FDOT contract T4741 bid tabulation
SR 814 (ATLANTIC BLVD) AT LYONS RD. Let by Florida DOT on September 24, 2025, Broward, District 4. 5 bids received; low bid $1,013,087 by Jva Engineering Contractor, Inc.
- Owner
- Florida DOT
- Letting
- 24 SEP 2025
- Pay items
- 58
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jva Engineering Contractor, Inc | $1,013,087 | Low |
| 2 | Weekley Asphalt Paving, Inc. | $1,053,257 | +4.0% |
| 3 | Florida Engineering & Development Corp | $1,103,721 | +9.0% |
| 4 | R & D Paving LLC | $1,146,946 | +13% |
| 5 | General Asphalt Company, LLC | $1,242,838 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jva Engineering Contractor, Inc | 2. Weekley Asphalt Paving, Inc. | 3. Florida Engineering & Development Corp | 4. R & D Paving LLC | 5. General Asphalt Company, LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $120,000 | $71,240 | $96,103 | $110,000 | $100,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $120,000 | $177,570 | $91,512 | $77,700 | $275,000 |
| 0015 | Work zone sign (0102-60) | ED | 5,453 | $0.27 | $0.23 | $0.21 | $0.25 | $0.23 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 19,950 | $0.13 | $0.11 | $0.10 | $0.15 | $0.11 |
| 0025 | Arrow board / advance warning arrow panel (0102-76) | ED | 266 | $6.60 | $6.00 | $4.46 | $6.60 | $4.80 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 294 | $11.90 | $12.00 | $10.04 | $13.20 | $10.80 |
| 0035 | Sediment barrier (0104-10-3) | LF | 2,743 | $4.45 | $2.70 | $3.12 | $2.85 | $3.60 |
| 0040 | Inlet protection system (0104-18) | EACH | 12 | $210.00 | $165.00 | $103.04 | $315.00 | $198.00 |
| 0045 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $12,390 | $56,840 | $41,397 | $70,000 | $18,240 |
| 0050 | Removal of existing concrete (0110-4-10) | SY | 470 | $57.15 | $39.00 | $49.13 | $47.90 | $29.40 |
| 0055 | Tree protection barrier (0110-21) | LF | 60 | $6.05 | $17.00 | $7.71 | $3.85 | $9.60 |
| 0060 | Tree root and branch pruning (0110-22) | EACH | 2 | $3,000.00 | $1,667.00 | $5,575.00 | $5,500.00 | $1,800.00 |
| 0065 | Regular excavation (0120-1) | CY | 616 | $33.45 | $40.00 | $75.68 | $46.00 | $78.00 |
| 0070 | Embankment (0120-6) | CY | 0.60 | $371.70 | $500.00 | $317.90 | $8,750.00 | $1,200.00 |
| 0075 | Type B stabilization (0160-4) | SY | 780 | $17.95 | $20.00 | $15.50 | $31.80 | $6.00 |
| 0080 | Optional base, base group 11 (0285-711) | SY | 780 | $44.60 | $43.00 | $36.74 | $58.00 | $62.40 |
| 0085 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,189 | $7.00 | $3.50 | $8.59 | $5.70 | $7.61 |
| 0090 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 323.10 | $214.00 | $250.00 | $257.75 | $240.00 | $239.19 |
| 0095 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 284.30 | $290.00 | $265.00 | $233.58 | $257.00 | $294.27 |
| 0100 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 1 | $12,700 | $17,210 | $12,697 | $16,500 | $18,976 |
| 0105 | Inlets, curb, type P-5, modify (0425-1359) | EACH | 1 | $10,000 | $8,940.00 | $12,995 | $11,550 | $11,819 |
| 0110 | Inlets, curb, type 8, <10' (0425-1481) | EACH | 1 | $11,300 | $12,000 | $10,737 | $8,250.00 | $9,000.00 |
| 0115 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $8,800.00 | $12,000 | $10,140 | $7,700.00 | $9,000.00 |
| 0120 | Manhole, adjust (0425-5) | EACH | 1 | $1,100.00 | $1,200.00 | $1,985.96 | $935.00 | $1,020.00 |
| 0125 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 5 | $545.00 | $510.00 | $624.07 | $715.00 | $768.00 |
| 0130 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 148 | $167.00 | $233.00 | $138.63 | $192.50 | $195.60 |
| 0135 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 49 | $300.00 | $615.00 | $884.87 | $522.50 | $600.00 |
| 0140 | Concrete curb & gutter, type F (0520-1-10) | LF | 534 | $84.00 | $53.74 | $61.41 | $75.00 | $53.70 |
| 0145 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 247 | $57.50 | $84.73 | $111.91 | $74.00 | $78.00 |
| 0150 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 168 | $95.70 | $84.73 | $85.94 | $116.15 | $52.80 |
| 0155 | Performance turf, sod (0570-1-2) | SY | 331 | $13.20 | $6.50 | $11.10 | $25.50 | $19.20 |
| 0160 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $14,800 | $33,350 | $22,322 | $22,022 | $48,000 |
| 0165 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $48,941 | $48,941 | $48,941 | $48,941 | $48,941 |
| 0170 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $4,330.00 | $16,120 | $6,831.81 | $7,000.00 | $3,600.00 |
| 0175 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $737.00 | $595.00 | $663.43 | $1,100.00 | $600.00 |
| 0180 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $12.40 | $10.00 | $11.15 | $82.50 | $180.00 |
| 0185 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 5 | $87.00 | $70.00 | $78.05 | $82.50 | $180.00 |
| 0190 | Raised pavement marker, type B (0706-1-3) | EACH | 76 | $6.20 | $5.00 | $5.58 | $7.70 | $4.80 |
| 0195 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,600.00 | $2,905.00 | $6,806.07 | $5,500.00 | $1,800.00 |
| 0200 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.05 | $8,180.00 | $6,600.00 | $7,358.89 | $10,450 | $2,760.00 |
| 0205 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.09 | $2,850.00 | $2,300.00 | $2,564.53 | $4,950.00 | $1,140.00 |
| 0210 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $322.00 | $200.00 | $289.90 | $330.00 | $420.00 |
| 0215 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 10 | $185.00 | $150.00 | $167.25 | $770.00 | $420.00 |
| 0220 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.34 | $7,850.00 | $6,400.00 | $7,064.66 | $9,350.00 | $5,202.00 |
| 0225 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.29 | $2,850.00 | $2,300.00 | $2,564.50 | $4,950.00 | $1,320.00 |
| 0230 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.02 | $2,850.00 | $2,300.00 | $2,564.71 | $4,950.00 | $1,320.00 |
| 0235 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.12 | $7,850.00 | $6,400.00 | $7,064.53 | $9,350.00 | $5,202.00 |
| 0240 | Conduit, furnish & install, open trench (0630-2-11) | LF | 778 | $24.80 | $19.00 | $22.48 | $22.20 | $28.80 |
| 0245 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $2,040.00 | $1,400.00 | $1,933.42 | $1,908.00 | $2,160.00 |
| 0250 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $8,670.00 | $5,375.00 | $7,421.72 | $7,322.00 | $6,480.00 |
| 0255 | Electrical service wire, & install (0639-2-1) | LF | 13 | $16.10 | $12.00 | $17.35 | $17.15 | $12.00 |
| 0260 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,600.00 | $1,700.00 | $4,647.19 | $4,585.00 | $3,420.00 |
| 0265 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,800 | $3.70 | $2.00 | $4.19 | $4.15 | $9.60 |
| 0270 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 37 | $2,230.00 | $1,245.00 | $1,546.24 | $1,526.00 | $1,710.00 |
| 0275 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 5 | $10,530 | $10,200 | $13,636 | $13,453 | $14,700 |
| 0280 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 5 | $930.00 | $675.00 | $1,216.42 | $1,201.00 | $1,260.00 |
| 0285 | Relocate trees and palms, less than or equal to 3.0" DBH (0581-1300) | EACH | 3 | $3,700.00 | $1,667.00 | $13,938 | $13,750 | $1,800.00 |
| 0290 | Relocate trees and palms, 16.1" or greater DBH (0581-1360) | EACH | 1 | $9,900.00 | $16,700 | $44,600 | $44,000 | $18,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.