FDOT contract T4722 bid tabulation

SR 9 (I-95) FROM S OF SR 76 (KANNER HWY) TO MARTIN... Let by Florida DOT on March 26, 2025, Martin, District 4. 4 bids received; low bid $40,833,166 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
199
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$40,833,166Low
2Ranger Construction Industries, Inc.$44,456,789+9.0%
3Ohla USA Inc$44,519,950+9.0%
4Halley Engineering Contractors, Inc.$44,965,549+10%
FDOT contract T4722: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Ranger Construction Industries, Inc.3. Ohla USA Inc4. Halley Engineering Contractors, Inc.
0005Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF944$60.00$66.30$65.00$60.00
0010Polymer nosing for bridge expansion joint (0458-2)CF128.40$875.00$1,460.00$940.00$980.00
0015Mobilization (0101-1)LS1$273,000$562,120$3,338,993$913,000
0020Mobilization (0101-1)LS1$1,110,000$2,744,475$1,112,998$2,740,000
0025Maintenance of traffic (0102-1)DA1$220,000$361,740$1,000,000$700,000
0030Maintenance of traffic (0102-1)DA1$880,000$1,761,760$1,000,000$2,033,000
0035Special detour- temporary pavement (0102-2200)SY1$27,000$15,400$1.00$1,000.00
0040Traffic control officer (0102-14)HR6,120$76.65$0.01$78.00$90.00
0045Work zone sign (0102-60)ED38,307$0.25$0.25$0.23$0.19
0050Temporary barrier, F&I, anchored (0102-71-15)LF2,928$43.00$18.00$0.01$0.01
0055Temporary barrier, F&I, free standing (0102-71-16)LF1,354$24.00$15.00$0.01$0.01
0060Temporary barrier, relocate, free standing (0102-71-26)LF1,039$8.75$5.00$0.01$0.01
0065Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,470,704$0.01$0.01$0.10$0.01
0070Arrow board / advance warning arrow panel (0102-76)ED4,959$4.35$3.50$4.20$5.00
0075Temporary crash cushion, redirective option (0102-89-1)LO7$4,565.00$1,200.00$1,275.00$0.01
0080Portable changeable message sign, temporary (0102-99)ED6,295$11.00$8.00$10.50$9.00
0085Type III barricade (0102-115)ED480$0.40$0.20$0.40$0.23
0090Portable regulatory, sign (0102-150-1)ED3,514$4.35$4.00$4.15$4.50
0095Radar speed display unit (0102-150-2)ED3,514$4.35$4.00$4.15$5.00
0100Sediment barrier (0104-10-3)LF3,876$5.85$3.00$7.15$3.50
0105Floating turbidity barrier (0104-11)LF254$12.65$15.35$15.00$15.00
0110Staked turbidity barrier- nylon reinforced PVC (0104-12)LF245$7.00$7.30$12.00$12.00
0115Inlet protection system (0104-18)EACH4$405.00$185.00$340.00$400.00
0120Litter removal (0107-1)ACRE29,857.04$1.00$0.01$23.00$0.01
0125Mowing (0107-2)ACRE22,449.81$1.00$0.01$23.00$0.01
0130Clearing & grubbing (0110-1-1)ACRE1$17,500$265,914$791,499$40,000
0135Clearing & grubbing (0110-1-1)ACRE1$1,220,000$1,297,300$919,959$130,000
0140Selective clearing and areas with trees to remain (0110-2-2)ACRE0.01$525,000$208,000$350,000$100,000
0145Removal of existing concrete (0110-4-10)SY1$4,700.00$3,220.00$6,000.00$75.00
0150Regular excavation (0120-1)CY359.50$7.50$8.00$75.00$28.00
0155Embankment (0120-6)CY1,036.20$32.00$49.40$35.00$45.00
0160Type B stabilization (0160-4)SY2,006$14.65$7.00$0.01$0.01
0165Optional base, base group 01 (0285-701)SY1,672$12.00$13.65$45.00$40.00
0170Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY65,434$3.15$3.60$2.00$4.00
0175Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY736,965$1.30$2.06$2.25$4.00
0180Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY380,496$1.05$1.54$2.25$3.20
0185Superpave asphaltic conc, traffic E (0334-1-15)TN475.30$198.00$196.40$250.00$305.00
0187Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN26,718.80$154.00$157.90$138.00$152.00
0190Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN62,817.10$138.25$143.00$138.00$152.00
0195Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN30,628.30$215.00$193.30$195.00$215.00
0200Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN5,398.20$189.00$198.40$182.00$235.00
0205Miscellaneous asphalt (0339-1)TN144.70$340.00$404.00$290.00$250.00
0210Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF16$711.00$730.50$2,300.00$2,500.00
0215Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF12$930.00$955.00$2,300.00$2,600.00
0220Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF13$1,000.00$1,110.00$2,300.00$2,700.00
0225Pipe culvert, opt material, round, 60"S/CD (0430-175160)LF13$1,200.00$1,290.00$2,300.00$3,000.00
0230Straight concrete endwalls, single, 0 degrees, round (0430-536100)EACH1$16,000$17,500$11,500$15,000
0235Straight concrete endwalls, single, 30 degrees, round (0430-536120)EACH2$17,000$18,900$11,500$15,000
0240Straight concrete endwalls, single, 0 degrees, round (0430-542100)EACH2$21,000$22,200$11,500$22,000
0245Straight concrete endwalls, single, 15 degrees, round (0430-548110)EACH2$25,200$26,500$11,500$27,000
0250Straight concrete endwalls, double, 0 degrees, round (0430-560200)EACH1$66,000$68,400$16,500$40,000
0255Median concrete barrier, 38" height (0521-1-11)LF20$1,500.00$1,480.00$1,565.00$675.00
0260Guardrail -roadway, general (0536-1-1)LF2,108$21.50$22.15$20.50$19.70
0265Guardrail- roadway, double (0536-1-3)LF587$35.00$35.85$35.00$32.00
0270Rubrail for guardrail, double sided rub rail (0536-5-2)LF587$25.00$25.50$25.00$23.00
0275Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH3$3,700.00$3,800.00$3,500.00$3,400.00
0280Guardrail removal (0536-73)LF2,633$1.15$1.15$1.10$2.00
0285Guardrail end treatment- parallel approach terminal (0536-85-24)EACH4$3,300.00$3,440.00$3,200.00$3,070.00
0290Guardrail end treatment- double face approach terminal (0536-85-27)EACH1$12,500$12,800$12,000$11,450
0295Performance turf, sod (0570-1-2)SY93,804$4.35$4.85$6.25$3.00
0300Performance turf, sod and shoulder treatment index (0570-1-3)SY4,849$6.35$7.95$10.10$8.00
0305Conduit, furnish & install, open trench (0630-2-11)LF331$28.25$28.95$16.50$21.00
0310Conduit, furnish & install, directional bore (0630-2-12)LF366$70.00$71.90$40.00$23.10
0315Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH12$1,600.00$1,650.00$1,550.00$1,231.00
0320Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$10,000$10,000$10,000$10,000
0325Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$100,000$100,000$100,000$100,000
0330Loop assembly, F&I, type B (0660-2102)AS7$1,425.00$1,470.00$4,200.00$1,800.00
0335Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH24$3,000.00$3,070.00$4,050.00$3,260.00
0340Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH24$1,550.00$1,590.00$4,000.00$2,140.00
0345Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH6$9,250.00$9,460.00$5,700.00$7,240.00
0350Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH3$600.00$611.00$1,313.00$360.00
0355Raised pavement marker, type B (0706-1-3)EACH3,353$5.50$5.60$5.50$5.00
0360Painted pavement markings, standard, white, solid, 6" (0710-11101)GM39.16$1,535.00$1,570.00$1,460.00$1,400.00
0365Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM2.79$1,750.00$1,800.00$1,650.00$1,600.00
0370Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF3,691$3.30$3.35$3.25$3.00
0375Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM69.43$876.00$989.00$850.00$800.00
0380Painted pavement markings, standard, white, arrows (0710-11170)EACH3$50.00$50.60$50.00$45.00
0385Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM34.02$1,530.00$1,570.00$1,460.00$1,400.00
0390Mcsaw, weighing, furnish and install (0770-4-15)EACH2$27,000$27,700$100,000$79,000
0395Work zone collision detection and avoidance system for operations (0924-102)LS1$140,000$28,100$20,000$15,000
0400Work zone collision detection and avoidance system for operations (0924-102)LS1$140,000$123.60$20,000$45,000
0405Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00
0410Disputes review board, meeting- DO not bid (0999-20-1)DA33$3,900.00$3,900.00$3,900.00$3,900.00
0415Disputes review board, hearing- DO not bid (0999-20-2)EACH2$4,500.00$4,500.00$4,500.00$4,500.00
0420Initial contingency amount, DO not bid (0999-25)LS1$24,975$24,975$24,975$24,975
0425Initial contingency amount, DO not bid (0999-25)LS1$125,025$125,025$125,025$125,025
0430Ground-in rumble strips, 16" (0546-72-1)GM62.08$1,400.00$1,660.00$950.00$1,530.00
0435Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH51$712.00$730.50$600.00$569.00
0440Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH87$2,735.00$2,810.00$1,750.00$1,686.00
0445Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,285.00$3,370.00$2,400.00$2,300.00
0450Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211)EACH1$4,400.00$4,490.00$2,400.00$2,313.00
0455Single column ground sign assembly, remove (0700-1600)EACH140$82.00$84.30$55.00$50.00
0460Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH4$10,000$10,700$7,250.00$7,079.00
0465Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH7$12,000$12,400$10,020$9,815.00
0470Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH10$16,500$16,900$17,000$16,526
0475Multi-column ground sign assembly, F&I ground mount, 1-300.0 SF (0700-2117)EACH3$26,000$27,000$22,500$21,807
0480Multi-column ground sign assembly, remove (0700-2600)EACH37$2,400.00$2,470.00$1,150.00$1,100.00
0485Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$438.00$449.50$310.00$300.00
0490Sign panel, furnish & install ground mount, 21-30 SF (0700-3103)EACH5$1,200.00$1,240.00$1,300.00$1,257.00
0495Sign panel, furnish & install ground mount, 51-100 SF (0700-3105)EACH1$3,800.00$3,930.00$3,400.00$3,308.00
0500Sign panel, furnish & install ground mount, 101-200 SF (0700-3106)EACH1$5,475.00$5,620.00$5,500.00$5,330.00
0505Sign panel, furnish & install ground mount, 201-300 SF (0700-3107)EACH3$7,100.00$7,300.00$10,500$10,080
0510Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH20$2,770.00$2,840.00$2,000.00$1,843.00
0515Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH3$4,350.00$4,470.00$350.00$3,400.00
0520Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH12$7,700.00$7,910.00$6,000.00$5,680.00
0525Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207)EACH5$9,500.00$9,740.00$7,000.00$6,776.00
0530Sign panel, remove, UP to 12 SF (0700-3601)EACH1$490.00$502.00$105.00$987.00
0535Sign panel, remove, 21-30 SF (0700-3603)EACH11$610.00$627.00$350.00$771.00
0540Sign panel, remove, 51-100 SF (0700-3605)EACH1$734.00$753.00$700.00$1,315.00
0545Sign panel, remove, 101-200 SF (0700-3606)EACH1$856.00$878.50$1,200.00$1,089.00
0550Sign panel, remove, 201-300 SF (0700-3607)EACH3$980.00$1,000.00$1,800.00$1,161.00
0555Sign panel, remove, 51-100 SF lighting (0700-3625)EACH2$980.00$1,000.00$2,000.00$1,742.00
0560Sign panel, remove, 101-200 SF with lighting (0700-3626)EACH4$1,100.00$1,130.00$2,150.00$1,973.00
0565Overhead static sign furnish & install, cantilever, UP to 20 FT (0700-4111)EACH2$151,000$156,000$120,000$121,898
0570Overhead static sign furnish & install, cantilever, 30 FT (0700-4112)EACH2$155,000$159,000$125,000$126,669
0575Overhead static sign furnish & install, cantilever, 40 FT (0700-4113)EACH6$167,500$173,000$140,000$142,064
0580Overhead static sign furnish & install, cantilever, 50 FT (0700-4114)EACH1$142,500$147,000$145,000$145,504
0585Overhead static sign furnish & install, span, 51-100 FT (0700-4125)EACH1$283,000$291,000$215,000$221,231
0590Overhead static sign furnish & install, span, 101-150 (0700-4126)EACH2$256,000$264,000$230,000$233,821
0595Overhead static sign deep foundation removal, cantilever (0700-4612)EACH3$19,000$20,100$13,000$12,862
0600Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH12$200.00$123.60$95.00$90.00
0605Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH6$200.00$140.50$150.00$140.00
0610Enhanced hwy sign assembly, powered, F&I ground mount, W/highlighted sign <12 SF, UP to 12 SF of static sign panels (0700-141141)EACH10$7,600.00$7,790.00$7,000.00$6,842.00
0615Enhanced highway sign AC powered, remove - ground mount (0700-141902)EACH3$990.00$1,020.00$1,500.00$1,478.00
0620Object marker, type 3 (0705-10-3)EACH4$438.00$449.50$420.00$307.00
0625Delineator, flexible tubular (0705-11-1)EACH454$104.00$106.70$100.00$105.00
0630Raised pavement marker, type B (0706-1-3)EACH12,506$5.50$5.60$5.50$5.00
0635Painted pavement markings, surface (0710-90)LS1$38,000$39,300$35,000$35,000
0640Painted pavement markings, surface (0710-90)LS1$165,000$169,000$160,000$150,000
0645Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF365$4.35$4.50$4.20$4.00
0650Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF3,744$6.50$6.75$6.50$6.00
0655Thermoplastic, standard, message or symbol (0711-11160)EACH27$250.00$252.80$235.00$225.00
0660Thermoplastic, standard, arrow (0711-11170)EACH62$99.00$101.10$94.00$90.00
0665Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF317$20.00$20.20$19.00$18.00
0670Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM33.32$6,600.00$6,740.00$6,300.00$6,000.00
0675Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM2.62$7,600.00$7,860.00$7,300.00$7,000.00
0680Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM69.27$3,800.00$3,930.00$3,650.00$3,500.00
0685Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM33.35$6,600.00$6,740.00$6,300.00$6,000.00
0690Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM4.77$6,000.00$6,170.00$5,800.00$5,500.00
0695Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.33$6,500.00$6,720.00$6,300.00$6,000.00
0700Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.26$3,800.00$3,920.00$3,700.00$3,500.00
0705Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.44$6,000.00$6,170.00$5,800.00$5,500.00
0710Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.79$33,000$33,600$32,000$30,000
0715Permanent tape, white, solid W/contrast, 8" primary line width, for concrete surfaces (0713-103122)GM0.03$34,000$34,900$48,500$45,000
0720Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.26$10,000$10,900$10,500$10,000
0725Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM1.56$11,000$11,200$10,500$10,000
0730Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.79$33,000$33,700$32,000$30,000
0735Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371)GM0.26$11,000$11,000$10,600$10,000
0740Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM1.53$11,000$11,200$10,500$10,000
0745Preformed/permanent tape, remove (0713-107)SF9,125$1.65$1.70$1.60$1.50
0750Itsfm subsurface documentation- project length (0611-1-1)MI9.37$3,200.00$3,290.00$3,045.00$3,450.00
0755Itsfm location documentation- ITS site (0611-2-2)EACH1$3,565.00$2,630.00$2,435.00$2,732.00
0760Conduit, furnish & install, open trench (0630-2-11)LF61,819$7.45$9.40$8.20$8.00
0765Conduit, furnish & install, directional bore (0630-2-12)LF5,455$35.35$36.25$45.00$19.60
0770Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH309$1,360.10$1,400.00$1,535.00$1,154.00
0775Electrical power service, F&I, underground, meter by contractor (0639-1122)AS5$4,725.00$4,850.00$2,685.00$4,014.00
0780Electrical service wire, & install (0639-2-1)LF2,330$26.00$26.70$6.50$27.70
0785Electrical service disconnect, F&I, pole mount (0639-3-11)EACH5$2,950.00$3,020.00$2,600.00$3,020.00
0790Prestressed concrete pole, type P-II service pole (0641-2-12)EACH5$4,850.00$4,970.00$2,800.00$2,490.00
0795Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF213,838$4.70$4.85$2.50$3.40
0800Lighting conductors, F&I, insulated, no 1 to no 0 (0715-1-14)LF390$6.00$6.30$5.55$15.70
0805Lighting conductors, F&I, no.1/0 3/0 (0 to 000) (0715-1-15)LF1,500$10.00$10.10$12.00$29.00
0810Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF1,500$2.00$0.20$0.55$0.80
0815Load center, F&I, secondary voltage (0715-7-11)EACH5$30,000$30,500$22,000$16,670
0820High mast light pole, furnish install, 100' (0715-19-12)EACH1$141,000$147,000$115,000$91,733
0825High mast light pole, shallow foundation removal (0715-19-62)EACH1$6,000.00$7,620.00$13,000$4,715.00
0830High mast light pole, deep foundation removal (0715-19-63)EACH1$17,000$19,000$15,000$12,220
0835Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH2$11,000$11,700$8,495.00$9,480.00
0840Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400)EACH238$11,250$11,800$8,465.00$7,800.00
0845Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442)EACH5$11,250$12,100$8,605.00$9,501.00
0850Light pole complete, remove pole and foundation (0715-69000)EACH17$735.00$1,010.00$1,500.00$472.00
0855Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH245$1,050.00$1,080.00$840.00$600.00
0860Itsfm subsurface documentation- project length (0611-1-1)MI13.33$3,200.00$3,310.00$3,260.00$3,280.00
0865Itsfm location documentation- ITS site (0611-2-2)EACH1$2,500.00$2,630.00$2,610.00$2,624.00
0870Conduit, furnish & install, open trench (0630-2-11)LF4,311$22.50$23.05$13.10$13.10
0875Conduit, furnish & install, directional bore (0630-2-12)LF4,679$35.00$36.25$44.00$44.20
0880Conduit, furnish & install, aboveground (0630-2-14)LF50$54.00$56.20$48.00$48.00
0885Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF7,455$4.75$4.95$5.00$4.90
0890Fiber optic connection, install, splice (0633-2-31)EACH74$58.00$59.60$55.00$59.00
0895Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,535.00$1,580.00$1,455.00$1,568.00
0900Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH6$64.00$66.30$61.00$65.60
0905Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH60$58.00$59.60$55.00$59.00
0910Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH5$1,400.00$1,540.00$1,420.00$1,529.00
0915Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH5$128.00$131.50$122.00$131.00
0920Telephone cable, furnish & install (0633-4-11)LF135$5.00$5.30$4.50$4.40
0925Fiber optic cable locator (0633-6)DA969$49.50$50.80$70.00$100.00
0930Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH42$1,760.00$2,020.00$1,535.00$1,540.00
0935Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH13$3,100.00$3,470.00$2,690.00$2,702.00
0940Electrical power service, F&I, underground, meter by contractor (0639-1122)AS5$4,725.00$4,850.00$3,985.00$4,011.00
0945Electrical service wire, & install (0639-2-1)LF3,771$8.85$9.10$7.80$7.70
0950Electrical service disconnect, F&I, pole mount (0639-3-11)EACH5$2,950.00$3,020.00$1,755.00$1,765.00
0955Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111)EACH4$3,900.00$4,060.00$7,250.00$7,285.00
0960Prestressed concrete pole, type P-II service pole (0641-2-12)EACH10$2,275.00$2,330.00$2,500.00$2,485.00
0965Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21)EACH3$65,000$66,600$46,500$46,761
0970Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH2$65,000$66,600$46,500$46,761
0975ITS cabinet, furnish & install, pole mount with sunshield, 334, 24" W X 66" H X 30" D (0676-2123)EACH5$16,000$16,300$12,100$12,179
0980Managed field ethernet switch, furnish & install (0684-1-1)EACH5$9,000.00$9,230.00$7,730.00$7,778.00
0985Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH5$10,000$10,100$5,920.00$5,954.00
0990Remote power management rpmu, furnish and install (0685-2-1)EACH5$2,000.00$2,130.00$725.00$728.00
FDOT contract T4722: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy