FDOT contract T5860 bid tabulation
SR 9 (I-95) FROM S OF SR 50 TO SR 46. Let by Florida DOT on July 30, 2025, Brevard, District 5. 5 bids received; low bid $29,845,663 by Masci General Contractors, Inc.
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 169
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Masci General Contractors, Inc | $29,845,663 | Low |
| 2 | Preferred Materials Inc. | $32,770,002 | +10% |
| 3 | Ohla USA Inc | $33,679,976 | +13% |
| 4 | Hubbard Construction Company | $36,438,264 | +22% |
| 5 | P & S Paving, Inc. | $37,431,007 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Masci General Contractors, Inc | 2. Preferred Materials Inc. | 3. Ohla USA Inc | 4. Hubbard Construction Company | 5. P & S Paving, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $1,400,659 | $1,501,697 | $3,360,000 | $1,142,263 | $1,948,600 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $400,000 | $1,496,271 | $1,500,000 | $1,315,213 | $1,000,000 |
| 0015 | Traffic control officer (0102-14) | HR | 2,616 | $85.00 | $112.50 | $77.00 | $129.05 | $95.00 |
| 0020 | Work zone sign (0102-60) | ED | 16,200 | $0.22 | $0.19 | $0.21 | $0.21 | $0.20 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 50,850 | $0.10 | $0.09 | $0.09 | $0.10 | $0.10 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 900 | $5.00 | $5.00 | $4.50 | $5.30 | $5.20 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 4,640 | $9.50 | $9.00 | $9.50 | $10.61 | $9.50 |
| 0040 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,250 | $9.18 | $15.41 | $18.50 | $16.27 | $10.00 |
| 0045 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,250 | $9.18 | $1.00 | $18.50 | $1.06 | $10.00 |
| 0050 | Portable regulatory, sign (0102-150-1) | ED | 900 | $5.00 | $3.75 | $4.50 | $4.24 | $4.75 |
| 0055 | Radar speed display unit (0102-150-2) | ED | 900 | $5.00 | $3.75 | $4.50 | $4.24 | $4.75 |
| 0060 | Sediment barrier (0104-10-3) | LF | 51,742 | $1.25 | $2.20 | $1.00 | $0.84 | $1.00 |
| 0065 | Inlet protection system (0104-18) | EACH | 127 | $190.00 | $130.00 | $193.00 | $156.75 | $175.00 |
| 0070 | Litter removal (0107-1) | ACRE | 4,423.11 | $12.50 | $25.00 | $25.00 | $26.94 | $25.00 |
| 0075 | Mowing (0107-2) | ACRE | 3,525.69 | $23.50 | $55.00 | $55.00 | $59.26 | $55.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $203,400 | $218,238 | $360,889 | $494,071 | $275,000 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 2,637 | $20.35 | $45.15 | $25.00 | $47.86 | $36.00 |
| 0090 | Delivery of salvageable to fdot (0110-86) | LS | 1 | $1,200.00 | $21,585 | $50,000 | $41,099 | $12,000 |
| 0095 | Regular excavation (0120-1) | CY | 1,369.10 | $21.45 | $33.54 | $7.00 | $47.86 | $50.00 |
| 0100 | Embankment (0120-6) | CY | 440.90 | $51.24 | $57.34 | $10.50 | $42.54 | $50.00 |
| 0105 | Type B stabilization (0160-4) | SY | 2,138 | $15.99 | $32.61 | $5.00 | $19.14 | $27.00 |
| 0110 | Optional base, base group 01 (0285-701) | SY | 861 | $27.15 | $26.83 | $15.00 | $31.91 | $26.00 |
| 0115 | Optional base, base group 12 (0285-712) | SY | 1,166 | $49.80 | $56.53 | $36.00 | $47.86 | $60.00 |
| 0120 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 7,586 | $2.42 | $3.30 | $10.00 | $9.29 | $9.50 |
| 0125 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 17,471 | $2.28 | $3.53 | $8.00 | $7.47 | $6.70 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 236,788 | $1.50 | $1.77 | $3.50 | $3.56 | $2.45 |
| 0135 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 59,407 | $2.00 | $2.80 | $3.60 | $8.74 | $5.30 |
| 0140 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 4,614 | $3.00 | $4.62 | $20.00 | $4.08 | $3.60 |
| 0145 | Milling existing asphalt pavement, 6 1/2" avg depth (0327-70-14) | SY | 400 | $4.00 | $24.90 | $20.00 | $32.21 | $42.00 |
| 0150 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 329 | $4.00 | $27.01 | $20.00 | $19.95 | $37.00 |
| 0155 | Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17) | SY | 147,934 | $2.00 | $3.16 | $3.50 | $6.50 | $4.65 |
| 0160 | Milling existing asphalt pavement, 5 1/2" avg depth (0327-70-18) | SY | 377 | $5.00 | $26.42 | $30.00 | $12.58 | $41.00 |
| 0165 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 23,157 | $1.85 | $3.20 | $3.50 | $6.56 | $2.90 |
| 0170 | Milling existing asphalt pavement, 7" avg depth (0327-70-21) | SY | 24,861 | $4.25 | $8.02 | $8.00 | $12.25 | $18.00 |
| 0175 | Milling existing asphalt pavement, 4 1/4" avg depth (0327-70-22) | SY | 182,960 | $2.00 | $3.17 | $4.00 | $8.91 | $5.70 |
| 0180 | Milling existing asphalt pavement, 6 3/4" avg depth (0327-70-28) | SY | 587 | $4.00 | $18.31 | $25.00 | $23.45 | $26.00 |
| 0185 | Milling existing asphalt pavement, 6 1/4" avg depth (0327-70-29) | SY | 4,468 | $3.50 | $9.40 | $5.00 | $18.70 | $18.00 |
| 0190 | Milling existing asphalt pavement, 7 1/2" avg depth (0327-70-31) | SY | 800 | $5.00 | $15.41 | $25.00 | $20.52 | $33.00 |
| 0195 | Milling existing asphalt pavement, 8" avg depth (0327-70-34) | SY | 800 | $5.00 | $16.38 | $25.00 | $20.63 | $33.00 |
| 0200 | Milling existing asphalt pavement, 9" avg depth (0327-70-39) | SY | 278 | $7.25 | $35.82 | $30.00 | $44.66 | $48.00 |
| 0205 | Milling exist asphalt pavement and limerock 9.75" (0327-70110) | SY | 667 | $7.25 | $19.66 | $25.00 | $25.69 | $22.00 |
| 0210 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 21,021 | $119.50 | $117.63 | $136.00 | $132.69 | $139.00 |
| 0215 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 8,622.70 | $119.50 | $150.35 | $116.00 | $162.88 | $180.00 |
| 0220 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 1,200.30 | $165.49 | $168.17 | $140.00 | $216.99 | $190.00 |
| 0225 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 4,122.30 | $165.49 | $166.34 | $165.00 | $196.20 | $191.00 |
| 0230 | Superpave asphaltic concrete, traffic E, high polymer (0334-1-59) | TN | 69,752.10 | $189.52 | $193.98 | $165.00 | $190.28 | $209.00 |
| 0235 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 867.60 | $191.25 | $304.70 | $215.00 | $266.41 | $300.00 |
| 0240 | Asphalt concrete friction course, inc bit, FC-5, high polymer (0337-7-26) | TN | 16,909.90 | $193.59 | $236.30 | $205.00 | $232.41 | $260.00 |
| 0245 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 963.40 | $195.59 | $200.84 | $226.00 | $185.16 | $204.00 |
| 0250 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 2,137.30 | $181.00 | $194.62 | $218.00 | $185.58 | $197.00 |
| 0255 | Miscellaneous asphalt (0339-1) | TN | 717.20 | $289.47 | $333.02 | $300.00 | $370.79 | $335.00 |
| 0260 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 16 | $365.15 | $426.69 | $540.00 | $265.90 | $495.00 |
| 0265 | U-endwall with grate, index 261/430-011, 1:6 slope, 18"pipe (0430-612025) | EACH | 1 | $8,730.00 | $10,682 | $3,805.00 | $7,976.91 | $5,900.00 |
| 0270 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 2,691 | $121.50 | $87.94 | $150.00 | $106.36 | $80.00 |
| 0275 | Detectable warnings (0527-2) | SF | 113 | $27.50 | $29.40 | $46.10 | $47.86 | $24.00 |
| 0280 | Guardrail -roadway, general (0536-1-1) | LF | 11,892 | $17.62 | $13.62 | $13.70 | $26.52 | $14.50 |
| 0285 | Rub rail for guardrail, single sided rub rail (0536-5-1) | LF | 11,267 | $15.86 | $11.86 | $15.50 | $20.16 | $16.20 |
| 0290 | Special guardrail post- deep post for slope break timber or steel (0536-7-1) | EACH | 1,776 | $129.07 | $122.07 | $126.00 | $26.52 | $130.00 |
| 0295 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 3 | $1,208.75 | $1,008.75 | $3,100.00 | $3,394.84 | $3,300.00 |
| 0300 | Guardrail removal (0536-73) | LF | 11,854 | $1.00 | $0.55 | $2.85 | $2.12 | $3.00 |
| 0305 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 3 | $1,682.23 | $1,482.23 | $1,705.00 | $2,121.77 | $1,800.00 |
| 0310 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 14 | $3,437.99 | $3,237.99 | $3,200.00 | $3,394.84 | $3,400.00 |
| 0315 | Guardrail reset (0538-1) | LF | 5,033 | $13.49 | $10.49 | $16.60 | $22.28 | $17.50 |
| 0320 | Performance turf, sod (0570-1-2) | SY | 45,086 | $4.00 | $4.01 | $7.40 | $7.66 | $6.00 |
| 0325 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 789 | $8.00 | $6.87 | $21.00 | $14.89 | $12.00 |
| 0330 | Raised pavement marker, type B (0706-1-3) | EACH | 7,858 | $5.00 | $5.25 | $4.70 | $4.75 | $8.00 |
| 0335 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 25.81 | $9,900.00 | $1,675.00 | $4,620.00 | $7,388.70 | $8,000.00 |
| 0340 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 2.06 | $14,000 | $2,250.00 | $5,130.00 | $9,499.76 | $3,400.00 |
| 0345 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.10 | $18,000 | $3,375.00 | $10,300 | $10,555 | $5,200.00 |
| 0350 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 583 | $3.50 | $3.00 | $3.20 | $3.17 | $4.50 |
| 0355 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 2,419 | $5.25 | $2.50 | $5.20 | $5.28 | $3.80 |
| 0360 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 134 | $6.25 | $5.50 | $6.20 | $6.33 | $8.20 |
| 0365 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 44.78 | $3,200.00 | $450.08 | $2,600.00 | $3,166.44 | $2,500.00 |
| 0370 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.04 | $1,200.00 | $909.09 | $935.00 | $959.32 | $1,200.00 |
| 0375 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 40 | $75.00 | $67.00 | $67.00 | $68.61 | $100.00 |
| 0380 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 34 | $19.00 | $5.50 | $16.00 | $15.83 | $8.30 |
| 0385 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 19.74 | $9,900.00 | $1,675.59 | $4,615.00 | $7,387.58 | $8,000.00 |
| 0390 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.01 | $1,200.00 | $16,667 | $1,711.00 | $17,592 | $17,000 |
| 0395 | Work zone collision detection and avoidance system for operations (0924-102) | LS | 1 | $68,768 | $70,000 | $71,600 | $84,871 | $185,000 |
| 0400 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 11 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0405 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 1 | $11,500 | $11,500 | $11,500 | $11,500 | $11,500 |
| 0410 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0415 | Ground-in rumble strips, 16" (0546-72-1) | GM | 35.86 | $1,625.00 | $1,140.16 | $1,165.00 | $1,985.65 | $2,150.00 |
| 0420 | Loop assembly, F&I, type F (0660-2106) | AS | 3 | $2,295.00 | $1,221.00 | $2,170.00 | $1,288.80 | $2,400.00 |
| 0425 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 39 | $610.00 | $575.00 | $560.00 | $610.01 | $600.00 |
| 0430 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 6 | $1,995.00 | $2,300.00 | $1,760.00 | $2,440.04 | $2,450.00 |
| 0435 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $2,299.00 | $3,300.00 | $2,210.00 | $3,500.93 | $3,500.00 |
| 0440 | Single column ground sign assembly, relocate (0700-1500) | EACH | 8 | $455.00 | $500.00 | $345.00 | $530.44 | $525.00 |
| 0445 | Single column ground sign assembly, remove (0700-1600) | EACH | 24 | $50.00 | $35.00 | $46.00 | $37.13 | $37.00 |
| 0450 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 3 | $9,995.00 | $14,000 | $10,015 | $14,852 | $14,600 |
| 0455 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $17,952 | $16,000 | $17,000 | $16,974 | $16,800 |
| 0460 | Multi-column ground sign assembly, F&I ground mount, 1-300.0 SF (0700-2117) | EACH | 2 | $22,997 | $25,000 | $22,300 | $26,522 | $27,000 |
| 0465 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 4 | $6,969.00 | $2,575.00 | $6,780.00 | $2,731.79 | $2,700.00 |
| 0470 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 6 | $1,400.00 | $1,500.00 | $1,225.00 | $1,591.33 | $1,600.00 |
| 0475 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 2 | $1,790.00 | $1,475.00 | $1,625.00 | $1,564.81 | $1,550.00 |
| 0480 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 1 | $1,050.00 | $2,275.00 | $960.00 | $2,413.52 | $2,400.00 |
| 0485 | Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203) | EACH | 2 | $1,997.00 | $2,100.00 | $1,965.00 | $2,227.86 | $2,200.00 |
| 0490 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 2 | $12,500 | $9,800.00 | $12,050 | $10,397 | $10,300 |
| 0495 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $120.00 | $135.00 | $102.50 | $143.22 | $145.00 |
| 0500 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 2 | $390.00 | $135.00 | $360.00 | $143.22 | $142.00 |
| 0505 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 2 | $590.00 | $275.00 | $565.00 | $291.75 | $290.00 |
| 0510 | Sign panel, remove, 201-300 SF (0700-3607) | EACH | 2 | $2,782.00 | $275.00 | $1,890.00 | $291.75 | $290.00 |
| 0515 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 54 | $175.00 | $125.00 | $150.00 | $132.61 | $130.00 |
| 0520 | Object marker, type 2 (0705-10-2) | EACH | 8 | $235.00 | $125.00 | $215.00 | $132.61 | $132.00 |
| 0525 | Delineator, non-flexible (0705-11-2) | EACH | 326 | $105.00 | $125.00 | $100.00 | $132.61 | $133.00 |
| 0530 | Raised pavement marker, type B (0706-1-3) | EACH | 7,189 | $5.00 | $5.25 | $4.75 | $4.75 | $8.00 |
| 0535 | Painted pavement markings, surface (0710-90) | LS | 1 | $145,600 | $124,000 | $165,000 | $142,496 | $190,000 |
| 0540 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.10 | $9,900.00 | $19,072 | $9,050.00 | $9,303.92 | $28,000 |
| 0545 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.10 | $17,000 | $23,300 | $15,400 | $15,833 | $35,000 |
| 0550 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 583 | $4.50 | $5.00 | $4.25 | $4.22 | $7.60 |
| 0555 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,323 | $11.50 | $4.50 | $10.50 | $10.56 | $6.90 |
| 0560 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 134 | $9.00 | $9.00 | $8.50 | $8.44 | $13.50 |
| 0565 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.04 | $2,750.00 | $3,022.73 | $2,335.00 | $2,398.86 | $4,000.00 |
| 0570 | Thermoplastic, standard, arrow (0711-11170) | EACH | 40 | $110.00 | $100.00 | $103.00 | $105.55 | $150.00 |
| 0575 | Thermoplastic, standard, yield line (0711-11180) | LF | 34 | $25.00 | $30.00 | $21.00 | $21.11 | $45.00 |
| 0580 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.01 | $2,750.00 | $16,667 | $4,275.00 | $43,982 | $15,200 |
| 0585 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 513 | $16.50 | $14.00 | $15.50 | $15.83 | $21.00 |
| 0590 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 5 | $330.00 | $1,050.00 | $308.00 | $316.66 | $1,600.00 |
| 0595 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 19.27 | $6,050.00 | $4,452.08 | $5,650.00 | $5,805.11 | $6,700.00 |
| 0600 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 1.50 | $9,900.00 | $6,750.00 | $9,800.00 | $10,028 | $10,500 |
| 0605 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 40.02 | $1,760.00 | $1,430.25 | $1,650.00 | $1,688.72 | $2,200.00 |
| 0610 | Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133) | GM | 0.27 | $3,300.00 | $16,574 | $3,055.00 | $3,143.27 | $25,300 |
| 0615 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 19.28 | $5,700.00 | $4,452.08 | $5,650.00 | $5,805.11 | $6,700.00 |
| 0620 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.99 | $5,200.00 | $4,009.36 | $5,125.00 | $5,272.36 | $6,000.00 |
| 0625 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.52 | $5,200.00 | $4,006.36 | $5,120.00 | $5,265.06 | $6,100.00 |
| 0630 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.21 | $110,000 | $41,000 | $102,600 | $105,553 | $62,000 |
| 0635 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.41 | $3,300.00 | $26,505 | $30,620 | $31,512 | $39,500 |
| 0640 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.21 | $110,000 | $41,000 | $103,000 | $105,553 | $62,000 |
| 0645 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.38 | $3,300.00 | $26,475 | $31,000 | $31,418 | $39,000 |
| 0650 | Conduit, furnish & install, open trench (0630-2-11) | LF | 725 | $17.55 | $20.85 | $21.00 | $22.01 | $18.50 |
| 0655 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 146 | $95.04 | $28.93 | $28.00 | $30.54 | $96.00 |
| 0660 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,728.00 | $2,315.00 | $1,440.00 | $2,443.55 | $1,800.00 |
| 0665 | Lighting conductors, F&I, insulated, no 1 to no 0 (0715-1-14) | LF | 3,021 | $6.16 | $5.21 | $5.00 | $5.50 | $6.50 |
| 0670 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 5 | $1,328.40 | $2,325.00 | $1,500.00 | $2,454.10 | $1,360.00 |
| 0675 | Light pole complete, relocate (0715-68000) | EACH | 5 | $4,042.44 | $7,948.00 | $9,195.00 | $8,389.34 | $4,100.00 |
| 0680 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 5 | $1,297.08 | $972.00 | $1,000.00 | $1,025.97 | $1,370.00 |
| 0685 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 9.72 | $2,701.08 | $4,221.85 | $3,200.00 | $4,456.29 | $2,740.00 |
| 0690 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 3 | $1,836.00 | $1,688.00 | $2,100.00 | $1,781.73 | $1,850.00 |
| 0695 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,068 | $28.08 | $26.44 | $24.00 | $27.91 | $29.00 |
| 0700 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,247 | $68.04 | $32.91 | $30.00 | $34.74 | $69.00 |
| 0705 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 50 | $53.46 | $43.61 | $33.50 | $46.03 | $54.00 |
| 0710 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 2,119 | $4.10 | $4.67 | $5.50 | $4.93 | $4.20 |
| 0715 | Fiber optic connection, install, splice (0633-2-31) | EACH | 36 | $48.60 | $67.00 | $60.00 | $70.72 | $50.00 |
| 0720 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 1 | $1,323.00 | $1,564.00 | $1,565.00 | $1,650.85 | $1,400.00 |
| 0725 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 3 | $54.00 | $61.00 | $65.00 | $64.39 | $55.00 |
| 0730 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 24 | $59.40 | $50.00 | $75.00 | $52.78 | $60.00 |
| 0735 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 1 | $1,182.60 | $1,629.00 | $1,400.00 | $1,719.45 | $1,225.00 |
| 0740 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 2 | $108.00 | $103.00 | $130.00 | $108.72 | $110.00 |
| 0745 | Fiber optic cable locator (0633-6) | DA | 450 | $117.72 | $268.20 | $320.00 | $283.09 | $120.00 |
| 0750 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 19 | $2,339.28 | $1,228.00 | $2,120.00 | $1,296.19 | $2,400.00 |
| 0755 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $3,824.28 | $3,340.00 | $3,200.00 | $3,525.47 | $4,000.00 |
| 0760 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,210.00 | $6,053.00 | $5,915.00 | $6,389.11 | $6,300.00 |
| 0765 | Electrical power service, remove underground (0639-1620) | AS | 1 | $842.40 | $510.00 | $1,280.00 | $538.31 | $855.00 |
| 0770 | Electrical service wire, & install (0639-2-1) | LF | 1,454 | $19.44 | $8.04 | $10.50 | $8.49 | $19.50 |
| 0775 | Electrical service wire, (0639-2-6) | LF | 40 | $33.75 | $2.06 | $1.10 | $2.17 | $35.00 |
| 0780 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $4,207.68 | $4,105.00 | $4,400.00 | $4,332.95 | $4,200.00 |
| 0785 | Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121) | EACH | 1 | $2,694.60 | $2,604.00 | $2,900.00 | $2,748.59 | $2,750.00 |
| 0790 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0795 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $5,257.44 | $2,557.00 | $2,750.00 | $2,698.99 | $2,700.00 |
| 0800 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $673.92 | $309.00 | $800.00 | $326.16 | $690.00 |
| 0805 | ITS cabinet, F&I W/riser, ground mount W/sunshield, 334, 66" H X W X 30" D (0676-2243) | EACH | 2 | $20,148 | $20,273 | $16,400 | $21,399 | $20,600 |
| 0810 | Managed field ethernet switch, layer 3, furnish & install (0684-1-10) | EACH | 1 | $9,477.00 | $10,338 | $11,200 | $10,912 | $9,600.00 |
| 0815 | Device server, furnish & install (0684-2-1) | EACH | 1 | $1,004.40 | $3,600.00 | $1,180.00 | $3,799.89 | $1,030.00 |
| 0820 | Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12) | EACH | 1 | $13,809 | $11,758 | $6,800.00 | $12,411 | $14,500 |
| 0825 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,571.40 | $1,972.00 | $1,065.00 | $2,081.51 | $1,600.00 |
| 0830 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $4,321.08 | $2,755.00 | $3,205.00 | $2,907.98 | $4,300.00 |
| 0835 | Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11) | AS | 2 | $7,506.00 | $14,826 | $15,310 | $15,649 | $7,550.00 |
| 0840 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,311.20 | $2,270.00 | $2,955.00 | $2,396.05 | $2,350.00 |
| 0845 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $2,694.60 | $3,427.00 | $1,021.00 | $3,617.31 | $2,780.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way