FDOT contract T1937 bid tabulation
44620415201. Let by Florida DOT on October 28, 2026, Hardee, District 1. 4 bids received; low bid $21,994,345 by Ajax Paving Industries of Florida LLC.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 203
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ajax Paving Industries of Florida LLC | $21,994,345 | Low |
| 2 | Superior Asphalt, Inc. | $23,274,274 | +6.0% |
| 3 | Hubbard Construction Company | $24,111,381 | +10% |
| 4 | C.W. Roberts Contracting, Inc. | $25,776,312 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ajax Paving Industries of Florida LLC | 2. Superior Asphalt, Inc. | 3. Hubbard Construction Company | 4. C.W. Roberts Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $51,385 | $53,720 | $127,711 | $54,929 |
| 0010 | Flowable fill (0121-70) | CY | 4.70 | $1,605.96 | $1,680.00 | $623.43 | $1,716.74 |
| 0015 | Conc class II, bridge superstructure (0400-2-4) | CY | 39.70 | $2,010.64 | $2,100.00 | $2,942.90 | $2,149.34 |
| 0020 | Concrete class II, approach slabs (0400-2-10) | CY | 20.60 | $1,134.50 | $1,185.00 | $1,832.37 | $1,212.76 |
| 0025 | Concrete class IV, bridge substructure (0400-4-5) | CY | 27.50 | $1,095.76 | $1,145.00 | $2,221.05 | $1,171.35 |
| 0030 | Bridge deck grooving (0400-7-1) | SY | 37 | $129.97 | $136.00 | $166.58 | $138.93 |
| 0035 | Bridge deck planing (0400-9-1) | SY | 159 | $30.24 | $32.00 | $38.87 | $32.33 |
| 0040 | Composite neoprene pads (0400-147) | CF | 0.70 | $4,449.42 | $4,650.00 | $11,105 | $4,756.37 |
| 0045 | Latex modified portland concrete, type I (0405-70-1) | CF | 50.80 | $559.14 | $585.00 | $516.39 | $597.71 |
| 0050 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 7,983 | $1.97 | $2.05 | $2.22 | $2.10 |
| 0055 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 3,906 | $2.53 | $2.65 | $2.50 | $2.70 |
| 0060 | Reinforcing steel- approach slabs (0415-1-9) | LB | 4,391 | $1.57 | $1.65 | $1.94 | $1.67 |
| 0065 | Prest beams: florida-I beam 54" (0450-2-54) | LF | 119 | $447.89 | $468.00 | $1,055.00 | $478.78 |
| 0068 | Preformed pile holes, 22" to 26" drill/punch size (0455-15-13) | LF | 78 | $69.86 | $73.00 | $83.29 | $74.68 |
| 0070 | Pile inspection, driven pile (0455-20-1) | EACH | 4 | $450.82 | $471.00 | $1,371.50 | $481.93 |
| 0075 | Prestressed concrete piling, SQ (0455-34-3) | LF | 140 | $313.22 | $327.00 | $471.97 | $334.83 |
| 0080 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 4 | $2,512.59 | $2,630.00 | $2,332.11 | $2,685.92 |
| 0085 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 282 | $52.28 | $55.00 | $138.82 | $55.89 |
| 0090 | Polymer nosing for bridge expansion joint (0458-2) | CF | 30.10 | $1,551.10 | $1,620.00 | $832.90 | $1,658.10 |
| 0093 | Galvanized steel sidewalk plate (0458-3-1) | LF | 13 | $308.71 | $325.00 | $749.61 | $330.01 |
| 0095 | Piles, polyethylene sheeting (0459-71) | SY | 30 | $66.12 | $69.00 | $277.63 | $70.68 |
| 0100 | Bullet rail, double rail (0515-4-2) | LF | 182 | $53.22 | $163.00 | $79.85 | $167.07 |
| 0105 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 182 | $152.00 | $160.00 | $277.63 | $162.49 |
| 0110 | Concrete parapet, pedestrian/bicycle, 27" height (0521-6-11) | LF | 182 | $104.02 | $110.00 | $249.87 | $111.19 |
| 0115 | Riprap, sand-cement bags (0530-1100) | CY | 10 | $1,064.72 | $1,110.00 | $1,665.79 | $1,138.11 |
| 0120 | Riprap- rubble, bank and shore (0530-3-3) | TN | 346.60 | $95.51 | $100.00 | $205.45 | $102.10 |
| 0125 | Riprap- rubble, remove existing and reinstall (0530-3-8) | CY | 8.40 | $907.84 | $950.00 | $1,832.37 | $970.47 |
| 0130 | Bedding stone (0530-74) | TN | 118.50 | $122.25 | $128.00 | $205.45 | $130.68 |
| 0135 | Mobilization (0101-1) | LS | 1 | $305,000 | $508,279 | $593,706 | $505,090 |
| 0140 | Mobilization (0101-1) | LS | 1 | $497,000 | $889,000 | $400,000 | $732,368 |
| 0145 | Maintenance of traffic (0102-1) | DA | 1 | $310,600 | $350,800 | $562,924 | $322,094 |
| 0150 | Maintenance of traffic (0102-1) | DA | 1 | $495,970 | $362,500 | $400,000 | $322,094 |
| 0155 | Special detour- temporary pavement (0102-2200) | SY | 1 | $12,730 | $26,000 | $15,386 | $10,155 |
| 0160 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,320 | $12,100 | $12,559 | $6,323.00 |
| 0165 | Traffic control officer (0102-14) | HR | 3,720 | $80.00 | $58.85 | $82.04 | $91.87 |
| 0170 | Work zone sign (0102-60) | ED | 132,137 | $0.18 | $0.22 | $0.20 | $0.28 |
| 0175 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 5,712 | $24.57 | $25.15 | $37.76 | $35.28 |
| 0180 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 4,538 | $8.37 | $8.55 | $15.55 | $12.01 |
| 0185 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 245,392 | $0.09 | $0.12 | $0.10 | $0.15 |
| 0190 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 118,180 | $0.04 | $0.05 | $0.04 | $0.07 |
| 0195 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,125 | $5.22 | $5.15 | $5.47 | $6.44 |
| 0200 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 8,652 | $4.18 | $4.30 | $4.44 | $4.41 |
| 0205 | Temporary crash cushion, redirective option (0102-89-1) | LO | 11 | $1,150.32 | $1,285.00 | $999.47 | $4,012.63 |
| 0210 | Portable changeable message sign, temporary (0102-99) | ED | 5,212 | $9.41 | $11.25 | $9.84 | $14.09 |
| 0215 | Temporary signalization and maintenance, intersection (0102-104) | ED | 4,250 | $6.28 | $19.85 | $16.91 | $20.03 |
| 0220 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 4,250 | $5.22 | $19.85 | $19.89 | $20.03 |
| 0225 | Type III barricade (0102-115) | ED | 5,550 | $0.24 | $0.30 | $0.25 | $0.35 |
| 0230 | Portable regulatory, sign (0102-150-1) | ED | 4,250 | $5.22 | $0.11 | $5.47 | $0.13 |
| 0235 | Radar speed display unit (0102-150-2) | ED | 4,250 | $5.22 | $0.11 | $5.47 | $0.13 |
| 0240 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.07 | $4,182.99 | $4,280.00 | $4,318.61 | $4,408.75 |
| 0245 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.09 | $10,457 | $10,700 | $10,747 | $10,971 |
| 0250 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.07 | $4,182.99 | $4,280.00 | $4,318.61 | $4,408.75 |
| 0255 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.09 | $10,457 | $10,700 | $10,747 | $10,971 |
| 0260 | Sediment barrier (0104-10-3) | LF | 56,291 | $0.90 | $2.30 | $1.07 | $0.11 |
| 0265 | Floating turbidity barrier (0104-11) | LF | 46 | $20.92 | $28.50 | $21.88 | $21.76 |
| 0270 | Inlet protection system (0104-18) | EACH | 297 | $177.77 | $211.00 | $114.34 | $184.93 |
| 0275 | Litter removal (0107-1) | ACRE | 1,621.45 | $25.00 | $29.50 | $30.69 | $29.87 |
| 0280 | Mowing (0107-2) | ACRE | 1,369.43 | $50.00 | $57.50 | $59.96 | $58.35 |
| 0285 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $20,000 | $10,600 | $82,910 | $8,106.01 |
| 0290 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $5,000.00 | $9,650.00 | $29,534 | $8,646.42 |
| 0295 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,341.99 | $26,000 | $27,008 | $64,997 |
| 0300 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $152,738 | $206,000 | $213,704 | $109,600 |
| 0305 | Removal of existing concrete (0110-4-10) | SY | 2,947 | $30.10 | $33.00 | $34.05 | $33.76 |
| 0310 | Regular excavation (0120-1) | CY | 2,393.70 | $23.39 | $26.40 | $27.40 | $20.18 |
| 0315 | Subsoil excavation (0120-4) | CY | 132.60 | $79.39 | $46.20 | $47.94 | $71.89 |
| 0320 | Embankment (0120-6) | CY | 5,228.80 | $43.43 | $59.85 | $62.11 | $31.83 |
| 0325 | Type B stabilization (0160-4) | SY | 340 | $76.42 | $55.00 | $57.91 | $41.26 |
| 0330 | Optional base, base group 02 (0285-702) | SY | 658 | $35.00 | $91.00 | $57.41 | $78.71 |
| 0335 | Optional base, base group 09 (0285-709) | SY | 219 | $125.62 | $78.00 | $177.99 | $104.78 |
| 0340 | Optional base, base group 10 (0285-710) | SY | 200 | $137.44 | $94.00 | $99.38 | $114.56 |
| 0345 | Turnout base- optional materials (0286-1) | SY | 590 | $30.00 | $78.00 | $81.07 | $48.11 |
| 0350 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 140,693 | $3.01 | $2.10 | $3.08 | $4.33 |
| 0355 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 37,760 | $5.75 | $8.30 | $8.17 | $7.91 |
| 0360 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 23,953 | $4.67 | $2.60 | $4.48 | $6.08 |
| 0365 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 31,773 | $2.31 | $2.35 | $3.87 | $6.45 |
| 0370 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 192,653 | $4.39 | $2.30 | $4.77 | $5.17 |
| 0375 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 12,196.40 | $137.00 | $135.30 | $116.95 | $126.99 |
| 0380 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 8,098.30 | $140.00 | $161.20 | $149.09 | $160.65 |
| 0385 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 29,551.90 | $140.00 | $163.75 | $147.45 | $170.44 |
| 0390 | Superpave asphaltic concrete, traffic E, high polymer (0334-1-59) | TN | 1,133.50 | $204.95 | $183.70 | $183.47 | $209.89 |
| 0395 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 9,008.80 | $233.00 | $216.10 | $240.10 | $252.87 |
| 0400 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 11,803.60 | $171.00 | $165.40 | $160.23 | $181.32 |
| 0405 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 2,515.20 | $214.00 | $182.60 | $191.77 | $216.02 |
| 0410 | Asphalt concrete friction course,traffic E, FC-12.5, high polymer (0337-7-95) | TN | 1,144.20 | $197.63 | $183.60 | $187.53 | $209.93 |
| 0415 | Miscellaneous asphalt (0339-1) | TN | 224.40 | $331.96 | $187.30 | $328.82 | $645.08 |
| 0420 | Geosynthetic interlayer reinforcement system, composite fiberglass (0342-1-2) | SY | 13,339 | $13.07 | $8.00 | $8.75 | $35.22 |
| 0425 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 863.90 | $812.09 | $944.00 | $745.16 | $1,034.14 |
| 0430 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 4 | $6,481.88 | $5,770.00 | $5,987.90 | $11,231 |
| 0435 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 1 | $4,602.71 | $6,260.00 | $6,493.28 | $10,697 |
| 0440 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $8,708.28 | $6,825.00 | $7,080.55 | $12,034 |
| 0445 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 2 | $8,719.07 | $9,170.00 | $9,518.81 | $14,307 |
| 0450 | Inlets, gutter, type S, J bottom <10' (0425-1703) | EACH | 1 | $11,056 | $11,120 | $11,543 | $16,179 |
| 0455 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $10,369 | $9,615.00 | $9,977.73 | $13,504 |
| 0460 | Manhole, adjust (0425-5) | EACH | 20 | $283.21 | $1,365.00 | $1,416.22 | $785.49 |
| 0465 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 76 | $213.66 | $265.00 | $276.04 | $144.76 |
| 0470 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 76 | $239.49 | $300.00 | $313.40 | $166.16 |
| 0475 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 191 | $203.91 | $370.00 | $384.11 | $176.25 |
| 0480 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 526 | $132.88 | $288.00 | $299.56 | $118.49 |
| 0485 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 112 | $215.75 | $327.00 | $340.30 | $142.82 |
| 0490 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 7 | $1,518.12 | $452.00 | $468.94 | $653.91 |
| 0495 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 29 | $345.28 | $492.00 | $510.52 | $264.74 |
| 0505 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 5 | $2,795.09 | $3,750.00 | $3,890.82 | $10,830 |
| 0510 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 1 | $9,004.10 | $11,900 | $12,352 | $19,254 |
| 0515 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 3 | $3,650.02 | $3,310.00 | $3,433.78 | $10,830 |
| 0520 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 4 | $3,893.94 | $3,970.00 | $4,123.19 | $10,964 |
| 0525 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 12 | $152.51 | $193.00 | $196.90 | $200.56 |
| 0530 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 2,599 | $96.21 | $91.00 | $92.98 | $94.71 |
| 0535 | Concrete curb & gutter, type F (0520-1-10) | LF | 2,582 | $40.00 | $48.50 | $50.33 | $79.82 |
| 0540 | Shoulder gutter- concrete (0520-6) | LF | 221 | $46.19 | $49.00 | $51.01 | $58.82 |
| 0545 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 9,235 | $54.77 | $69.20 | $71.84 | $86.38 |
| 0550 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,603 | $86.22 | $158.00 | $164.05 | $108.20 |
| 0555 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 148 | $182.58 | $104.00 | $107.61 | $105.77 |
| 0560 | Detectable warnings (0527-2) | SF | 1,127 | $21.64 | $34.00 | $36.16 | $37.83 |
| 0565 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 41.80 | $476.46 | $246.00 | $254.98 | $229.84 |
| 0570 | Bedding stone (0530-74) | TN | 30 | $557.66 | $191.00 | $198.45 | $103.62 |
| 0575 | Guardrail -roadway, general (0536-1-1) | LF | 6,207 | $21.44 | $22.00 | $22.77 | $29.04 |
| 0580 | Pipe rail for guardrail (0536-6) | LF | 3,080 | $19.87 | $20.00 | $21.10 | $24.63 |
| 0585 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 8 | $313.73 | $214.00 | $333.16 | $43.11 |
| 0590 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 1 | $3,816.98 | $3,905.00 | $4,053.42 | $3,696.25 |
| 0595 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 1 | $1,803.92 | $1,845.00 | $1,915.66 | $1,270.96 |
| 0600 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 5 | $4,366.00 | $4,470.00 | $4,636.45 | $3,920.60 |
| 0605 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 1 | $3,084.96 | $3,160.00 | $3,276.05 | $1,953.32 |
| 0610 | Guardrail removal (0536-73) | LF | 4,544 | $2.36 | $2.40 | $2.50 | $1.09 |
| 0615 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 6 | $1,568.62 | $1,605.00 | $1,665.79 | $1,424.48 |
| 0620 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 10 | $3,764.69 | $3,850.00 | $3,997.90 | $3,548.01 |
| 0625 | Fencing, type A, 5.1-6.0, standard (0550-10120) | LF | 592 | $13.16 | $13.90 | $14.22 | $14.49 |
| 0630 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 40 | $18.22 | $22.50 | $22.97 | $23.40 |
| 0635 | Fence gate, type B, double, 18.1- 20.0' opening (0550-60224) | EACH | 1 | $2,481.10 | $2,995.00 | $3,062.83 | $3,119.84 |
| 0640 | Performance turf, sod (0570-1-2) | SY | 42,244 | $4.77 | $4.95 | $5.93 | $4.98 |
| 0645 | Shoulder drop off soil (0570-13-1) | CY | 2,624.90 | $12.99 | $23.40 | $63.46 | $48.08 |
| 0650 | Plastic erosion mat, TRM, type 2 (0571-1-12) | SY | 4,776 | $7.06 | $8.85 | $9.16 | $7.34 |
| 0655 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 23.61 | $1,464.05 | $1,500.00 | $1,554.67 | $1,587.09 |
| 0660 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.32 | $1,568.62 | $1,600.00 | $1,628.99 | $1,716.66 |
| 0665 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.21 | $2,091.49 | $2,140.00 | $2,135.63 | $2,289.23 |
| 0670 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 9,722 | $1.04 | $1.10 | $1.11 | $1.13 |
| 0675 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,196 | $1.31 | $1.35 | $1.39 | $1.42 |
| 0680 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 6,605 | $1.57 | $1.60 | $1.67 | $1.70 |
| 0685 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 30.92 | $732.02 | $750.00 | $777.29 | $793.76 |
| 0690 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.14 | $1,254.90 | $1,285.00 | $1,246.40 | $1,370.22 |
| 0695 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.46 | $732.02 | $750.00 | $762.14 | $795.29 |
| 0700 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 35 | $67.97 | $70.00 | $72.18 | $73.69 |
| 0705 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 358 | $31.37 | $32.00 | $33.32 | $34.01 |
| 0710 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 14 | $10.46 | $11.00 | $11.11 | $11.34 |
| 0715 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 21.83 | $1,464.05 | $1,500.00 | $1,554.45 | $1,586.87 |
| 0720 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,367 | $1.31 | $1.30 | $1.39 | $1.42 |
| 0725 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.98 | $732.02 | $750.00 | $772.59 | $796.83 |
| 0730 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 |
| 0735 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 |
| 0740 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 0745 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 14.86 | $1,941.12 | $164.00 | $2,023.51 | $2,756.16 |
| 0750 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 153 | $439.21 | $650.00 | $466.42 | $658.09 |
| 0755 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 57 | $2,091.49 | $1,585.00 | $2,221.05 | $1,599.81 |
| 0760 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 19 | $2,509.79 | $1,900.00 | $2,665.26 | $1,923.91 |
| 0765 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $366.01 | $525.00 | $388.68 | $530.06 |
| 0770 | Single column ground sign assembly, remove (0700-1600) | EACH | 171 | $20.92 | $122.00 | $22.21 | $122.67 |
| 0775 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 1 | $6,797.36 | $3,400.00 | $7,218.42 | $3,442.34 |
| 0780 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $7,320.24 | $3,985.00 | $7,773.69 | $4,025.03 |
| 0785 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 5 | $8,156.83 | $4,580.00 | $8,662.11 | $4,623.45 |
| 0790 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 8 | $1,568.62 | $730.00 | $1,665.79 | $736.03 |
| 0795 | Sign panel, furnish & install ground mount, 51-100 SF (0700-3105) | EACH | 1 | $2,614.37 | $7,800.00 | $2,776.32 | $7,865.19 |
| 0800 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 26 | $104.58 | $122.00 | $111.05 | $122.67 |
| 0805 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 1 | $209.15 | $970.00 | $222.11 | $981.37 |
| 0810 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 89 | $104.58 | $76.00 | $111.05 | $77.08 |
| 0815 | Tubular marker, 36" white post (0704-1-3) | EACH | 2 | $209.15 | $165.00 | $222.11 | $166.35 |
| 0820 | Tubular marker, 36" yellow (0704-1-4) | EACH | 6 | $209.15 | $165.00 | $222.11 | $166.35 |
| 0825 | Object marker, type 1 (0705-10-1) | EACH | 21 | $313.73 | $165.00 | $333.16 | $166.97 |
| 0830 | Object marker, type 3 (0705-10-3) | EACH | 2 | $313.73 | $280.00 | $333.16 | $286.75 |
| 0835 | Delineator, flexible tubular (0705-11-1) | EACH | 65 | $104.58 | $70.00 | $111.05 | $201.43 |
| 0840 | Raised pavement marker, type B (0706-1-3) | EACH | 5,321 | $4.18 | $4.30 | $4.44 | $4.53 |
| 0845 | Painted pavement markings, surface (0710-90) | LS | 1 | $67,974 | $69,550 | $72,184 | $73,689 |
| 0850 | Painted pavement markings, surface (0710-90) | LS | 1 | $44,444 | $45,500 | $47,197 | $48,182 |
| 0855 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.21 | $9,411.73 | $9,630.00 | $9,610.34 | $10,301 |
| 0860 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 9,786 | $4.18 | $4.30 | $4.44 | $4.53 |
| 0865 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,587 | $5.22 | $5.35 | $5.55 | $5.67 |
| 0870 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,099 | $6.28 | $6.40 | $6.66 | $6.80 |
| 0875 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.45 | $3,137.25 | $3,210.00 | $3,329.28 | $3,398.71 |
| 0880 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 43 | $261.44 | $268.00 | $277.63 | $283.42 |
| 0885 | Thermoplastic, standard, arrow (0711-11170) | EACH | 356 | $88.89 | $91.00 | $94.39 | $96.36 |
| 0890 | Thermoplastic, standard, yield line (0711-11180) | LF | 14 | $15.68 | $16.00 | $16.66 | $17.01 |
| 0895 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 972 | $5.22 | $5.35 | $5.55 | $5.67 |
| 0900 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.95 | $3,137.25 | $3,210.00 | $3,306.95 | $3,411.83 |
| 0905 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 5,577 | $15.68 | $16.00 | $16.66 | $17.01 |
| 0910 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 4 | $235.29 | $241.00 | $249.87 | $255.08 |
| 0915 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 4 | $104.58 | $110.00 | $111.05 | $113.37 |
| 0920 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 13.16 | $5,751.60 | $5,900.00 | $6,105.58 | $6,237.63 |
| 0925 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.27 | $6,274.48 | $6,400.00 | $6,440.26 | $6,827.36 |
| 0930 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 13.03 | $2,614.37 | $2,670.00 | $2,776.10 | $2,833.99 |
| 0935 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 10.54 | $5,751.60 | $5,900.00 | $6,107.32 | $6,234.67 |
| 0940 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 8.79 | $5,228.74 | $5,350.00 | $5,547.58 | $5,669.71 |
| 0945 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.06 | $5,751.60 | $5,900.00 | $5,453.57 | $6,680.71 |
| 0950 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 11.53 | $2,300.64 | $2,360.00 | $2,442.73 | $2,495.84 |
| 0955 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.14 | $4,182.99 | $4,280.00 | $4,154.53 | $4,567.34 |
| 0960 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 8.63 | $5,228.74 | $5,350.00 | $5,551.99 | $5,667.77 |
| 0965 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 32 | $115.04 | $118.00 | $122.16 | $124.71 |
| 0970 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.33 | $31,372 | $32,100 | $32,803 | $34,534 |
| 0975 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.35 | $10,457 | $10,700 | $10,850 | $11,402 |
| 0980 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.33 | $31,372 | $32,100 | $32,803 | $34,534 |
| 0985 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.34 | $10,457 | $10,700 | $10,976 | $11,205 |
| 0990 | Fiber optic cable locator (0633-6) | DA | 425 | $15.68 | $219.00 | $199.99 | $220.81 |
| 0995 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 4 | $379.61 | $350.00 | $425.40 | $352.26 |
| 1000 | Loop assembly, F&I, type B (0660-2102) | AS | 51 | $1,443.13 | $55.00 | $1,718.15 | $1,740.53 |
| 1005 | Loop assembly, F&I, type F (0660-2106) | AS | 24 | $2,478.42 | $26.00 | $2,320.33 | $1,985.88 |
| 1010 | Traffic controller, modify (0671-2-40) | EACH | 8 | $4,392.14 | $9.00 | $557.98 | $1,226.71 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.