| 0005 | Mobilization (0101-1) | LS | 1 | $154,312 | $255,887 | $150,000 | $305,527 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $13,200 | $180,831 | $157,369 | $304,951 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,000 | $15,655 | $5,000.00 | $17,980 |
| 0020 | Traffic control officer (0102-14) | HR | 80 | $85.00 | $122.16 | $100.00 | $116.07 |
| 0025 | Work zone sign (0102-60) | ED | 8,050 | $0.59 | $0.29 | $0.35 | $0.32 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 10,500 | $0.11 | $0.13 | $0.15 | $0.14 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 47,850 | $0.10 | $0.07 | $0.05 | $0.08 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 175 | $6.00 | $6.69 | $7.50 | $7.42 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 567 | $12.00 | $12.16 | $15.00 | $13.48 |
| 0050 | Type III barricade (0102-115) | ED | 56 | $0.40 | $0.67 | $0.40 | $0.75 |
| 0055 | Sediment barrier (0104-10-3) | LF | 2,434 | $2.75 | $1.75 | $1.00 | $3.87 |
| 0060 | Inlet protection system (0104-18) | EACH | 1 | $50.00 | $203.60 | $100.00 | $225.70 |
| 0065 | Litter removal (0107-1) | ACRE | 15.04 | $65.00 | $404.13 | $100.00 | $419.85 |
| 0070 | Mowing (0107-2) | ACRE | 13.15 | $65.00 | $404.13 | $100.00 | $480.19 |
| 0075 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $2,200.00 | $2,326.86 | $5,000.00 | $7,840.53 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $87,000 | $18,980 | $75,000 | $127,988 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 79 | $49.00 | $47.79 | $38.00 | $67.43 |
| 0090 | Regular excavation (0120-1) | CY | 600 | $38.00 | $22.31 | $55.00 | $26.66 |
| 0095 | Embankment (0120-6) | CY | 409 | $20.00 | $53.25 | $30.00 | $44.42 |
| 0100 | Type B stabilization (0160-4) | SY | 1,685 | $25.00 | $44.32 | $40.00 | $39.52 |
| 0105 | Optional base, base group 01 (0285-701) | SY | 325 | $48.00 | $89.21 | $49.00 | $33.06 |
| 0110 | Optional base, base group 10 (0285-710) | SY | 1,019 | $65.00 | $81.99 | $115.00 | $60.33 |
| 0115 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,868 | $7.00 | $6.01 | $9.00 | $10.91 |
| 0120 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 2,317 | $8.00 | $6.78 | $9.00 | $5.85 |
| 0125 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 108.70 | $216.00 | $323.61 | $300.00 | $333.20 |
| 0130 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 93 | $401.00 | $479.96 | $409.00 | $474.83 |
| 0135 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 344.90 | $245.00 | $231.53 | $398.00 | $318.10 |
| 0140 | Miscellaneous asphalt (0339-1) | TN | 1.20 | $350.00 | $1,038.17 | $1,620.00 | $452.39 |
| 0145 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $8,500.00 | $8,356.55 | $21,945 | $14,087 |
| 0150 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 132 | $203.00 | $178.80 | $300.00 | $312.52 |
| 0155 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 3 | $900.00 | $4,347.90 | $7,627.00 | $4,061.48 |
| 0160 | Concrete curb & gutter, type E (0520-1-7) | LF | 339 | $30.00 | $32.81 | $88.00 | $71.44 |
| 0165 | Concrete curb & gutter, type F (0520-1-10) | LF | 133 | $30.00 | $32.81 | $88.00 | $97.14 |
| 0170 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 418 | $44.00 | $61.31 | $195.00 | $145.71 |
| 0175 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 46 | $85.00 | $109.71 | $162.00 | $175.70 |
| 0180 | Detectable warnings (0527-2) | SF | 85 | $35.00 | $37.23 | $52.00 | $50.39 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 2,788 | $4.00 | $3.23 | $15.00 | $5.58 |
| 0190 | Plastic erosion mat, TRM, type 2 (0571-1-12) | SY | 264 | $5.00 | $6.40 | $10.00 | $7.09 |
| 0195 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.20 | $2,200.00 | $2,617.71 | $3,540.00 | $2,798.73 |
| 0200 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 139 | $3.30 | $2.33 | $0.95 | $2.58 |
| 0205 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 88 | $3.30 | $2.62 | $1.00 | $3.22 |
| 0210 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 21 | $3.30 | $2.91 | $2.00 | $3.22 |
| 0215 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.02 | $1,100.00 | $814.40 | $3,564.00 | $475.26 |
| 0220 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 2 | $110.00 | $52.35 | $162.00 | $58.04 |
| 0225 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 8 | $44.00 | $52.35 | $54.00 | $58.04 |
| 0230 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.09 | $1,100.00 | $2,617.71 | $3,564.00 | $2,838.80 |
| 0235 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 70 | $3.30 | $2.62 | $1.00 | $2.90 |
| 0240 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $35,000 | $35,000 | $35,000 | $35,000 |
| 0245 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0250 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 18 | $825.00 | $756.23 | $608.00 | $838.31 |
| 0255 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $275.00 | $581.71 | $135.00 | $644.86 |
| 0260 | Single column ground sign assembly, remove (0700-1600) | EACH | 9 | $55.00 | $58.17 | $108.00 | $64.49 |
| 0265 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $11,000 | $11,053 | $13,500 | $12,252 |
| 0270 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $1,320.00 | $2,908.57 | $4,725.00 | $3,224.28 |
| 0275 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $110.00 | $232.69 | $135.00 | $257.94 |
| 0280 | Delineator, flexible tubular (0705-11-1) | EACH | 80 | $121.00 | $139.61 | $108.00 | $154.77 |
| 0285 | Raised pavement marker, type B (0706-1-3) | EACH | 274 | $6.60 | $4.94 | $6.75 | $5.48 |
| 0290 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,750.00 | $6,722.29 | $8,100.00 | $7,451.95 |
| 0295 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,750.00 | $8,958.40 | $8,100.00 | $9,930.78 |
| 0300 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 384 | $6.60 | $3.61 | $5.40 | $4.00 |
| 0305 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 88 | $11.00 | $5.41 | $6.75 | $6.00 |
| 0310 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 154 | $13.20 | $7.21 | $8.10 | $8.00 |
| 0315 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $6,600.00 | $2,908.57 | $7,128.00 | $2,590.89 |
| 0320 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $275.00 | $101.22 | $270.00 | $112.20 |
| 0325 | Thermoplastic, standard, arrow (0711-11170) | EACH | 17 | $99.00 | $59.33 | $108.00 | $65.78 |
| 0330 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 279 | $10.00 | $5.41 | $6.75 | $6.00 |
| 0335 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $6,600.00 | $2,908.57 | $7,128.00 | $2,614.32 |
| 0340 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 428 | $19.00 | $22.40 | $35.00 | $24.83 |
| 0345 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.22 | $8,800.00 | $9,108.48 | $8,200.00 | $9,726.61 |
| 0350 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.34 | $8,800.00 | $6,477.97 | $8,200.00 | $7,052.89 |
| 0355 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.06 | $12,100 | $8,637.29 | $12,500 | $9,265.97 |
| 0360 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.15 | $2,750.00 | $1,619.49 | $7,200.00 | $1,783.38 |
| 0365 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.57 | $8,800.00 | $5,952.10 | $8,200.00 | $6,528.22 |
| 0370 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 335 | $14.30 | $3.49 | $6.75 | $3.87 |
| 0375 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,151 | $16.40 | $3.14 | $3.00 | $3.48 |
| 0380 | Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32) | EACH | 5 | $3,618.00 | $3,490.29 | $3,000.00 | $3,869.13 |
| 0385 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $1,591.00 | $1,442.65 | $1,800.00 | $1,599.24 |
| 0390 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $4,324.00 | $8,144.00 | $5,000.00 | $9,027.98 |
| 0395 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,058 | $13.30 | $15.36 | $40.00 | $17.02 |
| 0400 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 732 | $71.00 | $105.76 | $95.00 | $117.23 |
| 0405 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $32,031 | $16,986 | $25,000 | $18,830 |
| 0410 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $12,021 | $11,634 | $15,000 | $12,897 |
| 0415 | Fiberglass insulator, furnish & install (0634-5-1) | LF | 60 | $141.00 | $38.39 | $55.00 | $42.56 |
| 0420 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 10 | $3,018.00 | $2,617.71 | $4,000.00 | $2,901.85 |
| 0425 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 25 | $2,090.00 | $1,489.19 | $2,750.00 | $1,650.83 |
| 0430 | Pull & splice box, F&I, per utility/agency owner (0635-2-19) | EACH | 12 | $3,017.00 | $907.47 | $2,000.00 | $1,005.98 |
| 0435 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,039.00 | $8,097.46 | $10,000 | $8,976.39 |
| 0440 | Electrical service wire, & install (0639-2-1) | LF | 95 | $17.44 | $22.57 | $20.00 | $25.02 |
| 0445 | Electrical power service- contribution in aid of construction (ciac), lee county electric CO-OP (DO not bid) (0639-8154) | LS | 1 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0450 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,171.00 | $2,163.98 | $4,000.00 | $2,398.86 |
| 0455 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $4,878.00 | $3,606.63 | $3,500.00 | $3,998.11 |
| 0460 | Steel strain pole, F&I, type PS- X (0649-1-17) | EACH | 4 | $86,872 | $103,196 | $100,000 | $114,397 |
| 0465 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 23 | $2,347.00 | $3,513.55 | $3,000.00 | $3,894.93 |
| 0470 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $892.00 | $1,454.29 | $1,200.00 | $1,612.14 |
| 0475 | Loop detector inductive, F&I, type 11, 4 CH, SS, RM (0660-1111) | EACH | 6 | $517.00 | $1,771.90 | $500.00 | $1,964.23 |
| 0480 | Loop assembly, F&I, type B (0660-2102) | AS | 12 | $3,025.00 | $1,977.83 | $1,200.00 | $2,192.51 |
| 0485 | Loop assembly, F&I, type F (0660-2106) | AS | 11 | $3,713.00 | $2,757.33 | $2,000.00 | $3,056.62 |
| 0490 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $343.00 | $604.98 | $500.00 | $670.65 |
| 0495 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 1 | $8,392.00 | $9,016.57 | $10,000 | $9,995.26 |
| 0500 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $18,732 | $16,812 | $7,500.00 | $18,636 |
| 0505 | Wireless communication system device, furnish & install (0684-6-1) | EACH | 1 | $8,294.00 | $3,548.46 | $5,000.00 | $3,933.62 |
| 0510 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $31,019 | $49,620 | $25,000 | $55,006 |
| 0515 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $3,929.00 | $3,083.09 | $1,100.00 | $3,417.74 |
| 0520 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 12 | $796.00 | $1,337.94 | $850.00 | $1,483.17 |
| 0525 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 4 | $796.00 | $2,559.54 | $1,500.00 | $2,837.37 |
| 0530 | Atc cabinet with controller, NEMA, size 7, 44"-49" W X 24"-27" D (0923-676105) | EACH | 1 | $64,438 | $126,988 | $70,000 | $140,772 |