FDOT contract T7616 bid tabulation
SR 55 (US 19) FROM S OF TUDOR LN TO N OF TUDOR LN. Let by Florida DOT on October 28, 2026, Pasco, District 7. 5 bids received; low bid $889,242 by Chinchor Electric Inc..
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 82
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chinchor Electric Inc. | $889,242 | Low |
| 2 | Sun Civil LLC | $1,004,532 | +13% |
| 3 | Blacktip Services Incorporated | $1,019,891 | +15% |
| 4 | American Lighting and Signalization, LLC. | $1,064,144 | +20% |
| 5 | Ajax Paving Industries of Florida LLC | $1,067,387 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chinchor Electric Inc. | 2. Sun Civil LLC | 3. Blacktip Services Incorporated | 4. American Lighting and Signalization, LLC. | 5. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $88,180 | $90,000 | $118,000 | $140,105 | $106,000 |
| 0010 | Maintenance of traffic 150 days (0102-1) | DA | 1 | $46,386 | $36,015 | $16,000 | $60,000 | $85,000 |
| 0015 | Work zone sign (0102-60) | ED | 4,320 | $0.32 | $0.25 | $2.22 | $0.21 | $0.01 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 11,940 | $0.13 | $0.14 | $0.11 | $0.10 | $0.02 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 7,020 | $0.06 | $0.06 | $0.07 | $0.06 | $0.01 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $5.18 | $7.06 | $5.50 | $5.57 | $2.00 |
| 0035 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 30 | $7.56 | $11.76 | $5.50 | $5.58 | $11.52 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 328 | $11.34 | $14.11 | $12.00 | $10.59 | $11.12 |
| 0045 | Existing ITS maintenance (0102-112) | DA | 150 | $108.00 | $130.62 | $34.62 | $111.50 | $139.81 |
| 0050 | Inlet protection system (0104-18) | EACH | 6 | $216.00 | $207.85 | $40.00 | $223.00 | $229.65 |
| 0055 | Litter removal (0107-1) | ACRE | 2.01 | $2,014.92 | $2,194.03 | $40.00 | $2,341.45 | $792.83 |
| 0060 | Mowing (0107-2) | ACRE | 1.34 | $3,022.39 | $3,291.05 | $40.00 | $3,344.93 | $1,189.25 |
| 0065 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $14,580 | $30,121 | $53,250 | $15,052 | $33,000 |
| 0070 | Removal of existing concrete (0110-4-10) | SY | 220 | $41.04 | $46.33 | $50.00 | $42.37 | $34.16 |
| 0075 | Regular excavation (0120-1) | CY | 32 | $51.84 | $44.72 | $25.00 | $53.52 | $378.03 |
| 0080 | Embankment (0120-6) | CY | 13.30 | $56.16 | $69.53 | $20.00 | $57.98 | $454.77 |
| 0085 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 2,204 | $17.82 | $16.58 | $18.32 | $8.92 | $7.12 |
| 0090 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 181.80 | $432.00 | $465.70 | $440.00 | $418.12 | $345.07 |
| 0095 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 88.40 | $648.00 | $577.42 | $660.00 | $925.43 | $732.50 |
| 0100 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $11,286 | $10,876 | $6,820.00 | $11,652 | $11,554 |
| 0105 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 16 | $194.40 | $247.47 | $258.00 | $200.70 | $1,049.26 |
| 0110 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 42 | $221.40 | $282.11 | $258.00 | $228.57 | $529.91 |
| 0115 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $3,240.00 | $3,067.82 | $1,150.00 | $3,344.93 | $3,047.44 |
| 0120 | Concrete curb & gutter, type E (0520-1-7) | LF | 207 | $54.00 | $54.13 | $40.00 | $55.75 | $45.45 |
| 0125 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 202 | $110.16 | $111.11 | $82.00 | $113.73 | $99.55 |
| 0130 | Detectable warnings (0527-2) | SF | 48 | $36.72 | $48.89 | $30.00 | $37.91 | $22.24 |
| 0135 | Performance turf, sod (0570-1-2) | SY | 516 | $11.61 | $15.19 | $7.50 | $11.99 | $10.19 |
| 0140 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.19 | $1,728.00 | $5,224.66 | $6,850.00 | $3,902.42 | $2,633.71 |
| 0145 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 4 | $43.20 | $195.92 | $49.50 | $50.18 | $65.84 |
| 0150 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.05 | $1,728.00 | $5,224.66 | $3,850.00 | $3,902.42 | $2,633.71 |
| 0155 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $44,000 | $44,000 | $44,000 | $44,000 | $44,000 |
| 0160 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 8 | $1,026.00 | $783.70 | $718.00 | $696.86 | $741.40 |
| 0165 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $8,547.12 | $15,021 | $9,250.00 | $8,362.32 | $7,546.37 |
| 0170 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $577.80 | $1,959.25 | $2,400.00 | $1,393.72 | $1,323.92 |
| 0175 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 1 | $2,108.16 | $2,351.10 | $1,650.00 | $1,672.46 | $2,647.85 |
| 0180 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 1 | $280.80 | $457.16 | $22.00 | $22.30 | $264.78 |
| 0185 | Raised pavement marker, type B (0706-1-3) | EACH | 30 | $7.56 | $13.06 | $5.50 | $5.58 | $11.52 |
| 0190 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,484.00 | $9,796.24 | $7,535.00 | $7,637.59 | $3,785.96 |
| 0195 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 212 | $9.72 | $7.84 | $4.50 | $4.46 | $14.81 |
| 0200 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 103 | $15.12 | $15.67 | $8.80 | $8.92 | $23.05 |
| 0205 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $129.60 | $163.27 | $72.00 | $72.48 | $197.53 |
| 0210 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 180 | $12.96 | $26.12 | $23.00 | $23.42 | $19.75 |
| 0215 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $194.40 | $326.54 | $550.00 | $557.49 | $296.29 |
| 0220 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 1 | $135.00 | $195.92 | $550.00 | $557.49 | $205.76 |
| 0225 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.19 | $8,424.00 | $13,062 | $12,650 | $12,822 | $12,839 |
| 0230 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.05 | $8,424.00 | $13,062 | $12,650 | $12,822 | $12,839 |
| 0235 | Conduit, furnish & install, open trench (0630-2-11) | LF | 60 | $11.09 | $24.12 | $32.00 | $16.95 | $44.59 |
| 0240 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,554.51 | $2,174.57 | $3,363.00 | $1,474.25 | $1,482.80 |
| 0245 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 372 | $2.16 | $4.51 | $19.50 | $1.77 | $2.28 |
| 0250 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 2 | $9,393.06 | $9,824.71 | $10,490 | $11,736 | $9,184.86 |
| 0255 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $1,296.00 | $1,370.95 | $6,202.00 | $2,568.00 | $2,647.85 |
| 0260 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 2 | $826.69 | $737.40 | $2,487.00 | $531.00 | $831.42 |
| 0265 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.19 | $3,672.00 | $4,440.96 | $4,488.00 | $3,791.00 | $5,692.88 |
| 0270 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,570.40 | $3,108.67 | $3,142.00 | $2,654.00 | $3,632.85 |
| 0275 | Conduit, furnish & install, open trench (0630-2-11) | LF | 161 | $16.55 | $44.99 | $37.00 | $22.75 | $38.92 |
| 0280 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 421 | $26.13 | $51.07 | $53.00 | $29.75 | $53.49 |
| 0285 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $7,502.52 | $9,538.53 | $18,979 | $13,485 | $10,962 |
| 0290 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 394 | $3.73 | $4.51 | $4.55 | $3.85 | $6.62 |
| 0295 | Fiber optic connection, install, splice (0633-2-31) | EACH | 4 | $50.76 | $61.39 | $62.00 | $52.41 | $65.83 |
| 0300 | Fiber optic connection, install, termination (0633-2-32) | EACH | 12 | $95.04 | $114.94 | $117.00 | $98.12 | $122.86 |
| 0305 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 1 | $1,398.60 | $1,691.48 | $1,709.00 | $1,443.89 | $1,813.25 |
| 0310 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 1 | $59.40 | $71.84 | $73.00 | $61.33 | $77.05 |
| 0315 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 1 | $91.80 | $111.02 | $112.00 | $94.77 | $119.05 |
| 0320 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 1 | $1,715.04 | $2,074.19 | $2,097.00 | $1,770.58 | $2,224.19 |
| 0325 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 1 | $101.52 | $122.78 | $124.00 | $104.81 | $131.33 |
| 0330 | Fiber optic cable locator (0633-6) | DA | 150 | $124.20 | $150.21 | $110.00 | $128.22 | $139.81 |
| 0335 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,554.51 | $1,346.00 | $2,263.00 | $1,475.00 | $1,510.33 |
| 0340 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,373.42 | $2,527.30 | $4,221.00 | $2,626.00 | $2,302.57 |
| 0345 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 1 | $4,748.12 | $4,578.76 | $6,992.00 | $5,951.00 | $4,321.29 |
| 0350 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 9 | $1,770.29 | $1,485.76 | $3,654.00 | $1,819.00 | $1,781.47 |
| 0355 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,332.96 | $4,242.69 | $5,738.00 | $5,702.00 | $4,668.69 |
| 0360 | Electrical service wire, & install (0639-2-1) | LF | 45 | $5.76 | $8.86 | $24.00 | $4.82 | $6.14 |
| 0365 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,178.88 | $2,984.85 | $3,298.00 | $1,201.00 | $2,380.95 |
| 0370 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $2,971.52 | $2,789.35 | $4,340.00 | $2,175.00 | $2,660.56 |
| 0375 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $69,985 | $91,589 | $80,815 | $106,075 | $119,863 |
| 0380 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $78,986 | $110,215 | $100,510 | $141,525 | $90,827 |
| 0385 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 8 | $1,814.95 | $1,581.44 | $2,771.00 | $1,362.00 | $1,922.34 |
| 0390 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,075.14 | $950.69 | $1,062.00 | $720.00 | $980.76 |
| 0395 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 4 | $2,383.33 | $2,143.81 | $386.00 | $2,174.00 | $2,675.39 |
| 0400 | Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160) | AS | 1 | $47,824 | $55,684 | $48,178 | $45,420 | $56,577 |
| 0405 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $7,155.00 | $5,142.89 | $3,583.00 | $7,387.00 | $9,405.16 |
| 0410 | Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14) | EACH | 1 | $15,431 | $15,711 | $9,213.00 | $8,551.00 | $12,313 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.