FDOT contract T7591 bid tabulation
SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD. Let by Florida DOT on October 28, 2026, Hillsborough, District 7. 5 bids received; low bid $16,764,997 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 155
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $16,764,997 | Low |
| 2 | Hubbard Construction Company | $17,236,206 | +3.0% |
| 3 | Ajax Paving Industries of Florida LLC | $18,525,449 | +11% |
| 4 | C.W. Roberts Contracting, Inc. | $18,766,201 | +12% |
| 5 | Superior Asphalt, Inc. | $19,913,001 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Hubbard Construction Company | 3. Ajax Paving Industries of Florida LLC | 4. C.W. Roberts Contracting, Inc. | 5. Superior Asphalt, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $963,965 | $975,259 | $1,265,000 | $1,870,000 | $1,780,440 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $887,786 | $683,130 | $500,000 | $1,402,000 | $766,660 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,000 | $64,289 | $45,000 | $38,500 | $43,125 |
| 0020 | Pedestrian escort/flagger (0102-5) | HR | 840 | $27.49 | $38.45 | $25.00 | $36.25 | $35.00 |
| 0025 | Traffic control officer (0102-14) | HR | 1,152 | $82.89 | $82.04 | $109.48 | $85.00 | $135.00 |
| 0030 | Work zone sign (0102-60) | ED | 28,900 | $0.22 | $0.21 | $0.24 | $0.23 | $0.24 |
| 0035 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 696 | $37.30 | $39.98 | $45.87 | $39.50 | $55.57 |
| 0040 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 732 | $15.54 | $16.66 | $19.11 | $16.05 | $48.50 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 24,725 | $0.12 | $0.10 | $0.05 | $0.15 | $0.14 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,409 | $0.05 | $0.08 | $1.00 | $0.10 | $0.06 |
| 0055 | Temporary crash cushion, redirective option (0102-89-1) | LO | 4 | $932.55 | $999.48 | $1,146.90 | $3,200.00 | $1,019.02 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 684 | $12.43 | $10.58 | $10.43 | $13.50 | $13.59 |
| 0065 | Type III barricade (0102-115) | ED | 4,800 | $0.36 | $0.33 | $0.10 | $0.40 | $0.39 |
| 0070 | Sediment barrier (0104-10-3) | LF | 18,441 | $2.07 | $1.09 | $2.76 | $0.02 | $1.98 |
| 0075 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 21 | $5.18 | $9.30 | $52.13 | $5.59 | $5.94 |
| 0080 | Soil tracking prevention device (0104-15) | EACH | 2 | $1,000.00 | $3,828.57 | $7,356.00 | $2,000.00 | $2,000.00 |
| 0085 | Inlet protection system (0104-18) | EACH | 35 | $310.85 | $147.92 | $234.59 | $133.00 | $141.53 |
| 0090 | Litter removal (0107-1) | ACRE | 182.80 | $141.71 | $38.29 | $142.59 | $150.00 | $113.22 |
| 0095 | Mowing (0107-2) | ACRE | 91.40 | $170.05 | $191.43 | $171.11 | $180.00 | $141.53 |
| 0100 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $5,771.38 | $44,989 | $125,000 | $91,940 | $45,000 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $264,055 | $283,006 | $273,927 | $616,625 | $150,000 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 1,518 | $36.00 | $38.58 | $36.49 | $46.50 | $40.00 |
| 0115 | Delivery of salvageable to fdot (0110-86) | LS | 1 | $8,289.36 | $4,597.61 | $2,606.59 | $6,000.00 | $5,000.00 |
| 0120 | Regular excavation (0120-1) | CY | 550 | $34.75 | $37.25 | $36.49 | $60.00 | $45.00 |
| 0125 | Embankment (0120-6) | CY | 250 | $47.21 | $50.60 | $52.13 | $90.00 | $40.00 |
| 0130 | Optional base, base group 15 (0285-715) | SY | 277 | $132.68 | $105.65 | $124.91 | $150.00 | $124.35 |
| 0135 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 45.20 | $374.76 | $409.40 | $1,157.22 | $750.00 | $644.87 |
| 0140 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 217,605 | $2.75 | $3.00 | $4.63 | $2.75 | $3.05 |
| 0145 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 78,063 | $2.71 | $5.24 | $4.60 | $3.15 | $4.41 |
| 0150 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 3,118.60 | $149.51 | $172.77 | $216.05 | $180.00 | $200.33 |
| 0155 | Superpave asphaltic concrete, traffic E, high polymer (0334-1-59) | TN | 14,836.70 | $200.52 | $184.41 | $206.67 | $190.00 | $225.01 |
| 0160 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 4,373.20 | $168.25 | $199.74 | $223.12 | $220.00 | $229.48 |
| 0165 | Asphalt concrete friction course,traffic E, FC-12.5, high polymer (0337-7-95) | TN | 20,075.30 | $189.44 | $182.97 | $198.25 | $180.00 | $218.82 |
| 0170 | Miscellaneous asphalt (0339-1) | TN | 232.30 | $289.47 | $359.24 | $794.45 | $320.00 | $671.93 |
| 0175 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 96 | $1,509.25 | $1,115.08 | $1,621.38 | $1,580.00 | $1,600.00 |
| 0180 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $6,098.47 | $6,536.15 | $6,712.05 | $7,100.00 | $10,000 |
| 0185 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 6 | $6,973.20 | $7,473.66 | $6,777.13 | $4,800.00 | $6,500.00 |
| 0190 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $10,656 | $11,421 | $8,080.43 | $5,900.00 | $7,500.00 |
| 0195 | Inlets, closed flume (0425-1910) | EACH | 3 | $5,384.46 | $5,770.90 | $7,205.32 | $6,700.00 | $7,500.00 |
| 0200 | Manhole, adjust (0425-5) | EACH | 14 | $1,259.31 | $1,349.69 | $219.72 | $995.00 | $1,500.00 |
| 0205 | Valve boxes, adjust (0425-6) | EACH | 10 | $743.93 | $797.32 | $136.05 | $815.00 | $1,000.00 |
| 0210 | Replace grate (0425-82) | EACH | 2 | $2,206.98 | $2,365.37 | $1,830.42 | $2,400.00 | $3,500.00 |
| 0215 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 309 | $238.23 | $255.32 | $221.52 | $150.75 | $145.00 |
| 0220 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 38 | $400.94 | $429.71 | $241.89 | $510.00 | $225.00 |
| 0225 | Pipe culvert, optional material, round, 30"SD (0430-174130) | LF | 42 | $557.78 | $597.81 | $372.22 | $750.00 | $400.00 |
| 0230 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 10 | $465.54 | $498.95 | $320.09 | $210.00 | $350.00 |
| 0235 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 312 | $282.96 | $303.26 | $236.91 | $146.00 | $214.00 |
| 0240 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 9 | $696.10 | $746.06 | $372.22 | $685.00 | $400.00 |
| 0245 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 59 | $323.57 | $346.80 | $294.02 | $192.00 | $350.00 |
| 0250 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 1 | $8,637.86 | $9,257.79 | $6,777.13 | $7,750.00 | $7,500.00 |
| 0255 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 1 | $10,029 | $10,748 | $7,501.93 | $9,000.00 | $6,500.00 |
| 0260 | Mitered end section, optional - elliptical / arch, 18" CD (0430-982625) | EACH | 2 | $3,635.89 | $3,896.83 | $5,156.00 | $4,000.00 | $3,000.00 |
| 0265 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 9 | $3,114.32 | $3,337.83 | $4,634.69 | $3,500.00 | $2,500.00 |
| 0270 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 116 | $3,330.44 | $3,569.47 | $4,843.21 | $3,800.00 | $2,500.00 |
| 0275 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 32 | $4,550.49 | $4,877.07 | $5,573.06 | $4,200.00 | $3,000.00 |
| 0280 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 9 | $9,699.84 | $10,396 | $9,827.60 | $9,000.00 | $6,500.00 |
| 0285 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $2,763.63 | $2,961.97 | $6,198.64 | $4,000.00 | $3,000.00 |
| 0290 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 3 | $5,666.15 | $6,072.80 | $7,241.28 | $5,500.00 | $6,200.00 |
| 0295 | Mitered end sect, optional /ellip/arch, 30" SD (0430-984633) | EACH | 1 | $8,020.85 | $8,596.49 | $7,501.93 | $6,700.00 | $6,500.00 |
| 0300 | Pipe liner, sliplining, 30" (0431-1530) | LF | 81 | $490.58 | $503.18 | $364.92 | $490.00 | $602.85 |
| 0305 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 498 | $77.98 | $83.58 | $79.75 | $80.00 | $85.62 |
| 0310 | Concrete curb & gutter, type E (0520-1-7) | LF | 503 | $44.50 | $47.70 | $47.27 | $45.00 | $45.00 |
| 0315 | Concrete curb & gutter, type F (0520-1-10) | LF | 83 | $57.49 | $61.61 | $62.56 | $60.00 | $45.00 |
| 0320 | Shoulder concrete barrier, 56" pier protection barrier/crash wall (0521-72-56) | LF | 525 | $563.68 | $825.13 | $582.13 | $725.00 | $1,250.00 |
| 0325 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,648 | $79.75 | $85.48 | $65.69 | $80.00 | $77.00 |
| 0330 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,047 | $113.44 | $121.58 | $84.45 | $100.00 | $96.00 |
| 0335 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 22 | $185.54 | $198.85 | $84.45 | $200.00 | $190.00 |
| 0340 | Detectable warnings (0527-2) | SF | 1,680 | $34.12 | $32.07 | $21.90 | $27.95 | $45.00 |
| 0345 | Guardrail -roadway, general (0536-1-1) | LF | 4,515 | $27.98 | $25.00 | $23.47 | $29.00 | $25.49 |
| 0350 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 1 | $4,997.44 | $4,029.95 | $3,783.56 | $3,000.00 | $4,108.73 |
| 0355 | Guardrail removal (0536-73) | LF | 2,736 | $2.07 | $2.22 | $2.09 | $3.40 | $2.27 |
| 0360 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 3 | $1,865.11 | $1,402.07 | $1,316.35 | $1,575.00 | $1,429.48 |
| 0365 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 33 | $3,315.74 | $3,623.84 | $3,402.28 | $3,075.00 | $3,694.68 |
| 0370 | Guardrail end treatment- type CRT (0536-85-26) | EACH | 3 | $3,730.21 | $3,365.36 | $3,159.60 | $1,890.00 | $3,431.15 |
| 0375 | Crash cushion, TL-3, narrow (0544-3-1) | EACH | 2 | $25,904 | $32,150 | $35,519 | $39,000 | $32,778 |
| 0380 | Performance turf, sod (0570-1-2) | SY | 6,405 | $6.95 | $6.31 | $5.18 | $9.40 | $8.43 |
| 0385 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 34,681 | $8.26 | $7.58 | $6.48 | $7.00 | $10.68 |
| 0390 | Conduit, furnish & install, open trench (0630-2-11) | LF | 725 | $31.29 | $36.89 | $22.10 | $32.00 | $37.62 |
| 0395 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $1,373.03 | $1,680.24 | $1,485.76 | $1,375.00 | $1,713.09 |
| 0400 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 16 | $1,849.46 | $2,887.23 | $4,074.62 | $1,875.00 | $2,943.67 |
| 0405 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 16 | $1,041.97 | $2,096.14 | $2,892.27 | $1,050.00 | $2,137.12 |
| 0410 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 5 | $7,798.52 | $7,096.51 | $7,178.55 | $8,050.00 | $7,235.23 |
| 0415 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 55.24 | $1,410.12 | $1,503.69 | $700.00 | $1,475.00 | $1,540.98 |
| 0420 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.12 | $2,279.58 | $2,430.83 | $1,199.19 | $1,575.00 | $2,490.94 |
| 0425 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 16,064 | $0.93 | $0.99 | $0.47 | $1.05 | $1.01 |
| 0430 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,038 | $1.04 | $1.10 | $0.52 | $1.30 | $1.14 |
| 0435 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 15,202 | $1.14 | $1.22 | $0.57 | $1.60 | $1.25 |
| 0440 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 5.07 | $621.70 | $662.95 | $312.83 | $745.00 | $679.34 |
| 0445 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 12 | $36.27 | $38.67 | $18.25 | $74.00 | $39.62 |
| 0450 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 486 | $36.27 | $38.67 | $18.25 | $37.00 | $39.62 |
| 0455 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 53.19 | $1,410.23 | $1,503.80 | $709.61 | $32.00 | $1,540.98 |
| 0460 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 3,394 | $1.04 | $1.10 | $0.52 | $1.30 | $1.14 |
| 0465 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.81 | $621.02 | $662.22 | $312.83 | $745.00 | $679.34 |
| 0470 | Mcsaw vehicle detection and indentification - furnish and install, weigh in motion unit (0770-2-12) | AS | 2 | $43,037 | $106,607 | $20,853 | $44,500 | $108,691 |
| 0475 | Mcsaw vehicle detection and indentification - furnish and install, inductive loop (0770-2-13) | EACH | 2 | $3,855.79 | $17,880 | $16,682 | $3,985.00 | $18,229 |
| 0480 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0485 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 24.42 | $5,256.03 | $5,157.90 | $5,550.95 | $3,900.00 | $5,961.79 |
| 0490 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 40 | $673.51 | $718.20 | $677.71 | $560.00 | $735.96 |
| 0495 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,072.34 | $2,209.85 | $2,085.27 | $2,700.00 | $2,264.49 |
| 0500 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 5 | $3,108.51 | $3,314.78 | $3,127.91 | $3,100.00 | $3,396.73 |
| 0505 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $10.36 | $138.12 | $130.33 | $26.00 | $141.53 |
| 0510 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 324 | $243.50 | $11.05 | $10.43 | $355.00 | $11.33 |
| 0515 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 323 | $10.36 | $259.66 | $245.02 | $10.69 | $266.07 |
| 0520 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 1 | $129.52 | $11.05 | $10.43 | $130.00 | $11.33 |
| 0525 | Object marker, type 1 (0705-10-1) | EACH | 76 | $155.43 | $165.74 | $156.40 | $315.00 | $169.84 |
| 0530 | Object marker, type 2 (0705-10-2) | EACH | 615 | $124.34 | $132.59 | $125.12 | $130.00 | $135.86 |
| 0535 | Object marker, type 3 (0705-10-3) | EACH | 16 | $155.43 | $165.74 | $156.40 | $315.00 | $169.84 |
| 0540 | Delineator, flexible tubular (0705-11-1) | EACH | 6 | $108.80 | $116.02 | $109.48 | $105.00 | $118.88 |
| 0545 | Raised pavement marker, type B (0706-1-3) | EACH | 4,965 | $4.14 | $4.42 | $4.17 | $4.25 | $4.53 |
| 0550 | Painted pavement markings, surface (0710-90) | LS | 1 | $110,037 | $117,339 | $164,483 | $100,000 | $189,023 |
| 0555 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 519 | $4.51 | $4.81 | $4.54 | $5.30 | $4.92 |
| 0560 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,840 | $6.01 | $6.41 | $6.05 | $6.40 | $6.57 |
| 0565 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.54 | $1,705.27 | $1,818.43 | $1,719.31 | $3,190.00 | $1,867.06 |
| 0570 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 6 | $101.55 | $108.28 | $102.18 | $315.00 | $110.96 |
| 0575 | Thermoplastic, standard, arrow (0711-11170) | EACH | 243 | $51.81 | $55.25 | $52.13 | $85.00 | $56.62 |
| 0580 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,697 | $4.02 | $4.29 | $4.05 | $5.30 | $4.39 |
| 0585 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.91 | $1,697.33 | $1,809.96 | $1,719.31 | $3,100.00 | $1,867.06 |
| 0590 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 8,032 | $7.64 | $8.14 | $7.68 | $8.50 | $8.34 |
| 0595 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 5,761 | $15.27 | $16.29 | $15.37 | $14.80 | $16.69 |
| 0600 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 27.62 | $4,551.56 | $4,853.58 | $4,580.30 | $5,325.00 | $4,973.94 |
| 0605 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.06 | $6,069.83 | $6,472.67 | $6,107.76 | $5,850.00 | $6,632.68 |
| 0610 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 26.60 | $4,143.90 | $4,418.87 | $4,170.54 | $5,350.00 | $4,528.97 |
| 0615 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.61 | $1,036.16 | $1,104.92 | $1,042.64 | $3,200.00 | $1,132.24 |
| 0620 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,600 | $13.16 | $12.77 | $5.00 | $16.45 | $13.02 |
| 0625 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,600 | $3.73 | $12.77 | $3.70 | $1.00 | $13.02 |
| 0630 | Existing ITS maintenance (0102-112) | DA | 300 | $181.54 | $287.35 | $185.59 | $185.00 | $292.97 |
| 0635 | Valve boxes, adjust (0425-6) | EACH | 2 | $743.93 | $1,847.70 | $136.05 | $975.00 | $1,132.24 |
| 0640 | Itsfm location documentation- intersection (0611-2-1) | EACH | 2 | $3,104.47 | $2,873.51 | $3,707.61 | $3,100.00 | $2,929.68 |
| 0645 | Conduit, furnish & install, open trench (0630-2-11) | LF | 517 | $21.97 | $26.23 | $31.49 | $22.60 | $26.74 |
| 0650 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,457 | $31.19 | $32.28 | $49.11 | $32.00 | $32.92 |
| 0655 | Conduit, furnish & install, open trench under pavement (0630-2-17) | LF | 290 | $25.90 | $29.96 | $38.94 | $26.50 | $30.55 |
| 0660 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $9,900.70 | $8,515.08 | $10,178 | $10,150 | $8,681.54 |
| 0665 | Signal cable, remove- intersection (0632-7-6) | PI | 8 | $762.62 | $1,021.69 | $744.44 | $780.00 | $1,041.67 |
| 0670 | Fiber optic cable locator (0633-6) | DA | 300 | $104.34 | $159.64 | $137.63 | $105.00 | $162.76 |
| 0675 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 67 | $1,377.48 | $1,552.53 | $1,620.26 | $1,410.00 | $1,582.87 |
| 0680 | Aluminum signals pole, (0646-1-11) | EACH | 67 | $2,162.28 | $4,035.52 | $2,377.21 | $2,225.00 | $4,114.41 |
| 0685 | Aluminum signals pole, remove (0646-1-60) | EACH | 36 | $571.97 | $510.85 | $1,009.27 | $590.00 | $520.83 |
| 0690 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 75 | $499.43 | $712.60 | $575.53 | $510.00 | $726.53 |
| 0695 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 67 | $771.01 | $958.43 | $964.44 | $780.00 | $977.17 |
| 0700 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 8 | $29,445 | $29,697 | $31,794 | $30,000 | $30,278 |
| 0705 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 14 | $10,247 | $5,702.76 | $11,318 | $10,500 | $5,814.23 |
| 0710 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 67 | $1,856.50 | $418.04 | $2,262.52 | $1,900.00 | $426.21 |
| 0715 | Traffic controller, modify (0671-2-40) | EACH | 8 | $5,499.47 | $1,532.54 | $494.21 | $5,600.00 | $1,562.49 |
| 0720 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 2 | $13,620 | $9,827.39 | $5,471.75 | $14,000 | $10,020 |
| 0725 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 5 | $5,451.29 | $4,660.83 | $7,204.61 | $5,600.00 | $4,751.94 |
| 0730 | Internally illuminated sign, remove (0700-5-60) | EACH | 5 | $190.66 | $319.28 | $936.29 | $195.00 | $325.52 |
| 0735 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 14 | $101.36 | $108.63 | $449.98 | $210.00 | $100.00 |
| 0740 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 12" (1050-51212) | LF | 16 | $337.39 | $361.60 | $2,245.45 | $210.00 | $825.00 |
| 0745 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 4 | $2,195.68 | $2,353.27 | $2,307.39 | $850.00 | $4,200.00 |
| 0750 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 4 | $2,375.73 | $2,546.33 | $3,397.50 | $1,600.00 | $3,800.00 |
| 0755 | Utility fixture, valve/meter box, furnish & install, 12" (1080-21112) | EACH | 1 | $1,116.51 | $1,196.65 | $3,058.65 | $1,900.00 | $2,500.00 |
| 0760 | Utility fixture, valve/meter box, adjust (1080-21500) | EACH | 7 | $1,055.31 | $1,131.05 | $2,239.11 | $800.00 | $1,500.00 |
| 0765 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 1 | $5,828.93 | $6,247.27 | $11,070 | $2,675.00 | $15,000 |
| 0770 | Utility fixture, mechanical joint restraint, furnish & install, 12" (1080-29112) | EACH | 12 | $1,312.87 | $1,407.09 | $1,009.24 | $375.00 | $1,200.00 |
| 0775 | Contingency SA (sixth) (SM only) (9999-26) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.