Hinson, James D., Electrical Contracting Company, Inc. submitted 13 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 13 NOV 2024, and was the low bidder on 4 of them (31%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $7,378,780
- Latest bid
- 13 NOV 2024
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 0 | 0% |
| 2020 | 3 | 0 | 0% |
| 2022 | 5 | 3 | 60% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 12 | 4 | 33% |
| StateWide | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 11 | 6 (55%) | $0.30 | $0.25 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 9 | 5 (56%) | $972.78 | $1,150.00 |
| Sediment barrier | 0104-10-3 | LF | 7 | 4 (57%) | $2.95 | $2.60 |
| Performance turf, sod | 0570-1-2 | SY | 5 | 4 (80%) | $7.50 | $5.00 |
| Traffic control officer | 0102-14 | HR | 5 | 4 (80%) | $72.56 | $80.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 9 | 2 (22%) | $24.96 | $30.82 |
| Portable changeable message sign, temporary | 0102-99 | ED | 9 | 2 (22%) | $14.00 | $12.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 8 | 2 (25%) | $10.26 | $16.54 |
| Litter removal | 0107-1 | ACRE | 6 | 2 (33%) | $99.00 | $52.98 |
| Mowing | 0107-2 | ACRE | 6 | 2 (33%) | $107.50 | $80.65 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 9 | 1 (11%) | $8.53 | $5.90 |
| Prestressed concrete pole, type P-II service pole | 0641-2-12 | EACH | 6 | 1 (17%) | $1,644.81 | $2,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Chinchor Electric Inc. | 8 | 7 of 8 |
| American Lighting and Signalization, LLC. | 7 | 2 of 7 |
| Traffic Control Devices, Inc. | 7 | 3 of 7 |
| Highway Safety Devices, Inc. | 4 | 1 of 4 |
| Sice Inc | 4 | 2 of 4 |
| Powercore, Inc. | 4 | 2 of 4 |
| Florida Safety Contractors, Inc. | 3 | 1 of 3 |
| Contact Network LLC | 2 | 1 of 2 |
| Conti Corporation | 1 | 1 of 1 |
| Traffic Management Solutions, LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 NOV 2024 | T2A27 | District 2 | SR A1A (AVENIDA MENENDEZ) FROM KING ST TO CASTILLO DR | 1 of 2 | $1,746,198 | Low, 3.0% under the second |
| 14 JUN 2023 | T2925 | District 2 | SR223(ALT US301/TRUCK ROUTE) | 3 of 3 | $4,851,499 | +15% |
| 15 JUN 2022 | T2866 | District 2 | SR 105 | 3 of 4 | $1,837,845 | +3.0% |
| 15 JUN 2022 | T2873 | District 2 | SR 104 (DUNN AVE) | 2 of 4 | $314,214 | +31% |
| 15 JUN 2022 | T2874 | District 2 | D/W SAFETY FLEXIBLE BACKPLATE INSTALL | 1 of 2 | $679,176 | Low, 20% under the second |
| 15 JUN 2022 | T2876 | District 2 | DISTRICTWIDE SAFETY LEFT-TURN LANE OFFSET | 1 of 1 | $4,274,476 | Low |
| 15 JUN 2022 | T2899 | District 2 | SR 222 (NE 39TH AVE) | 1 of 1 | $678,930 | Low |
| 29 APR 2020 | T2762 | District 2 | DISTRICT WIDE SCHOOL ZONE IMPROVEMENTS | 4 of 5 | $2,125,085 | +33% |
| 29 APR 2020 | T2770 | District 2 | SR 24 | 5 of 6 | $899,860 | +50% |
| 29 APR 2020 | T9022 | StateWide | SR 93 (I-75) | 2 of 4 | $1,991,546 | 0.0% |
| 26 SEP 2018 | T2716 | District 2 | SR 16 | 6 of 9 | $5,636,005 | +15% |
| 23 MAY 2018 | T2692 | District 2 | SR 9A (I-295) | 4 of 7 | $15,383,384 | +10% |
| 31 JAN 2018 | T2688 | District 2 | SR 8 (I-10) | 3 of 9 | $1,716,335 | +2.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.