634-4400)PI1$4,569.00$3,800.00
0640Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH127$1,999.00$1,350.00
0645Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH16$3,310.74$3,400.00
0650Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$5,258.63$7,350.00
0655Electrical power service, F&I, underground, meter by contractor (0639-1122)AS6$4,682.08$7,700.00
0660Electrical service wire, & install (0639-2-1)LF1,664$5.82$9.10
0665Electrical service disconnect, F&I, pole mount (0639-3-11)EACH6$3,010.00$2,860.00
0670Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$50,000$50,000
0675Prestressed concrete pole, type P-II service pole (0641-2-12)EACH6$3,436.88$3,100.00
0680Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$999.00$360.00
0685Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH2$13,779$35,000
0690Aluminum signals pole, (0646-1-11)EACH36$3,063.00$3,050.00
0695Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH5$2,736.96$2,700.00
0700Aluminum signals pole, (0646-1-40)EACH8$1,930.61$2,175.00
0705Aluminum signals pole, remove (0646-1-60)EACH5$999.00$360.00
0710Steel mast arm assembly, and install, double arm 30'-30' (0649-21-2)EACH4$86,532$90,000
0715Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13)EACH1$97,120$106,000
0720Steel mast arm assembly, and install, double arm 60'-60' (0649-21-14)EACH1$97,120$118,000
0725Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS8$1,760.29$1,650.00
0730Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS4$2,156.35$2,125.00
0735Vehicular traffic signal, furnish & install 5 section cluster, 1 way (0650-1-39)AS1$2,910.00$2,710.00
0740Vehicular traffic signal, remove- poles to remain (0650-1-60)AS1$350.00$310.00
0745Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS4$1,011.91$775.00
0750Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH15$516.06$685.00
0755Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS38$857.51$950.00
0760Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$1,683.20$1,950.00
0765Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS21$254.00$121.00
0770Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10)AS16$2,463.90$2,350.00
0775Loop assembly, F&I, type B (0660-2102)AS22$1,529.00$1,550.00
0780Loop assembly, F&I, type F (0660-2106)AS33$2,390.00$1,625.00
0785Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH2$18,131$21,500
0790Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$11,000$12,400
0795Signal priority and preemption system, furnish and install, detector (0663-1122)EACH10$9,854.31$11,100
0800Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH10$8,423.00$11,000
0805Pedestrian detector, furnish & install, accessible (0665-1-12)EACH47$2,349.00$2,450.00
0810Pedestrian detector, relocate (0665-1-40)EACH1$299.00$295.00
0815Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH22$121.54$222.00
0820Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS6$54,716$55,000
0825Traffic controller assembly, remove controller with (0670-5600)AS2$2,066.19$1,825.00
0830Traffic controller, modify (0671-2-40)EACH8$2,916.96$2,325.00
0835ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$7,595.00$10,300
0840ITS CCTV camera, relocate (0682-1400)EACH1$2,649.00$4,925.00
0845ITS CCTV camera, remove & disposal (0682-1600)EACH1$1,795.00$730.00
0850Managed field ethernet switch, furnish & install (0684-1-1)EACH7$5,197.50$4,510.00
0855Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH6$12,835$14,600
0860Remote power management rpmu, furnish and install (0685-2-1)EACH6$765.28$2,300.00
0865Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$2,935.50$2,500.00
0870Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$3,220.81$1,225.00
0875Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$1,010.00$1,275.00
0880Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$6,036.00$3,750.00
0885Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF1,196$3.79$4.95
0890Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH8$2,181.64$3,020.00
0895Landscape complete- small plants (0580-1-1)LS1$35,867$37,500
0900Landscape complete- large plants (0580-1-2)LS1$6,484.00$9,500.00
0905Initial contingency amount, DO not bid (0999-25)LS1$3,500.00$3,500.00
0910Utility pipe,remove & dispose, 5- 7.9" (1050-16003)LF390$11.50$70.00
0915Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206)LF725$459.87$130.00
0920Utility structure, furnish and install- replace existing rim (1060-31-1)EACH7$850.00$2,700.00
0925Utility structure, furnish and install- replace existing cover (1060-31-2)EACH7$850.00$420.00
0930Utility fixture, valve assembly, adjust/modify (1080-24500)EACH44$575.00$193.00
0935Utility fixture- line stop assembly, furnish and install, (1080-27106)EACH8$12,900$32,000
0940Fire hydrant, relocate (1644-800)EACH2$4,250.00$7,100.00
FDOT contract T5881: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy