FDOT contract T2A14 bid tabulation

SR 5 (US 1) FROM MOULTRIE CREEK BRIDGE TO N OF SR 207. Let by Florida DOT on January 29, 2025, St Johns, District 2. 3 bids received; low bid $11,151,720 by Halifax Paving, Inc..

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
136
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Halifax Paving, Inc.$11,151,720Low
2P & S Paving, Inc.$11,721,638+5.0%
3Duval Asphalt Products, Inc.$14,881,681+33%
FDOT contract T2A14: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Halifax Paving, Inc.2. P & S Paving, Inc.3. Duval Asphalt Products, Inc.
0005Mobilization (0101-1)LS1$756,806$1,000,000$1,185,000
0010Maintenance of traffic (0102-1)DA1$400,000$500,000$750,000
0015Pedestrian or bicycle special detour (0102-4-1)SY1$25,000$25,000$15,000
0020Traffic control officer (0102-14)HR992$100.00$125.00$125.00
0025Work zone sign (0102-60)ED35,310$0.22$0.22$0.30
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED54,780$0.09$0.10$0.15
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD2,259$0.08$0.17$0.15
0040Arrow board / advance warning arrow panel (0102-76)ED660$5.00$5.25$6.00
0045Portable changeable message sign, temporary (0102-99)ED688$10.00$10.60$15.00
0050Temporary signalization and maintenance, intersection (0102-104)ED4,290$13.69$26.00$20.00
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED4,290$13.69$14.00$20.00
0060Sediment barrier (0104-10-3)LF7,892$1.50$2.00$2.00
0065Floating turbidity barrier (0104-11)LF144$225.00$11.00$15.00
0070Inlet protection system (0104-18)EACH77$12.00$206.00$200.00
0075Litter removal (0107-1)ACRE741.17$50.00$26.50$150.00
0080Mowing (0107-2)ACRE741.17$85.00$80.50$175.00
0085Clearing & grubbing (0110-1-1)ACRE1$125,000$350,000$200,000
0090Removal of existing concrete (0110-4-10)SY424$40.00$65.00$65.00
0095Regular excavation (0120-1)CY41.90$150.00$300.00$110.00
0100Embankment (0120-6)CY4.60$500.00$600.00$250.00
0105Type B stabilization (0160-4)SY197$44.00$50.00$30.00
0110Optional base, base group 09 (0285-709)SY197$65.00$65.00$110.00
0115Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY143,668$4.00$4.30$1.50
0120Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY97,972$5.00$6.95$2.00
0125Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN11,870.70$155.00$140.00$230.00
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN19,935.30$150.00$191.00$235.00
0135Inlets, curb, type 7, <10' (0425-1471)EACH1$7,000.00$9,500.00$12,000
0140Inlets, ditch bottom, type C, partial (0425-1525)EACH3$6,000.00$7,000.00$15,000
0145Inlets, DT bot, type E, <10' (0425-1551)EACH1$7,200.00$9,700.00$20,000
0150Inlets, DT bot, type E, partial (0425-1555)EACH2$7,000.00$8,000.00$25,000
0155Manhole, adjust, utilities (0425-5-1)EACH2$2,000.00$1,000.00$2,500.00
0160Valve boxes, adjust (0425-6)EACH32$1,500.00$815.00$2,250.00
0165Pipe culvert, optional material, round, 15"SD (0430-174115)LF26$600.00$290.00$1,250.00
0170Pipe culvert, optional material, round, 18"SD (0430-174118)LF22$700.00$325.00$1,500.00
0175Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF4$750.00$760.00$1,900.00
0180Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224)LF118$500.00$245.00$600.00
0185Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF8$800.00$325.00$1,500.00
0190Mitered end section, optional round, 15" SD (0430-984123)EACH7$3,000.00$4,000.00$12,000
0195Mitered end section, optional round, 18" SD (0430-984125)EACH6$3,000.00$4,200.00$15,000
0200Mitered end section, optional round, 24" SD (0430-984129)EACH5$3,500.00$4,900.00$15,000
0205Mitered end section , optional round, 36" side drain (0430-984138)EACH1$5,000.00$15,200$32,000
0210Mitered end section, optional other - ellip/arch, 15" SD (0430-984623)EACH2$3,500.00$5,050.00$12,000
0215Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH2$3,500.00$4,350.00$15,000
0220Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629)EACH4$4,500.00$8,500.00$16,000
0225Concrete curb & gutter, type F (0520-1-10)LF85$28.00$50.00$100.00
0230Concrete traffic separator, special- variable width (0520-70)SY360$99.00$55.00$350.00
0235Concrete sidewalk and driveways, 4" thick (0522-1)SY198$47.25$200.00$95.00
0240Concrete sidewalk and driveways, 6" thick (0522-2)SY55$57.50$300.00$125.00
0245Concrete ditch pavt, non reinforced, 3" (0524-1-1)SY38$75.00$555.00$250.00
0250Detectable warnings (0527-2)SF2,027$45.00$23.00$30.00
0255Riprap, rubble, F&I, ditch lining (0530-3-4)TN0.40$5,000.00$1,400.00$5,000.00
0260Performance turf, sod (0570-1-2)SY25,283$4.00$3.80$6.50
0265Conduit, furnish & install, open trench (0630-2-11)LF65$26.16$18.25$30.00
0270Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH6$2,180.93$3,000.00$2,500.00
0275Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH6$2,212.10$2,700.00$2,800.00
0280Raised pavement marker, type B (0706-1-3)EACH2,977$5.00$5.20$5.00
0285Painted pavement markings, standard, white, solid, 6" (0710-11101)GM14.12$1,300.00$1,725.00$1,500.00
0290Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.51$1,500.00$2,300.00$1,750.00
0295Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF10,755$1.50$1.22$1.50
0300Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF790$1.75$2.40$3.00
0305Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF9,840$2.00$2.95$4.50
0310Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM8.67$750.00$460.00$1,000.00
0315Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.03$750.00$2,700.00$1,600.00
0320Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM2.23$750.00$790.00$1,000.00
0325Painted pavement markings, standard, white, message or symbol (0710-11160)EACH18$85.00$88.00$100.00
0330Painted pavement markings, standard, white, arrows (0710-11170)EACH286$45.00$44.00$50.00
0335Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM7.56$1,300.00$1,750.00$1,600.00
0340Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202)GM0.11$1,500.00$2,225.00$1,800.00
0345Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF497$1.75$2.45$2.50
0350Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM1.79$750.00$795.00$1,000.00
0355Initial contingency amount, DO not bid (0999-25)LS1$112,064$112,064$112,064
0360Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH145$390.00$463.00$707.37
0365Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH61$2,200.00$1,775.00$3,276.26
0370Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH24$2,500.00$1,910.00$3,574.10
0375Single column ground sign assembly, remove (0700-1600)EACH57$50.00$51.50$74.46
0380Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH150$275.00$240.00$274.01
0385Sign panel, remove, UP to 12 SF (0700-3601)EACH148$25.00$37.00$55.10
0390Sign panel, remove, 51-100 SF (0700-3605)EACH6$125.00$308.00$878.63
0395Sign panel, remove, 101-200 SF (0700-3606)EACH2$125.00$525.00$1,787.05
0400Overhead static sign shallow foundation removal, span (0700-4621)EACH3$27,715$35,000$29,784
0405Tubular marker, 36" yellow (0704-1-4)EACH21$125.00$148.00$201.04
0410Object marker, type 1 (0705-10-1)EACH13$75.00$210.00$402.09
0415Delineator, flexible tubular (0705-11-1)EACH74$125.00$100.00$96.80
0420Raised pavement marker, type B (0706-1-3)EACH6,332$5.00$5.20$7.45
0425Painted pavement markings, standard, yellow, island nose (0710-11290)SF449$2.50$5.75$7.45
0430Painted pavement markings, surface (0710-90)LS1$89,638$108,000$111,691
0435Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF10,755$5.00$2.95$5.96
0440Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF805$6.50$6.00$7.45
0445Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF3,663$7.50$8.00$8.94
0450Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM2.21$2,200.00$2,725.00$5,223.94
0455Thermoplastic, standard, message or symbol (0711-11160)EACH29$200.00$138.00$335.07
0460Thermoplastic, standard, arrow (0711-11170)EACH398$65.00$78.00$119.14
0465Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF376$6.50$5.75$7.45
0470Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM1.73$2,200.00$2,750.00$5,203.21
0475Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF6,176$13.00$14.20$22.34
0480Thermoplastic, preformed, white, message (0711-14160)EACH113$200.00$220.00$297.84
0485Thermoplastic, preformed, white, arrow (0711-14170)EACH113$135.00$155.00$148.92
0490Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH3$450.00$595.00$1,787.05
0495Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM14.15$4,800.00$4,175.00$7,744.98
0500Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.53$5,200.00$13,000$8,637.42
0505Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM8.80$2,200.00$1,450.00$4,471.69
0510Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.03$3,200.00$9,000.00$8,935.16
0515Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM7.61$4,800.00$4,250.00$7,745.92
0520Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202)GM0.05$5,200.00$21,500$9,928.15
0525Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.10$35,000$42,000$44,676
0530Permanent tape, white, solid W/contrast, 8" primary line width, for concrete surfaces (0713-103122)GM0.08$37,500$50,000$67,014
0535Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.10$15,000$16,800$14,892
0540Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.08$35,000$42,000$44,676
0545Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.10$15,000$17,000$14,892
0550Green-colored pavement markings, bike lane (0714-10)SF3,884$9.50$12.00$14.89
0555Conduit, furnish & install, open trench (0630-2-11)LF233$21.49$18.20$33.40
0560Conduit, furnish & install, directional bore (0630-2-12)LF662$31.45$45.00$48.88
0565Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI8$15,120$13,800$23,496
0570Signal cable, remove- intersection (0632-7-6)PI8$3,450.00$1,950.00$5,361.15
0575Fiber optic cable locator (0633-6)DA330$373.75$400.00$580.79
0580Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$1,875.51$1,700.00$2,914.46
0585Aluminum signals pole, (0646-1-11)EACH34$3,756.86$3,125.00$5,838.00
0590Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH2$3,296.86$2,400.00$5,123.18
0595Aluminum signals pole, (0646-1-40)EACH5$2,655.77$2,750.00$4,126.96
0600Aluminum signals pole, remove (0646-1-60)EACH24$920.00$575.00$1,429.64
0602Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS1$2,352.75$2,050.00$3,656.06
0603Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS2$1,651.25$1,750.00$2,565.97
0605Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS26$1,224.04$1,200.00$1,902.11
0610Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS12$1,961.00$2,200.00$3,047.31
0615Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS10$460.00$220.00$714.82
0620Loop detector inductive, remove- cabinet to remain (0660-1600)EACH30$115.00$75.00$178.71
0625Loop assembly, F&I, type B (0660-2102)AS28$1,234.60$1,525.00$1,918.52
0630Loop assembly, F&I, type F (0660-2106)AS18$1,464.60$2,050.00$2,275.93
0635Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH3$33,486$16,000$52,035
0640Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH12$9,093.50$8,500.00$14,131
0645Pedestrian detector, furnish & install, standard (0665-1-11)EACH50$17,960$490.00$558.19
0650Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH1$323.15$365.00$502.16
0655Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH10$143.75$125.00$223.38
0657Sign panel, remove, UP to 12 SF (0700-3601)EACH1$500.00$15,500$55.10
0660Itsfm subsurface documentation- project length (0611-1-1)MI4.19$6,210.00$4,200.00$9,650.08
0665Itsfm location documentation- intersection (0611-2-1)EACH13$3,105.00$2,750.00$4,825.04
FDOT contract T2A14: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy