| 0005 | Mobilization (0101-1) | LS | 1 | $385,051 | $380,000 | $304,244 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $365,000 | $268,000 | $598,829 |
| 0015 | Traffic control officer (0102-14) | HR | 340 | $110.00 | $67.00 | $123.58 |
| 0020 | Work zone sign (0102-60) | ED | 23,796 | $0.25 | $0.20 | $0.21 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 75,560 | $0.10 | $0.10 | $0.08 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,975 | $0.05 | $0.10 | $0.09 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 472 | $5.55 | $4.75 | $4.77 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 452 | $11.10 | $10.00 | $10.11 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 560 | $11.35 | $18.00 | $20.22 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 560 | $14.60 | $1.10 | $34.83 |
| 0055 | Existing ITS maintenance (0102-112) | DA | 180 | $580.00 | $320.00 | $506.70 |
| 0060 | Type III barricade (0102-115) | ED | 532 | $0.40 | $0.35 | $0.34 |
| 0065 | Sediment barrier (0104-10-3) | LF | 2,036 | $1.40 | $7.50 | $9.45 |
| 0070 | Inlet protection system (0104-18) | EACH | 65 | $138.50 | $72.50 | $133.60 |
| 0075 | Litter removal (0107-1) | ACRE | 29 | $66.50 | $69.50 | $317.96 |
| 0080 | Mowing (0107-2) | ACRE | 10.10 | $155.25 | $173.00 | $948.43 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $17,250 | $16,800 | $8,594.73 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,450 | $12,000 | $32,746 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 708 | $57.65 | $38.00 | $83.07 |
| 0100 | Regular excavation (0120-1) | CY | 143.60 | $265.30 | $32.50 | $95.61 |
| 0105 | Embankment (0120-6) | CY | 175.80 | $75.15 | $49.00 | $100.37 |
| 0110 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,876 | $7.25 | $15.00 | $15.76 |
| 0115 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 54,936 | $3.75 | $6.30 | $7.60 |
| 0120 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 7,553.70 | $139.50 | $121.50 | $153.03 |
| 0125 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,830.90 | $170.00 | $173.75 | $199.04 |
| 0130 | Concrete class II, culverts (0400-2-1) | CY | 2 | $4,800.00 | $2,700.00 | $2,342.49 |
| 0135 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $10,150 | $9,400.00 | $15,952 |
| 0140 | Manhole, adjust (0425-5) | EACH | 1 | $1,420.00 | $3,150.00 | $307.94 |
| 0145 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 40 | $331.50 | $245.00 | $441.01 |
| 0150 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4 | $305.00 | $725.00 | $3,785.75 |
| 0155 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 8 | $285.00 | $400.00 | $1,662.03 |
| 0160 | Straight concrete endwalls, single, 30 degrees, elliptical (0430-524122) | EACH | 1 | $11,000 | $8,200.00 | $10,360 |
| 0165 | Concrete curb & gutter, type E (0520-1-7) | LF | 291 | $61.25 | $44.00 | $77.01 |
| 0170 | Concrete curb & gutter, type F (0520-1-10) | LF | 307 | $68.75 | $108.75 | $73.59 |
| 0175 | Concrete curb, type D (0520-2-4) | LF | 47 | $94.00 | $73.00 | $57.22 |
| 0180 | Concrete traffic separator, special- variable width (0520-70) | SY | 173 | $288.00 | $158.00 | $134.87 |
| 0185 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 395 | $108.00 | $65.00 | $116.80 |
| 0190 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 437 | $160.50 | $115.50 | $132.45 |
| 0195 | Detectable warnings (0527-2) | SF | 265 | $25.00 | $52.25 | $24.72 |
| 0200 | Performance turf, sod (0570-1-2) | SY | 330 | $7.85 | $40.00 | $20.42 |
| 0205 | Raised pavement marker, type B (0706-1-3) | EACH | 3,478 | $4.60 | $6.75 | $5.01 |
| 0210 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 3.94 | $2,185.00 | $7,700.00 | $2,378.53 |
| 0215 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.03 | $2,915.00 | $3,850.00 | $3,172.20 |
| 0220 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,220 | $2.00 | $3.75 | $2.19 |
| 0225 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 113 | $2.15 | $3.50 | $2.32 |
| 0230 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 359 | $2.25 | $5.65 | $2.44 |
| 0235 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 3.21 | $575.25 | $4,350.00 | $625.93 |
| 0240 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.26 | $805.00 | $4,900.00 | $876.30 |
| 0245 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 41 | $46.00 | $95.00 | $50.07 |
| 0250 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 99 | $46.00 | $62.00 | $50.07 |
| 0255 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.21 | $2,185.00 | $7,700.00 | $2,378.53 |
| 0260 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 192 | $2.15 | $3.50 | $2.32 |
| 0265 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 2.06 | $575.25 | $4,300.00 | $625.93 |
| 0270 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.07 | $805.25 | $4,725.00 | $876.30 |
| 0275 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 |
| 0280 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 25 | $650.00 | $726.00 | $646.01 |
| 0285 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $800.00 | $2,400.00 | $803.30 |
| 0290 | Single column ground sign assembly, remove (0700-1600) | EACH | 8 | $55.00 | $120.00 | $50.56 |
| 0295 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 103 | $365.00 | $371.00 | $365.14 |
| 0300 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 8 | $1,050.00 | $1,150.00 | $1,044.85 |
| 0305 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 10 | $450.00 | $95.00 | $449.40 |
| 0310 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 113 | $65.00 | $130.00 | $61.79 |
| 0315 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 8 | $85.00 | $340.00 | $84.26 |
| 0320 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 1 | $115.00 | $200.00 | $112.35 |
| 0325 | Tubular marker, 36" white post (0704-1-3) | EACH | 1 | $75.00 | $250.00 | $73.03 |
| 0330 | Tubular marker, 36" yellow (0704-1-4) | EACH | 3 | $75.00 | $250.00 | $73.03 |
| 0335 | Object marker, type 1 (0705-10-1) | EACH | 2 | $170.00 | $350.00 | $168.52 |
| 0340 | Raised pavement marker, type B (0706-1-3) | EACH | 1,244 | $4.60 | $6.75 | $5.01 |
| 0345 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 74 | $4.60 | $5.50 | $5.01 |
| 0350 | Painted pavement markings, surface (0710-90) | LS | 1 | $60,000 | $40,000 | $61,072 |
| 0355 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,480 | $3.85 | $9.00 | $4.19 |
| 0360 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 109 | $5.75 | $9.00 | $6.28 |
| 0365 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 709 | $7.70 | $10.00 | $8.39 |
| 0370 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.27 | $2,875.00 | $4,500.00 | $3,129.64 |
| 0375 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 41 | $225.00 | $312.00 | $241.61 |
| 0380 | Thermoplastic, standard, arrow (0711-11170) | EACH | 99 | $80.00 | $160.00 | $86.38 |
| 0385 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 232 | $5.25 | $9.00 | $5.71 |
| 0390 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.08 | $2,875.00 | $4,300.00 | $3,129.64 |
| 0395 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,082 | $18.00 | $16.00 | $19.53 |
| 0400 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.21 | $5,885.00 | $8,200.00 | $6,405.75 |
| 0405 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.03 | $7,850.00 | $8,600.00 | $8,541.41 |
| 0410 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.44 | $1,475.00 | $3,300.00 | $1,602.38 |
| 0415 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.04 | $2,950.00 | $9,100.00 | $3,204.75 |
| 0420 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.64 | $5,400.00 | $8,200.00 | $5,886.23 |
| 0425 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.56 | $1,350.00 | $3,300.00 | $1,472.18 |
| 0430 | Conduit, furnish & install, open trench (0630-2-11) | LF | 29 | $55.50 | $40.00 | $13.48 |
| 0435 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $2,630.00 | $3,000.00 | $1,450.43 |
| 0440 | Light pole complete, relocate (0715-68000) | EACH | 2 | $9,925.00 | $11,000 | $4,133.33 |
| 0445 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.24 | $4,315.00 | $5,700.00 | $3,785.05 |
| 0450 | Itsfm location documentation- intersection (0611-2-1) | EACH | 4 | $3,565.00 | $2,300.00 | $3,130.05 |
| 0455 | Conduit, furnish & install, open trench (0630-2-11) | LF | 322 | $55.00 | $27.00 | $26.96 |
| 0460 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 899 | $51.50 | $43.50 | $47.19 |
| 0465 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 20 | $67.15 | $63.50 | $41.57 |
| 0470 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $4,500.00 | $11,000 | $8,572.26 |
| 0475 | Telephone cable, furnish & install (0633-4-11) | LF | 176 | $9.70 | $13.25 | $6.74 |
| 0480 | Fiber optic cable locator (0633-6) | DA | 180 | $365.00 | $363.00 | $317.95 |
| 0485 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,715.00 | $1,700.00 | $1,450.43 |
| 0490 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 27 | $2,002.00 | $2,700.00 | $1,472.90 |
| 0495 | Junction box, furnish & install, aerial (0635-3-11) | EACH | 1 | $1,065.00 | $835.00 | $1,795.34 |
| 0500 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 1 | $3,280.00 | $9,600.00 | $7,218.45 |
| 0505 | Electrical service wire, & install (0639-2-1) | LF | 177 | $10.25 | $11.00 | $5.62 |
| 0510 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $14,000 | $3,400.00 | $1,669.51 |
| 0515 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,200.00 | $8,500.00 | $3,330.04 |
| 0520 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $2,995.00 | $3,700.00 | $3,225.55 |
| 0525 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $760.00 | $420.00 | $760.61 |
| 0530 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $153,800 | $231,000 | $182,105 |
| 0535 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $3,105.00 | $3,800.00 | $2,919.96 |
| 0540 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $380.00 | $280.00 | $395.47 |
| 0545 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 1 | $1,130.00 | $990.00 | $1,349.32 |
| 0550 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 7 | $840.50 | $880.00 | $847.11 |
| 0555 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $920.00 | $1,200.00 | $921.26 |
| 0560 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $1,720.00 | $2,400.00 | $1,922.30 |
| 0565 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 1 | $94.75 | $280.00 | $106.73 |
| 0570 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 4 | $2,050.00 | $3,125.00 | $2,167.22 |
| 0575 | Loop assembly, F&I, type B (0660-2102) | AS | 8 | $2,175.00 | $1,850.00 | $1,578.51 |
| 0580 | Loop assembly, F&I, type F (0660-2106) | AS | 7 | $2,600.00 | $1,650.00 | $1,390.89 |
| 0585 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 7 | $780.00 | $715.00 | $707.80 |
| 0590 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 2 | $94.75 | $69.00 | $106.73 |
| 0595 | Traffic controller assembly, F&I, NEMA W/standard lock, W/concrete riser, 1 preemption (0670-5166) | AS | 1 | $32,150 | $42,050 | $31,622 |
| 0600 | Traffic controller, modify (0671-2-40) | EACH | 3 | $2,365.00 | $2,700.00 | $1,063.95 |
| 0605 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 2 | $1,135.00 | $2,800.00 | $1,596.48 |
| 0610 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 2 | $10,000 | $11,900 | $10,382 |
| 0615 | Cellular modem, furnish and install (0684-8-1) | EACH | 2 | $7,235.00 | $6,200.00 | $6,347.74 |
| 0620 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $12,850 | $17,000 | $10,770 |
| 0625 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 2 | $5,825.00 | $4,900.00 | $5,147.85 |