SR 400 (I-4) FROM MP 21.540 TO MP 22.558. Let by Florida DOT on June 15, 2026, Volusia, District 5. 4 bids received; low bid $42,416,429 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 15 JUN 2026
- Pay items
- 211
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $42,416,429 | Low |
| 2 | Masci General Contractors, Inc | $44,188,167 | +4.0% |
| 3 | Southland Construction, Inc. | $45,277,778 | +7.0% |
| 4 | Halifax Paving, Inc. | $47,557,933 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Masci General Contractors, Inc | 3. Southland Construction, Inc. | 4. Halifax Paving, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $3,200,000 | $2,953,845 | $1,476,000 | $3,750,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $150,000 | $196,000 | $320,432 | $219,500 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $300,000 | $147,100 | $247,000 | $250,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $11,000 | $2,100.00 | $1,000.00 | $500.00 |
| 0025 | Work zone sign (0102-60) | ED | 9,808 | $0.23 | $0.23 | $0.23 | $0.22 |
| 0030 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 6,150 | $42.00 | $41.00 | $42.40 | $42.00 |
| 0035 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 4,063 | $24.00 | $25.00 | $25.70 | $16.00 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 23,382 | $0.12 | $0.12 | $0.11 | $0.09 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 20 | $8.70 | $10.00 | $9.00 | $6.00 |
| 0050 | Temporary crash cushion, redirective option (0102-89-1) | LO | 5 | $1,034.00 | $1,850.00 | $1,120.00 | $1,500.00 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 968 | $10.80 | $12.00 | $11.15 | $11.00 |
| 0060 | Existing ITS maintenance (0102-112) | DA | 450 | $175.00 | $190.00 | $160.00 | $159.50 |
| 0065 | Type III barricade (0102-115) | ED | 1,488 | $0.30 | $0.30 | $0.30 | $0.30 |
| 0070 | Portable regulatory, sign (0102-150-1) | ED | 40 | $8.70 | $10.00 | $8.90 | $6.00 |
| 0075 | Radar speed display unit (0102-150-2) | ED | 20 | $10.80 | $12.00 | $11.15 | $6.00 |
| 0080 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 2.32 | $4,636.00 | $5,500.00 | $4,700.00 | $6,650.00 |
| 0085 | Removable tape, white, solid 6" (0102-913-21) | GM | 1.63 | $13,405 | $13,650 | $14,000 | $14,250 |
| 0090 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 2.32 | $4,636.00 | $5,500.00 | $4,700.00 | $6,650.00 |
| 0095 | Removable tape, yellow, solid, (0102-913-31) | GM | 1.31 | $13,400 | $13,650 | $14,000 | $14,250 |
| 0100 | Sediment barrier (0104-10-3) | LF | 4,149 | $2.00 | $1.50 | $1.01 | $1.60 |
| 0105 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 5,086 | $6.25 | $5.90 | $5.27 | $9.50 |
| 0110 | Soil tracking prevention device (0104-15) | EACH | 2 | $16,000 | $3,900.00 | $3,650.00 | $7,500.00 |
| 0115 | Inlet protection system (0104-18) | EACH | 7 | $105.00 | $150.00 | $220.00 | $150.00 |
| 0120 | Litter removal (0107-1) | ACRE | 273.94 | $21.50 | $24.00 | $20.00 | $55.00 |
| 0125 | Mowing (0107-2) | ACRE | 593.55 | $65.00 | $63.00 | $62.00 | $95.00 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $600,000 | $255,855 | $1,030,000 | $625,000 |
| 0135 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 2.19 | $6,265.00 | $12,045 | $5,000.00 | $10,000 |
| 0140 | Tree protection barrier (0110-21) | LF | 10,756 | $3.65 | $5.95 | $4.95 | $4.80 |
| 0145 | Regular excavation (0120-1) | CY | 95,671 | $6.00 | $4.25 | $7.25 | $6.00 |
| 0150 | Subsoil excavation (0120-4) | CY | 77,876.10 | $9.00 | $4.25 | $13.80 | $10.00 |
| 0155 | Embankment (0120-6) | CY | 437,752.40 | $12.50 | $19.10 | $19.05 | $21.00 |
| 0160 | Type B stabilization (0160-4) | SY | 116,288 | $4.25 | $10.00 | $4.30 | $6.50 |
| 0165 | Optional base, base group 01 (0285-701) | SY | 4,406 | $35.00 | $30.71 | $36.90 | $34.00 |
| 0170 | Optional base, base group 04 (0285-704) | SY | 2,872 | $18.50 | $37.58 | $21.25 | $22.00 |
| 0175 | Optional base, base group 09 (0285-709) | SY | 58,508 | $26.50 | $33.91 | $26.70 | $30.00 |
| 0180 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 691.90 | $170.00 | $179.50 | $189.30 | $150.00 |
| 0185 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 8,033.90 | $132.00 | $159.25 | $133.65 | $135.00 |
| 0190 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 4,421.40 | $158.00 | $179.85 | $152.50 | $160.00 |
| 0195 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 343.10 | $190.00 | $212.45 | $192.70 | $180.00 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 55.80 | $400.00 | $285.39 | $390.00 | $300.00 |
| 0205 | Plain cement concrete 10" (0350-3-9) | SY | 57 | $223.25 | $144.85 | $125.00 | $200.00 |
| 0210 | Plain cement concrete 12" (0350-3-13) | SY | 4,349 | $177.00 | $161.50 | $125.00 | $158.30 |
| 0215 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 10,737 | $5.15 | $6.15 | $5.70 | $4.62 |
| 0220 | Grinding concrete pavement (0352-70) | SY | 5,161 | $10.30 | $6.45 | $10.45 | $6.78 |
| 0225 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 9 | $4,417.00 | $7,970.00 | $7,740.00 | $4,000.00 |
| 0230 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $8,835.00 | $15,260 | $10,700 | $8,000.00 |
| 0235 | Inlets, DT bot, type C, jbot, >10' (0425-1524) | EACH | 1 | $11,043 | $19,523 | $11,600 | $10,000 |
| 0240 | Inlets, ditch bottom, type G, <10' (0425-1571) | EACH | 30 | $11,485 | $10,550 | $12,000 | $10,400 |
| 0245 | Inlets, ditch bottom, type G, >10' (0425-1572) | EACH | 1 | $16,565 | $12,363 | $17,800 | $15,000 |
| 0250 | Inlets, ditch bottom, type G, J bot, >10' (0425-1574) | EACH | 8 | $17,670 | $8,890.00 | $18,500 | $16,000 |
| 0255 | Inlets, gutter, type S, partial (0425-1705) | EACH | 1 | $6,626.00 | $3,890.00 | $5,300.00 | $6,000.00 |
| 0260 | Manholes, P-7, <10' (0425-2-41) | EACH | 3 | $6,626.00 | $8,312.00 | $7,000.00 | $6,000.00 |
| 0265 | Manholes, P-7, >10' (0425-2-42) | EACH | 6 | $15,461 | $16,560 | $14,450 | $14,000 |
| 0270 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,992 | $77.25 | $137.83 | $150.00 | $70.00 |
| 0275 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 1,304 | $99.30 | $158.57 | $171.60 | $90.00 |
| 0280 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 1,142 | $156.80 | $219.51 | $197.70 | $142.00 |
| 0285 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 439 | $159.00 | $250.91 | $274.20 | $144.00 |
| 0290 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 391 | $201.50 | $298.76 | $294.65 | $182.50 |
| 0295 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 293 | $271.65 | $359.97 | $343.50 | $246.00 |
| 0300 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 2,871 | $393.10 | $495.28 | $429.00 | $356.00 |
| 0305 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 2 | $4,969.00 | $7,900.00 | $6,060.00 | $4,500.00 |
| 0310 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $7,178.00 | $9,990.00 | $8,300.00 | $6,500.00 |
| 0315 | PVC pipe, 8 inch (0430-964-6) | LF | 505 | $36.00 | $45.82 | $66.30 | $53.00 |
| 0320 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $4,086.00 | $3,850.00 | $3,140.00 | $3,700.00 |
| 0325 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 1 | $9,055.00 | $4,500.00 | $5,000.00 | $8,200.00 |
| 0330 | Mitered end section, optional round, 48" CD (0430-982141) | EACH | 1 | $15,681 | $7,500.00 | $9,400.00 | $14,200 |
| 0335 | Mitered end section, optional round, 54" CD (0430-982142) | EACH | 5 | $23,191 | $12,500 | $13,900 | $21,000 |
| 0340 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 1 | $17,228 | $5,500.00 | $8,700.00 | $15,600 |
| 0345 | Underdrain, type I (0440-1-10) | LF | 74 | $133.50 | $57.59 | $59.00 | $121.00 |
| 0350 | Edgedrain draincrete, (0446-1-1) | LF | 3,151 | $32.00 | $45.19 | $66.55 | $35.00 |
| 0355 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 224 | $68.50 | $55.00 | $47.15 | $62.00 |
| 0360 | Concrete curb & gutter, type F (0520-1-10) | LF | 7,634 | $30.65 | $43.50 | $38.80 | $27.54 |
| 0365 | Concrete curb, type D (0520-2-4) | LF | 33 | $42.00 | $74.25 | $39.80 | $27.54 |
| 0370 | Concrete curb, toll header curb (0520-2-10) | LF | 415 | $26.00 | $40.54 | $37.55 | $27.54 |
| 0375 | Shoulder gutter- concrete (0520-6) | LF | 40 | $65.00 | $82.39 | $38.95 | $64.25 |
| 0380 | Concrete traffic separator, special- variable width (0520-70) | SY | 677 | $84.00 | $115.20 | $69.60 | $113.72 |
| 0385 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 6,212 | $43.00 | $41.20 | $67.60 | $45.29 |
| 0390 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 35 | $71.65 | $115.20 | $51.00 | $118.09 |
| 0395 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 228 | $173.00 | $115.00 | $203.80 | $104.66 |
| 0400 | Detectable warnings (0527-2) | SF | 312 | $22.00 | $24.69 | $29.20 | $34.00 |
| 0405 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 45 | $287.00 | $359.58 | $240.00 | $260.00 |
| 0410 | Bedding stone (0530-74) | TN | 33 | $287.00 | $659.25 | $260.00 | $260.00 |
| 0415 | Guardrail -roadway, general (0536-1-1) | LF | 588 | $31.80 | $30.42 | $32.60 | $30.81 |
| 0420 | Guardrail- roadway, double (0536-1-3) | LF | 125 | $40.50 | $45.29 | $41.70 | $39.39 |
| 0425 | Rub rail for guardrail, single sided rub rail (0536-5-1) | LF | 125 | $22.90 | $22.15 | $23.50 | $22.21 |
| 0430 | Guardrail removal (0536-73) | LF | 369 | $3.35 | $4.00 | $3.40 | $3.27 |
| 0435 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,614.00 | $1,815.00 | $1,650.00 | $1,559.82 |
| 0440 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,431.00 | $3,800.00 | $3,510.00 | $3,316.91 |
| 0445 | Guardrail end treatment- double face trailing (0536-85-29) | EACH | 1 | $3,440.00 | $2,500.00 | $3,520.00 | $3,326.13 |
| 0450 | Fencing, type A, 10.1-12.0', special features (0550-10169) | LF | 7,394 | $54.00 | $40.00 | $36.60 | $52.50 |
| 0455 | Fencing, type B, 0.0-5.0', standard features (0550-10210) | LF | 466 | $34.25 | $25.00 | $24.00 | $33.41 |
| 0460 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 1,743 | $31.50 | $28.00 | $27.10 | $30.50 |
| 0465 | Fencing, type B, 5.1-6.0', W/ barb wire attmt (0550-10221) | LF | 403 | $43.00 | $28.00 | $27.10 | $41.96 |
| 0470 | Fence gate, type A, double, 12.1- 18.0' opening (0550-60123) | EACH | 2 | $2,264.00 | $2,999.00 | $2,920.00 | $2,189.25 |
| 0475 | Fence gate, type B, single, 0- 6.0' opening (0550-60211) | EACH | 6 | $403.00 | $2,700.00 | $2,600.00 | $389.25 |
| 0480 | Fence gate, type B, double, 12.1- 18.0' opening (0550-60223) | EACH | 2 | $1,953.00 | $4,100.00 | $3,960.00 | $1,887.75 |
| 0485 | Fence gate, type B, sliding/cantilever, 6.1-12' (0550-60232) | EACH | 1 | $3,391.00 | $4,700.00 | $4,690.00 | $3,278.16 |
| 0490 | Performance turf (0570-1-1) | SY | 24,565 | $1.60 | $0.50 | $3.00 | $0.60 |
| 0495 | Performance turf, sod (0570-1-2) | SY | 164,113 | $3.30 | $4.50 | $3.00 | $4.00 |
| 0500 | Raised pavement marker, type B (0706-1-3) | EACH | 966 | $6.00 | $5.25 | $5.25 | $5.00 |
| 0505 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 11 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0510 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0515 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0520 | Ground-in rumble strips, 16" (0546-72-1) | GM | 1.29 | $19,288 | $6,907.89 | $6,060.00 | $15,120 |
| 0525 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 45 | $585.00 | $593.25 | $590.00 | $793.10 |
| 0530 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 15 | $2,070.00 | $2,100.00 | $2,085.00 | $2,327.71 |
| 0535 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $2,586.00 | $2,625.00 | $2,600.00 | $3,100.90 |
| 0540 | Single column ground sign assembly, remove (0700-1600) | EACH | 1 | $68.00 | $68.25 | $67.80 | $220.00 |
| 0545 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $10,602 | $10,763 | $10,690 | $7,967.30 |
| 0550 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $18,101 | $18,375 | $18,200 | $10,820 |
| 0555 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 10 | $357.00 | $362.25 | $360.00 | $777.26 |
| 0560 | Embedded dynamic message furnish & install- without UPS, full color, UP to 12 SF (0700-7231) | EACH | 2 | $28,167 | $15,971 | $26,000 | $15,210 |
| 0565 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 6 | $42.00 | $42.00 | $41.70 | $62.42 |
| 0570 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 12 | $88.00 | $89.25 | $88.60 | $70.61 |
| 0574 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 4 | $8,016.00 | $6,516.50 | $7,620.00 | $6,206.19 |
| 0580 | Delineator, non-flexible (0705-11-2) | EACH | 151 | $88.00 | $89.25 | $88.66 | $308.28 |
| 0585 | Raised pavement marker, type B (0706-1-3) | EACH | 1,067 | $5.00 | $4.99 | $4.95 | $5.25 |
| 0590 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 191 | $5.20 | $5.25 | $5.22 | $2.85 |
| 0595 | Painted pavement markings, surface (0710-90) | LS | 1 | $21,722 | $22,050 | $21,000 | $33,250 |
| 0600 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.32 | $9,765.00 | $9,975.00 | $9,910.00 | $6,800.00 |
| 0605 | Thermoplastic, standard, solid, 6" for parking spaces (0711-11121) | LF | 17,122 | $3.70 | $3.68 | $3.65 | $1.25 |
| 0610 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 639 | $5.00 | $4.46 | $4.43 | $5.00 |
| 0615 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,228 | $5.00 | $4.99 | $4.95 | $6.00 |
| 0620 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 85 | $7.30 | $7.35 | $7.30 | $8.00 |
| 0625 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.99 | $2,570.00 | $2,625.00 | $2,610.00 | $2,800.00 |
| 0630 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 15 | $207.00 | $210.00 | $210.00 | $225.00 |
| 0635 | Thermoplastic, standard, arrow (0711-11170) | EACH | 24 | $104.00 | $105.00 | $104.30 | $85.00 |
| 0640 | Thermoplastic, standard, yield line (0711-11180) | LF | 15 | $15.60 | $15.75 | $15.65 | $15.00 |
| 0645 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 994 | $5.20 | $5.25 | $6.00 | $6.25 |
| 0650 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 634 | $15.60 | $15.75 | $16.00 | $17.00 |
| 0655 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.92 | $4,953.00 | $5,040.00 | $5,000.00 | $5,500.00 |
| 0660 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.07 | $1,528.00 | $1,680.00 | $1,665.00 | $2,800.00 |
| 0665 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.65 | $4,949.00 | $5,040.00 | $5,000.00 | $5,500.00 |
| 0670 | Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171) | GM | 0.32 | $10,554 | $11,025 | $10,950 | $12,500 |
| 0675 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 2.63 | $9,793.00 | $9,975.00 | $9,900.00 | $12,500 |
| 0680 | Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371) | GM | 0.32 | $10,554 | $11,025 | $10,950 | $12,500 |
| 0685 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 2.63 | $9,792.00 | $9,975.00 | $9,900.00 | $12,500 |
| 0690 | Conduit, furnish & install, open trench (0630-2-11) | LF | 13,780 | $12.00 | $16.38 | $11.47 | $11.29 |
| 0695 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 116 | $2,302.00 | $1,318.53 | $2,190.00 | $1,256.50 |
| 0700 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $7,255.00 | $6,521.50 | $6,900.00 | $5,523.77 |
| 0705 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 48,344 | $2.60 | $6.95 | $2.45 | $1.96 |
| 0710 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 14,499 | $5.50 | $12.81 | $5.22 | $3.46 |
| 0715 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $23,577 | $20,988 | $22,400 | $22,874 |
| 0720 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 36 | $12,035 | $12,498 | $11,440 | $10,060 |
| 0725 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 6 | $12,172 | $12,713 | $11,540 | $10,243 |
| 0730 | Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811) | EACH | 16 | $11,459 | $12,206 | $10,900 | $9,654.43 |
| 0735 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 86 | $944.00 | $918.05 | $800.00 | $729.30 |
| 0740 | Light pole complete- special design, F&I, single arm mount, aluminum, 30' (0715-511130) | EACH | 4 | $11,761 | $12,713 | $11,180 | $9,901.60 |
| 0745 | Light pole complete- special design, F&I, single arm shoulder mount, aluminum, 35' (0715-511135) | EACH | 3 | $11,953 | $12,810 | $11,360 | $10,060 |
| 0750 | Light pole complete- special design, F&I, single arm shoulder mount, aluminum, 45' (0715-511145) | EACH | 4 | $13,927 | $14,100 | $13,240 | $11,349 |
| 0755 | Light pole complete special design , F&I, single arm mount, aluminum, 50' (0715-511150) | EACH | 1 | $14,672 | $14,197 | $13,956 | $11,979 |
| 0760 | Light pole complete- special design, F&I, double arm mount, aluminum, 35' (0715-512135) | EACH | 10 | $17,545 | $21,342 | $16,680 | $14,486 |
| 0765 | Light pole complete- special design, F&I, double arm mount, aluminum, 40' (0715-512140) | EACH | 4 | $18,040 | $21,758 | $17,100 | $14,827 |
| 0770 | Light pole complete- special design, F&I, double arm mount, aluminum, 45' (0715-512145) | EACH | 2 | $18,861 | $22,008 | $17,940 | $15,169 |
| 0775 | Bollards (0519-78) | EACH | 5 | $6,266.00 | $1,800.00 | $2,900.00 | $3,500.00 |
| 0780 | Conduit, furnish & install, open trench (0630-2-11) | LF | 11,510 | $59.00 | $16.38 | $59.45 | $32.27 |
| 0785 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 4 | $6,593.00 | $4,316.67 | $6,640.00 | $5,021.50 |
| 0790 | Pull box, HS-20, furnish & 24" X 36" (0635-2219) | EACH | 46 | $6,035.00 | $3,829.61 | $6,085.00 | $2,608.10 |
| 0795 | Pull box, HS-20, furnish & 13" X 24" (0635-2220) | EACH | 27 | $3,268.00 | $2,016.60 | $3,290.00 | $1,605.92 |
| 0800 | EV power conduit vault, 11' X 21' 9.5' (10' X 20' X 8') (0635-2221) | EACH | 6 | $58,957 | $39,586 | $59,400 | $97,535 |
| 0805 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $25,548 | $6,663.54 | $25,700 | $13,829 |
| 0810 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 62 | $23,272 | $5,796.80 | $23,400 | $35,180 |
| 0815 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $3,255,899 | $3,255,899 | $3,255,899 | $3,255,899 |
| 0820 | Architectural, building, new, rest area (0750-1-11) | SF | 1 | $6,816,689 | $5,527,275 | $7,920,000 | $6,900,000 |
| 0825 | Architectural, building, new, storage/mechanical (0750-1-17) | SF | 1 | $385,388 | $325,460 | $460,000 | $400,000 |
| 0830 | Architectural-water, sanitary sewer/sewage treatment (0751-5) | LS | 1 | $2,610,848 | $3,257,597 | $1,770,000 | $3,360,000 |
| 0835 | Architectural, picnic pavilion, small (0751-30-1) | EACH | 5 | $31,306 | $39,500 | $65,000 | $30,000 |
| 0840 | Trash receptacle (0751-37) | EACH | 43 | $2,601.00 | $4,200.00 | $2,660.00 | $2,500.00 |
| 0845 | Trash receptacle- ash urn (0751-37-1) | EACH | 36 | $1,441.00 | $2,970.00 | $950.00 | $1,380.00 |
| 0850 | Trash receptacle- dog waste (0751-37-2) | EACH | 15 | $1,384.00 | $2,470.00 | $1,050.00 | $1,325.00 |
| 0855 | Bench, F&I, concrete (0751-38-13) | EACH | 7 | $3,458.00 | $5,870.00 | $2,470.00 | $3,312.00 |
| 0860 | Flag pole, 26-35' (0751-44-2) | EACH | 3 | $20,730 | $14,950 | $11,700 | $19,850 |
| 0865 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.02 | $4,439.00 | $4,895.00 | $4,225.00 | $3,767.50 |
| 0870 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 9 | $2,685.00 | $2,650.00 | $2,550.00 | $2,084.50 |
| 0875 | Conduit, furnish & install, open trench (0630-2-11) | LF | 21,910 | $19.40 | $16.38 | $18.40 | $16.06 |
| 0880 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,715 | $27.00 | $45.38 | $25.70 | $33.22 |
| 0885 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 80 | $44.50 | $44.68 | $42.45 | $50.02 |
| 0890 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 5,841 | $3.50 | $4.47 | $3.30 | $3.80 |
| 0895 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 16,190 | $5.60 | $6.80 | $5.30 | $5.72 |
| 0900 | Fiber optic cable, remove, underground (0633-1620) | LF | 13,190 | $1.90 | $1.94 | $1.77 | $1.65 |
| 0905 | Fiber optic connection, install, splice (0633-2-31) | EACH | 336 | $70.00 | $58.35 | $66.70 | $49.50 |
| 0910 | Fiber optic connection, install, termination (0633-2-32) | EACH | 156 | $90.00 | $97.24 | $85.00 | $82.50 |
| 0915 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 2 | $1,640.00 | $1,588.32 | $1,550.00 | $1,347.50 |
| 0920 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 4 | $97.00 | $64.83 | $91.70 | $55.00 |
| 0925 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 13 | $87.00 | $110.21 | $82.40 | $93.50 |
| 0930 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 37 | $1,694.00 | $1,484.60 | $1,600.00 | $1,259.50 |
| 0935 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 5 | $872.00 | $940.02 | $829.00 | $797.50 |
| 0940 | Fiber optic cable locator (0633-6) | DA | 450 | $207.00 | $175.04 | $197.10 | $165.00 |
| 0945 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 7,766 | $5.50 | $5.12 | $5.20 | $6.32 |
| 0950 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 52 | $1,287.00 | $1,318.53 | $1,220.00 | $1,600.95 |
| 0955 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 51 | $3,504.00 | $2,456.14 | $3,330.00 | $2,609.26 |
| 0960 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 4 | $6,990.00 | $4,316.67 | $6,645.00 | $4,825.15 |
| 0965 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $8,394.00 | $5,892.99 | $7,984.00 | $5,517.33 |
| 0970 | Electrical power service, adjust/modify (0639-1500) | AS | 1 | $2,149.00 | $2,085.83 | $2,043.00 | $880.00 |
| 0975 | Electrical service wire, & install (0639-2-1) | LF | 13,984 | $11.10 | $12.62 | $10.59 | $7.36 |
| 0980 | Electrical service wire, (0639-2-6) | LF | 8,954 | $2.20 | $1.92 | $2.09 | $0.88 |
| 0985 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 8 | $4,688.00 | $1,734.77 | $4,450.00 | $2,806.65 |
| 0990 | Electrical power service- transformer, F&I, 16-25 kva, single phase, copper windings (0639-6141) | EACH | 1 | $8,608.00 | $5,240.49 | $8,480.00 | $6,877.70 |
| 0995 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 9 | $3,191.00 | $1,825.35 | $3,035.00 | $2,439.23 |
| 1000 | Concrete CCTV pole, furnish & install with lowering device, (0641-3163) | EACH | 1 | $47,374 | $22,696 | $45,050 | $46,425 |
| 1005 | Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21) | EACH | 1 | $64,865 | $50,524 | $61,690 | $42,209 |
| 1010 | Vehicle detection system- parking detection system, furnish & install, sensor- camera (0660-12-11) | EACH | 28 | $3,882.00 | $3,113.65 | $3,690.00 | $2,849.12 |
| 1015 | Vehicle detection system- parking detection system, furnish & install, central software (0660-12-14) | EACH | 1 | $47,812 | $45,177 | $45,000 | $38,395 |
| 1020 | ITS cabinet, furnish & install, base mount, 336, 24" W X 36" H X D (0676-2131) | EACH | 1 | $13,565 | $14,257 | $12,900 | $11,181 |
| 1025 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 8 | $14,256 | $18,770 | $13,550 | $13,157 |
| 1030 | Small equipment enclosure, furnish and install, less than 10"W X 13"H X 11" D (0676-3-10) | EACH | 18 | $2,693.00 | $7,053.14 | $2,560.00 | $2,327.71 |
| 1035 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 4 | $7,895.00 | $8,602.86 | $7,509.00 | $7,975.00 |
| 1040 | Media converter, furnish & install (0684-5-1) | EACH | 2 | $1,058.00 | $2,463.52 | $1,006.00 | $984.50 |
| 1045 | Managed hub ethernet switch, furnish & install (0684-7-1) | EACH | 9 | $8,531.00 | $14,911 | $8,110.00 | $7,672.50 |
| 1050 | Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12) | EACH | 9 | $5,296.00 | $7,643.38 | $5,035.00 | $6,125.10 |
| 1055 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 9 | $1,508.00 | $1,069.69 | $1,434.00 | $531.69 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.