FDOT contract T5878 bid tabulation

SR 438 AT HASTINGS ST / SHERINGHAM RD INTERSECTION. Let by Florida DOT on March 25, 2026, Orange, District 5. 3 bids received; low bid $1,041,041 by Traffic Control Devices, Inc..

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
111
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Traffic Control Devices, Inc.$1,041,041Low
2Chinchor Electric Inc.$1,049,878+1.0%
3Blacktip Services Incorporated$1,143,617+10%
FDOT contract T5878: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Traffic Control Devices, Inc.2. Chinchor Electric Inc.3. Blacktip Services Incorporated
0005Mobilization (0101-1)LS1$100,230$105,360$171,659
0010Maintenance of traffic (0102-1)DA1$71,195$73,811$15,000
0015Traffic control officer (0102-14)HR80$115.00$104.50$85.00
0020Work zone sign (0102-60)ED6,112$0.25$0.33$0.50
0025Business sign (0102-61)EACH2$51.50$27.50$50.00
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED49,072$0.10$0.12$0.10
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,008$0.10$0.06$0.10
0040Arrow board / advance warning arrow panel (0102-76)ED2,040$4.60$0.50$5.00
0045Portable changeable message sign, temporary (0102-99)ED368$11.00$11.28$11.00
0050Temporary signalization and maintenance, intersection (0102-104)ED170$54.50$34.10$34.37
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED170$2.00$5.50$30.25
0060Type III barricade (0102-115)ED2,040$0.30$0.30$0.30
0065Artificial coverings /rolled erosion control products (0104-1)SY11$15.00$11.17$40.00
0070Sediment barrier (0104-10-3)LF495$10.50$16.23$4.00
0075Inlet protection system (0104-18)EACH6$272.00$350.46$50.00
0080Litter removal (0107-1)ACRE0.42$97.50$1,452.00$100.00
0085Mowing (0107-2)ACRE0.42$97.50$1,452.00$100.00
0090Clearing & grubbing (0110-1-1)ACRE1$25,798$19,800$40,000
0095Removal of existing concrete (0110-4-10)SY205$52.50$63.80$50.00
0100Borrow excavation, truck measure (0120-2-2)CY26$116.00$125.40$20.00
0105Regular excavation (3-R projects only) (0120-71)LS1$17,222$17,129$41,000
0110Type B stabilization (0160-4)SY126$80.50$107.80$25.00
0115Optional base, base group 11 (0285-711)SY106$167.00$169.40$70.00
0120Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY2,487$13.50$8.20$7.45
0125Superpave asphaltic conc, traffic C (0334-1-13)TN8.70$363.00$576.40$400.00
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN213.90$403.00$315.70$370.00
0135Concrete curb & gutter, type E (0520-1-7)LF51$71.00$159.50$75.00
0140Concrete curb & gutter, type F (0520-1-10)LF177$71.00$159.50$75.00
0145Concrete curb, type B (0520-2-2)LF48$71.00$159.50$75.00
0150Concrete sidewalk and driveways, 4" thick (0522-1)SY79$88.50$161.70$75.00
0155Concrete sidewalk and driveways, 6" thick (0522-2)SY93$116.00$194.70$100.00
0160Pavers, architectural, remove existing and reinstall (0526-1101)SY21$376.00$488.40$55.00
0165Detectable warnings (0527-2)SF90$55.00$85.80$37.00
0170Performance turf, sod (0570-1-2)SY141$24.00$7.81$8.00
0175Raised pavement marker, type B (0706-1-3)EACH53$5.15$9.36$6.60
0180Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.12$2,529.00$2,072.40$2,200.00
0185Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF616$2.85$2.48$3.30
0190Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF145$5.75$3.42$3.30
0195Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.02$1,954.00$1,302.40$1,100.00
0200Painted pavement markings, standard, white, arrows (0710-11170)EACH6$63.00$78.10$55.00
0205Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.12$2,529.00$2,198.90$2,200.00
0210Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF33$4.60$3.30$3.30
0215Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.06$1,954.00$1,259.50$1,100.00
0220Initial contingency amount, DO not bid (0999-25)LS1$40,000$40,000$40,000
0225Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH3$790.00$1,097.80$770.00
0230Single column ground sign assembly, remove (0700-1600)EACH3$108.00$170.50$110.00
0235Tubular marker, 36" yellow (0704-1-4)EACH13$309.00$328.90$275.00
0240Object marker, type 1 (0705-10-1)EACH1$175.00$562.10$110.00
0245Raised pavement marker, type B (0706-1-3)EACH99$5.75$10.78$6.60
0250Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF48$6.90$10.89$11.00
0255Painted pavement markings, surface (0710-90)LS1$3,276.00$10,450$6,600.00
0260Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF616$4.60$5.39$6.60
0265Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF145$9.20$7.81$13.20
0270Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.02$4,551.00$4,510.00$6,600.00
0275Thermoplastic, standard, arrow (0711-11170)EACH6$144.00$125.40$88.00
0280Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF33$6.90$6.49$9.00
0285Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.06$4,551.00$4,950.00$6,600.00
0290Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF599$19.50$23.38$20.00
0295Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.12$10,344$10,010$8,800.00
0300Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.12$10,344$10,010$8,800.00
0305Anti-graffiti coating, non- sacrificial (0563-4)SF96$144.00$1.80$29.74
0310Itsfm subsurface documentation- project length (0611-1-1)MI0.08$4,173.00$3,850.00$4,813.00
0315Itsfm location documentation- intersection (0611-2-1)EACH1$1,669.00$2,777.50$3,472.00
0320Conduit, furnish & install, open trench (0630-2-11)LF120$14.00$16.54$13.30
0325Conduit, furnish & install, directional bore (0630-2-12)LF815$35.50$31.14$40.00
0330Conduit, furnish & install, aboveground (0630-2-14)LF90$69.50$54.85$14.69
0335Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$15,917$9,577.72$27,600
0340Signal cable, remove- intersection (0632-7-6)PI1$1,528.00$2,640.00$3,182.00
0345Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF650$4.45$4.68$5.30
0350Fiber optic cable, remove, underground (0633-1620)LF40$1.15$1.10$1.40
0355Fiber optic connection, install, splice (0633-2-31)EACH12$51.50$49.50$61.88
0360Fiber optic connection, install, termination (0633-2-32)EACH12$86.00$82.50$103.14
0365Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,477.00$1,413.50$1,767.00
0370Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH2$57.50$55.00$138.00
0375Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH1$97.50$93.50$117.00
0380Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,304.00$1,248.50$1,561.00
0385Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH1$603.00$577.50$722.00
0390Fiber optic cable locator (0633-6)DA170$194.00$165.00$206.00
0395Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$8,094.00$10,297$15,794
0400Span wire assembly, remove- poles remain (0634-4600)PI1$1,528.00$2,200.00$3,183.00
0405Fiberglass insulator, furnish & install (0634-5-1)LF40$63.50$44.77$842.00
0410Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH21$1,235.00$1,519.20$1,414.00
0415Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$3,279.00$2,446.39$3,059.00
0420Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$6,925.00$4,452.88$5,386.00
0425Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112)AS1$7,331.00$4,997.85$8,221.00
0430Electrical power service, remove overhead (0639-1610)AS1$1,313.00$880.00$796.00
0435Electrical service wire, & install (0639-2-1)LF145$7.65$5.41$6.17
0440Electrical service wire, (0639-2-6)LF85$3.00$0.88$1.20
0445Prestressed concrete pole, type P-VIII (0641-2-18)EACH2$18,487$24,610$8,250.00
0450Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH4$306.00$660.00$7,956.00
0455Aluminum signals pole, (0646-1-11)EACH8$2,691.00$2,925.33$4,593.00
0460Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS10$1,999.00$2,122.89$2,377.00
0465Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$3,048.00$3,115.45$3,394.00
0470Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$887.00$787.85$892.00
0475Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS2$102.00$110.00$597.00
0480Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$20,114$22,786$29,928
0485Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH4$9,495.00$5,236.00$11,362
0490Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$3,042.00$4,130.02$8,464.00
0495Signal priority and preemption system, furnish and install, replace cabinet electronics (0663-1121)EACH1$9,120.00$7,621.66$10,544
0500Signal priority and preemption system, furnish and install, detector (0663-1122)EACH1$8,122.00$8,918.66$10,860
0505Pedestrian detector, furnish & install, accessible (0665-1-12)EACH8$1,536.00$2,038.33$344.00
0510Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH2$166.00$55.00$80.00
0515Traffic controller assembly, F&I, NEMA W/electronic lock, 1 preemption (0670-5171)AS1$42,581$44,647$41,551
0520Traffic controller assembly, remove controller with (0670-5600)AS1$1,492.00$2,585.00$3,182.00
0525ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$8,575.00$6,594.50$5,840.00
0530Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,359.00$4,053.50$3,619.00
0535Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14)EACH1$18,263$16,334$18,022
0540Remote power management rpmu, furnish and install (0685-2-1)EACH1$1,879.00$949.74$3,740.00
0545Sign panel, remove, UP to 12 SF (0700-3601)EACH6$153.00$68.75$398.00
0550Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$7,444.00$8,530.52$5,091.00
0555Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH2$8,104.00$8,055.85$6,964.00
FDOT contract T5878: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy