| 0005 | Mobilization (0101-1) | LS | 1 | $756,806 | $1,000,000 | $1,185,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $400,000 | $500,000 | $750,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $25,000 | $25,000 | $15,000 |
| 0020 | Traffic control officer (0102-14) | HR | 992 | $100.00 | $125.00 | $125.00 |
| 0025 | Work zone sign (0102-60) | ED | 35,310 | $0.22 | $0.22 | $0.30 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 54,780 | $0.09 | $0.10 | $0.15 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,259 | $0.08 | $0.17 | $0.15 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 660 | $5.00 | $5.25 | $6.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 688 | $10.00 | $10.60 | $15.00 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 4,290 | $13.69 | $26.00 | $20.00 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 4,290 | $13.69 | $14.00 | $20.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 7,892 | $1.50 | $2.00 | $2.00 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 144 | $225.00 | $11.00 | $15.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 77 | $12.00 | $206.00 | $200.00 |
| 0075 | Litter removal (0107-1) | ACRE | 741.17 | $50.00 | $26.50 | $150.00 |
| 0080 | Mowing (0107-2) | ACRE | 741.17 | $85.00 | $80.50 | $175.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $125,000 | $350,000 | $200,000 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 424 | $40.00 | $65.00 | $65.00 |
| 0095 | Regular excavation (0120-1) | CY | 41.90 | $150.00 | $300.00 | $110.00 |
| 0100 | Embankment (0120-6) | CY | 4.60 | $500.00 | $600.00 | $250.00 |
| 0105 | Type B stabilization (0160-4) | SY | 197 | $44.00 | $50.00 | $30.00 |
| 0110 | Optional base, base group 09 (0285-709) | SY | 197 | $65.00 | $65.00 | $110.00 |
| 0115 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 143,668 | $4.00 | $4.30 | $1.50 |
| 0120 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 97,972 | $5.00 | $6.95 | $2.00 |
| 0125 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 11,870.70 | $155.00 | $140.00 | $230.00 |
| 0130 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 19,935.30 | $150.00 | $191.00 | $235.00 |
| 0135 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 1 | $7,000.00 | $9,500.00 | $12,000 |
| 0140 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 3 | $6,000.00 | $7,000.00 | $15,000 |
| 0145 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 1 | $7,200.00 | $9,700.00 | $20,000 |
| 0150 | Inlets, DT bot, type E, partial (0425-1555) | EACH | 2 | $7,000.00 | $8,000.00 | $25,000 |
| 0155 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $2,000.00 | $1,000.00 | $2,500.00 |
| 0160 | Valve boxes, adjust (0425-6) | EACH | 32 | $1,500.00 | $815.00 | $2,250.00 |
| 0165 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 26 | $600.00 | $290.00 | $1,250.00 |
| 0170 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 22 | $700.00 | $325.00 | $1,500.00 |
| 0175 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 4 | $750.00 | $760.00 | $1,900.00 |
| 0180 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 118 | $500.00 | $245.00 | $600.00 |
| 0185 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 8 | $800.00 | $325.00 | $1,500.00 |
| 0190 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 7 | $3,000.00 | $4,000.00 | $12,000 |
| 0195 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 6 | $3,000.00 | $4,200.00 | $15,000 |
| 0200 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 5 | $3,500.00 | $4,900.00 | $15,000 |
| 0205 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 1 | $5,000.00 | $15,200 | $32,000 |
| 0210 | Mitered end section, optional other - ellip/arch, 15" SD (0430-984623) | EACH | 2 | $3,500.00 | $5,050.00 | $12,000 |
| 0215 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $3,500.00 | $4,350.00 | $15,000 |
| 0220 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 4 | $4,500.00 | $8,500.00 | $16,000 |
| 0225 | Concrete curb & gutter, type F (0520-1-10) | LF | 85 | $28.00 | $50.00 | $100.00 |
| 0230 | Concrete traffic separator, special- variable width (0520-70) | SY | 360 | $99.00 | $55.00 | $350.00 |
| 0235 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 198 | $47.25 | $200.00 | $95.00 |
| 0240 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 55 | $57.50 | $300.00 | $125.00 |
| 0245 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 38 | $75.00 | $555.00 | $250.00 |
| 0250 | Detectable warnings (0527-2) | SF | 2,027 | $45.00 | $23.00 | $30.00 |
| 0255 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 0.40 | $5,000.00 | $1,400.00 | $5,000.00 |
| 0260 | Performance turf, sod (0570-1-2) | SY | 25,283 | $4.00 | $3.80 | $6.50 |
| 0265 | Conduit, furnish & install, open trench (0630-2-11) | LF | 65 | $26.16 | $18.25 | $30.00 |
| 0270 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 6 | $2,180.93 | $3,000.00 | $2,500.00 |
| 0275 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 6 | $2,212.10 | $2,700.00 | $2,800.00 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 2,977 | $5.00 | $5.20 | $5.00 |
| 0285 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 14.12 | $1,300.00 | $1,725.00 | $1,500.00 |
| 0290 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.51 | $1,500.00 | $2,300.00 | $1,750.00 |
| 0295 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 10,755 | $1.50 | $1.22 | $1.50 |
| 0300 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 790 | $1.75 | $2.40 | $3.00 |
| 0305 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 9,840 | $2.00 | $2.95 | $4.50 |
| 0310 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 8.67 | $750.00 | $460.00 | $1,000.00 |
| 0315 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.03 | $750.00 | $2,700.00 | $1,600.00 |
| 0320 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.23 | $750.00 | $790.00 | $1,000.00 |
| 0325 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 18 | $85.00 | $88.00 | $100.00 |
| 0330 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 286 | $45.00 | $44.00 | $50.00 |
| 0335 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.56 | $1,300.00 | $1,750.00 | $1,600.00 |
| 0340 | Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202) | GM | 0.11 | $1,500.00 | $2,225.00 | $1,800.00 |
| 0345 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 497 | $1.75 | $2.45 | $2.50 |
| 0350 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.79 | $750.00 | $795.00 | $1,000.00 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $112,064 | $112,064 | $112,064 |
| 0360 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 145 | $390.00 | $463.00 | $707.37 |
| 0365 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 61 | $2,200.00 | $1,775.00 | $3,276.26 |
| 0370 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 24 | $2,500.00 | $1,910.00 | $3,574.10 |
| 0375 | Single column ground sign assembly, remove (0700-1600) | EACH | 57 | $50.00 | $51.50 | $74.46 |
| 0380 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 150 | $275.00 | $240.00 | $274.01 |
| 0385 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 148 | $25.00 | $37.00 | $55.10 |
| 0390 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 6 | $125.00 | $308.00 | $878.63 |
| 0395 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 2 | $125.00 | $525.00 | $1,787.05 |
| 0400 | Overhead static sign shallow foundation removal, span (0700-4621) | EACH | 3 | $27,715 | $35,000 | $29,784 |
| 0405 | Tubular marker, 36" yellow (0704-1-4) | EACH | 21 | $125.00 | $148.00 | $201.04 |
| 0410 | Object marker, type 1 (0705-10-1) | EACH | 13 | $75.00 | $210.00 | $402.09 |
| 0415 | Delineator, flexible tubular (0705-11-1) | EACH | 74 | $125.00 | $100.00 | $96.80 |
| 0420 | Raised pavement marker, type B (0706-1-3) | EACH | 6,332 | $5.00 | $5.20 | $7.45 |
| 0425 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 449 | $2.50 | $5.75 | $7.45 |
| 0430 | Painted pavement markings, surface (0710-90) | LS | 1 | $89,638 | $108,000 | $111,691 |
| 0435 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 10,755 | $5.00 | $2.95 | $5.96 |
| 0440 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 805 | $6.50 | $6.00 | $7.45 |
| 0445 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 3,663 | $7.50 | $8.00 | $8.94 |
| 0450 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.21 | $2,200.00 | $2,725.00 | $5,223.94 |
| 0455 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 29 | $200.00 | $138.00 | $335.07 |
| 0460 | Thermoplastic, standard, arrow (0711-11170) | EACH | 398 | $65.00 | $78.00 | $119.14 |
| 0465 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 376 | $6.50 | $5.75 | $7.45 |
| 0470 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.73 | $2,200.00 | $2,750.00 | $5,203.21 |
| 0475 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 6,176 | $13.00 | $14.20 | $22.34 |
| 0480 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 113 | $200.00 | $220.00 | $297.84 |
| 0485 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 113 | $135.00 | $155.00 | $148.92 |
| 0490 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 3 | $450.00 | $595.00 | $1,787.05 |
| 0495 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 14.15 | $4,800.00 | $4,175.00 | $7,744.98 |
| 0500 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.53 | $5,200.00 | $13,000 | $8,637.42 |
| 0505 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 8.80 | $2,200.00 | $1,450.00 | $4,471.69 |
| 0510 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.03 | $3,200.00 | $9,000.00 | $8,935.16 |
| 0515 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.61 | $4,800.00 | $4,250.00 | $7,745.92 |
| 0520 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.05 | $5,200.00 | $21,500 | $9,928.15 |
| 0525 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.10 | $35,000 | $42,000 | $44,676 |
| 0530 | Permanent tape, white, solid W/contrast, 8" primary line width, for concrete surfaces (0713-103122) | GM | 0.08 | $37,500 | $50,000 | $67,014 |
| 0535 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.10 | $15,000 | $16,800 | $14,892 |
| 0540 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.08 | $35,000 | $42,000 | $44,676 |
| 0545 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.10 | $15,000 | $17,000 | $14,892 |
| 0550 | Green-colored pavement markings, bike lane (0714-10) | SF | 3,884 | $9.50 | $12.00 | $14.89 |
| 0555 | Conduit, furnish & install, open trench (0630-2-11) | LF | 233 | $21.49 | $18.20 | $33.40 |
| 0560 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 662 | $31.45 | $45.00 | $48.88 |
| 0565 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $15,120 | $13,800 | $23,496 |
| 0570 | Signal cable, remove- intersection (0632-7-6) | PI | 8 | $3,450.00 | $1,950.00 | $5,361.15 |
| 0575 | Fiber optic cable locator (0633-6) | DA | 330 | $373.75 | $400.00 | $580.79 |
| 0580 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 9 | $1,875.51 | $1,700.00 | $2,914.46 |
| 0585 | Aluminum signals pole, (0646-1-11) | EACH | 34 | $3,756.86 | $3,125.00 | $5,838.00 |
| 0590 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 2 | $3,296.86 | $2,400.00 | $5,123.18 |
| 0595 | Aluminum signals pole, (0646-1-40) | EACH | 5 | $2,655.77 | $2,750.00 | $4,126.96 |
| 0600 | Aluminum signals pole, remove (0646-1-60) | EACH | 24 | $920.00 | $575.00 | $1,429.64 |
| 0602 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 1 | $2,352.75 | $2,050.00 | $3,656.06 |
| 0603 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 2 | $1,651.25 | $1,750.00 | $2,565.97 |
| 0605 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 26 | $1,224.04 | $1,200.00 | $1,902.11 |
| 0610 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 12 | $1,961.00 | $2,200.00 | $3,047.31 |
| 0615 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 10 | $460.00 | $220.00 | $714.82 |
| 0620 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 30 | $115.00 | $75.00 | $178.71 |
| 0625 | Loop assembly, F&I, type B (0660-2102) | AS | 28 | $1,234.60 | $1,525.00 | $1,918.52 |
| 0630 | Loop assembly, F&I, type F (0660-2106) | AS | 18 | $1,464.60 | $2,050.00 | $2,275.93 |
| 0635 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 3 | $33,486 | $16,000 | $52,035 |
| 0640 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 12 | $9,093.50 | $8,500.00 | $14,131 |
| 0645 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 50 | $17,960 | $490.00 | $558.19 |
| 0650 | Pedestrian detector, adjust/modify on existing pole (0665-1-50) | EACH | 1 | $323.15 | $365.00 | $502.16 |
| 0655 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 10 | $143.75 | $125.00 | $223.38 |
| 0657 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $500.00 | $15,500 | $55.10 |
| 0660 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 4.19 | $6,210.00 | $4,200.00 | $9,650.08 |
| 0665 | Itsfm location documentation- intersection (0611-2-1) | EACH | 13 | $3,105.00 | $2,750.00 | $4,825.04 |