FDOT contract T2A82 bid tabulation

SR 24A / SR 226 (SW 16TH AVE) FROM SR 24 (ARCHER RD) TO SR 331 (SE WILLISTON. Let by Florida DOT on October 28, 2026, Alachua, District 2. 5 bids received; low bid $2,916,574 by Whitehurst, V. E. & Sons, Inc..

Owner
Florida DOT
Letting
28 OCT 2026
Pay items
73
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Whitehurst, V. E. & Sons, Inc.$2,916,574Low
2Preferred Materials Inc.$3,221,205+10%
3DB Civil Construction, LLC$3,386,800+16%
4Watson Construction Company, LLC$3,718,137+27%
5Superior Asphalt, Inc.$3,726,001+28%
FDOT contract T2A82: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Whitehurst, V. E. & Sons, Inc.2. Preferred Materials Inc.3. DB Civil Construction, LLC4. Watson Construction Company, LLC5. Superior Asphalt, Inc.
0005Mobilization (0101-1)LS1$228,255$273,903$300,000$435,554$317,350
0010Maintenance of traffic (0102-1)DA1$195,765$146,720$175,000$325,000$251,650
0015Pedestrian or bicycle special detour (0102-4-1)SY1$25,000$4,972.70$12,000$40,500$4,000.00
0020Traffic control officer (0102-14)HR192$125.00$100.00$80.00$108.00$115.00
0025Work zone sign (0102-60)ED13,350$0.23$0.20$0.25$0.30$0.25
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED74,098$0.11$0.10$0.12$0.12$0.15
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD2,454$0.06$0.03$0.20$0.06$0.07
0040Arrow board / advance warning arrow panel (0102-76)ED600$5.40$7.00$6.00$7.00$6.00
0045Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH2,036$4.85$5.50$6.00$6.00$0.10
0050Portable changeable message sign, temporary (0102-99)ED1,312$15.05$12.00$12.00$12.00$12.00
0055Temporary signalization and maintenance, intersection (0102-104)ED1,200$23.65$10.80$13.00$26.00$11.50
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,200$20.45$10.80$13.00$22.00$11.50
0065Removable tape, white, 12" crosswalk (0102-913-24)LF56$26.90$14.00$8.00$35.00$55.00
0070Sediment barrier (0104-10-3)LF1,496$1.75$1.50$1.50$2.50$1.30
0075Inlet protection system (0104-18)EACH72$75.00$75.00$150.00$200.00$130.00
0080Litter removal (0107-1)ACRE65.40$161.25$150.00$60.00$100.00$79.00
0085Mowing (0107-2)ACRE50.94$268.75$150.00$100.00$100.00$137.50
0090Clearing & grubbing (0110-1-1)ACRE1$24,071$18,075$117,000$80,000$4,100.00
0095Removal of existing concrete (0110-4-10)SY589$38.20$35.50$45.00$65.00$50.00
0100Regular excavation (0120-1)CY0.30$5,650.00$8,287.80$200.00$2,000.00$9,250.00
0105Embankment (0120-6)CY56.70$66.25$131.12$60.00$80.00$80.00
0110Type B stabilization (0160-4)SY536$16.15$15.18$30.00$35.00$30.00
0115Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY81,535$2.44$2.44$4.50$3.00$3.85
0120Asphalt concrete friction course,traffic C, FC-12.5, high polymer (0337-7-93)TN8,968.90$170.76$217.83$190.00$198.00$236.00
0125Manhole, adjust (0425-5)EACH4$1,355.00$1,260.00$800.00$100.00$300.00
0130Manhole, adjust, utilities (0425-5-1)EACH21$1,355.00$1,260.00$800.00$100.00$300.00
0135Valve boxes, adjust (0425-6)EACH10$1,355.00$1,260.00$120.00$75.00$175.00
0140Concrete curb & gutter, type F (0520-1-10)LF607$45.70$36.00$50.00$70.00$65.00
0145Concrete sidewalk and driveways, 6" thick (0522-2)SY453$92.00$72.50$140.00$200.00$140.00
0150Detectable warnings (0527-2)SF497$38.20$35.50$35.00$45.00$23.50
0155Performance turf, sod (0570-1-2)SY2,084$2.70$4.00$4.00$5.00$8.00
0160Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.81$1,612.50$1,697.66$700.00$2,000.00$106.00
0165Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM2.72$645.00$459.15$500.00$2,000.00$106.00
0170Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM4.28$1,612.50$1,699.21$700.00$2,000.00$106.00
0175Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0180Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH15$550.00$510.00$650.00$600.00$625.00
0185Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,260.00$2,100.00$1,600.00$1,300.00$1,500.00
0190Single column ground sign assembly, remove (0700-1600)EACH9$53.75$50.00$120.00$75.00$115.00
0195Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH6$70.00$65.00$80.00$75.00$72.50
0200Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111)EACH1$10,750$10,000$11,472$10,000$11,000
0205Tubular marker, 36" white post (0704-1-3)EACH2$135.00$125.00$150.00$250.00$130.50
0210Tubular marker, 36" yellow (0704-1-4)EACH6$135.00$125.00$150.00$250.00$130.50
0215Raised pavement marker, type B (0706-1-3)EACH2,036$4.85$5.50$6.00$6.00$4.75
0220Painted pavement markings, surface (0710-90)LS1$37,625$44,000$36,000$85,627$91,000
0225Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.05$11,920$20,755$15,000$20,000$10,500
0230Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,119$4.50$3.50$6.00$4.00$4.60
0235Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,764$6.20$6.00$9.00$5.00$6.00
0240Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF808$6.80$8.00$11.00$7.00$7.50
0245Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.80$1,637.00$2,782.39$3,000.00$5,000.00$1,900.00
0250Thermoplastic, standard, message or symbol (0711-11160)EACH6$141.10$200.00$240.00$200.00$125.00
0255Thermoplastic, standard, arrow (0711-11170)EACH82$101.60$75.00$140.00$100.00$105.00
0260Thermoplastic, standard, yield line (0711-11180)LF13$11.30$11.00$22.00$25.00$21.00
0265Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF572$5.40$6.00$9.00$5.00$6.00
0270Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.31$1,640.00$2,764.33$3,000.00$5,000.00$1,900.00
0275Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,403$15.80$13.00$16.00$7.00$16.00
0280Thermoplastic, preformed, white, message (0711-14160)EACH37$163.70$220.00$350.00$250.00$210.00
0285Thermoplastic, preformed, white, arrow (0711-14170)EACH37$107.25$160.00$240.00$125.00$105.00
0290Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.81$5,960.00$3,994.49$6,000.00$5,800.00$5,825.00
0295Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.72$1,490.00$1,397.42$3,000.00$5,800.00$1,590.00
0300Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.05$5,960.00$16,667$5,500.00$36,000$9,525.00
0305Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.28$5,960.00$3,998.13$6,000.00$5,800.00$5,825.00
0310Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.42$1,490.00$1,386.79$3,000.00$5,800.00$1,590.00
0315Conduit, furnish & install, open trench (0630-2-11)LF16$33.30$22.18$40.00$36.00$23.50
0320Conduit, furnish & install, directional bore (0630-2-12)LF179$46.85$30.09$48.00$50.00$32.50
0325Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$10,105$10,398$11,000$10,810$11,000
0330Signal cable, remove- intersection (0632-7-6)PI1$1,730.75$1,728.00$1,900.00$1,852.00$1,830.00
0335Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH11$1,850.00$1,312.90$1,400.00$1,978.00$1,390.00
0340Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,612.50$540.00$600.00$1,725.00$570.00
0345Aluminum signals pole, (0646-1-11)EACH1$2,924.00$3,463.52$4,000.00$3,128.00$3,665.00
0350Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS1$1,548.00$889.09$1,000.00$1,656.00$940.00
0355Loop assembly, F&I, type C (0660-2103)AS5$1,770.00$1,570.57$1,800.00$1,892.00$1,665.00
0360Pedestrian detector, furnish & install, accessible (0665-1-12)EACH1$2,107.00$1,636.04$1,900.00$2,254.00$1,730.00
0365Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$4,407.50$6,625.80$7,000.00$4,715.00$7,000.00
FDOT contract T2A82: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy