FDOT contract T4710 bid tabulation

SR 93 (I-75) FROM S ROYAL BLVD TO S SW 14TH ST. Let by Florida DOT on March 26, 2025, Broward, District 4. 2 bids received; low bid $36,200,328 by Ohla USA Inc.

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
303
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ohla USA Inc$36,200,328Low
2General Asphalt Company, LLC$41,930,767+16%
FDOT contract T4710: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ohla USA Inc2. General Asphalt Company, LLC
0005Removal of existing structures/bridges (0110-3)SF1$150,000$143,469
0010Removal of existing structures/bridges (0110-3)SF1$150,000$143,469
0015Removal of existing concrete (0110-4-10)SY1,393$130.00$60.50
0020Conc class II, bridge superstructure (0400-2-4)CY151.30$2,300.00$2,312.30
0025Concrete class II, approach slabs (0400-2-10)CY63.20$775.00$1,031.10
0030Concrete class IV, bridge substructure (0400-4-5)CY61.20$2,250.00$2,550.49
0035Bridge deck grooving (0400-7-1)SY755$35.00$14.85
0040Composite neoprene pads (0400-147)CF4$2,350.00$2,731.30
0045Reinforcing steel - bridge superstructure (0415-1-4)LB45,422$2.50$1.54
0050Reinforcing steel- bridge substructure (0415-1-5)LB12,619$2.50$1.54
0055Reinforcing steel- approach slabs (0415-1-9)LB13,249$2.50$1.54
0060Prest beams: florida-I beam 36" (0450-2-36)LF378$820.00$614.21
0065Preformed pile holes, 24" to 29" drill/punch size (0455-15-14)LF442$1,950.00$495.00
0070Preformed pile holes casing, to 29" drill/punch size (0455-15-24)LF442$1.00$132.00
0075Pile inspection, driven pile (0455-20-1)EACH16$1.00$1,039.50
0080Prestressed concrete piling, SQ (0455-34-3)LF1,315$1.00$248.69
0085Pile redrive (0455-115)EACH16$1.00$5,665.00
0090Load test (dynamic), data collection and analysis (0455-137)EACH16$1.00$2,656.50
0095Load test (dynamic), test (0455-137-2)EACH16$1.00$3,522.75
0100Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11)LF86$45.00$85.80
0105Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF302$55.00$89.10
0110Polymer nosing for bridge expansion joint (0458-2)CF197.50$700.00$985.60
0115Concrete traffic railing- 36" single-slope (0521-5-13)LF336$225.00$179.42
0120Riprap- rubble, remove existing and reinstall (0530-3-8)CY154$570.00$385.00
0125Articulating concrete block revetment system, thickness 6" (0530-4-6)SY3,679$200.00$253.00
0130Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF1,006$21.00$24.20
0135Junction box, furnish & install, embedded (0635-3-13)EACH4$1,850.00$2,200.00
0140Mobilization (0101-1)LS1$1,800,000$1,000,000
0145Mobilization (0101-1)LS1$1,800,000$1,000,000
0150Maintenance of traffic (0102-1)DA1$600,000$2,300,000
0155Maintenance of traffic (0102-1)DA1$150,000$2,300,000
0160Special detour- temporary pavement (0102-2200)SY1$0.01$387,894
0165Special detour- temporary pavement (0102-2200)SY1$0.01$66,965
0170Special detour- temporary earthwork/base (0102-2300)CY1$0.01$1,100,000
0175Special detour- temporary earthwork/base (0102-2300)CY1$0.01$175,164
0180Work zone sign (0102-60)ED61,032$0.20$0.21
0185Temporary barrier, F&I, anchored (0102-71-15)LF19,344$0.01$1.10
0190Temporary barrier, F&I, free standing (0102-71-16)LF9,456$0.01$1.10
0195Temporary barrier, relocate, anchored (0102-71-25)LF744$0.01$1.10
0200Temporary barrier, relocate, free standing (0102-71-26)LF9,264$0.01$1.10
0205Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED121,828$0.09$0.12
0210Arrow board / advance warning arrow panel (0102-76)ED4,710$5.10$4.95
0215Temporary crash cushion, redirective option (0102-89-1)LO16$725.00$1,012.00
0220Portable changeable message sign, temporary (0102-99)ED4,844$9.00$9.85
0225Temporary signalization and maintenance, intersection (0102-104)ED797$7.00$8.80
0230Temporary traffic detection and maintenance, intersection (0102-107-1)ED797$9.00$8.80
0235Existing ITS maintenance (0102-112)DA1,594$90.00$220.00
0240Type III barricade (0102-115)ED13$0.25$2.20
0245Portable regulatory, sign (0102-150-1)ED2,558$4.50$5.50
0250Radar speed display unit (0102-150-2)ED2,558$5.00$5.50
0255Sediment barrier (0104-10-3)LF27,816$2.50$0.01
0260Floating turbidity barrier (0104-11)LF1,350$13.00$14.85
0265Soil tracking prevention device (0104-15)EACH14$4,500.00$4,400.00
0270Inlet protection system (0104-18)EACH96$140.00$220.00
0275Litter removal (0107-1)ACRE1,832.11$0.01$0.01
0280Mowing (0107-2)ACRE1,273.68$0.01$0.01
0285Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$5,500.00$1.10
0290Monitor existing structures- vibration monitoring (0108-2)LS1$5,500.00$1.10
0295Clearing & grubbing (0110-1-1)ACRE1$2,500,000$539,000
0300Clearing & grubbing (0110-1-1)ACRE1$2,200,000$161,700
0305Removal of existing concrete (0110-4-10)SY190$30.00$60.50
0310Tree removal (0110-23)EACH4$1,200.00$1,650.00
0315Regular excavation (0120-1)CY24,395.70$8.50$24.53
0320Subsoil excavation (0120-4)CY10,781.90$22.00$22.22
0325Channel excavation (0120-5)CY872$520.00$287.60
0330Embankment (0120-6)CY65,881$6.50$47.08
0335Type B stabilization (0160-4)SY81,676$0.01$10.12
0340Optional base, base group 05 (0285-705)SY12,908$18.00$25.85
0345Optional base, base group 06 (0285-706)SY17,966$18.00$28.71
0350Optional base, base group 09 (0285-709)SY15,298$21.00$32.78
0355Optional base, base group 10 (0285-710)SY28,063$22.00$38.28
0360Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY151,472$2.00$1.99
0365Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY42,317$2.50$3.08
0370Superpave asphaltic conc, traffic B (0334-1-12)TN1,178.50$150.00$172.37
0375Superpave asphaltic conc, traffic C (0334-1-13)TN3,768.30$130.00$166.79
0380Superpave asphaltic conc, traffic E (0334-1-15)TN4,739.10$125.00$144.47
0385Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN1,178.50$170.00$179.36
0390Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN3,759.10$125.00$158.68
0395Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN9,839.50$180.00$193.66
0400Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN5,560.50$175.00$196.29
0405Miscellaneous asphalt (0339-1)TN621$170.00$259.09
0410Concrete class IV, culverts (0400-4-1)CY34$2,200.00$4,994.00
0415Reinforcing steel- roadway (0415-1-1)LB4,858$3.50$1.65
0420Inlets, DT bot, type H, <10' (0425-1581)EACH3$18,000$20,042
0425Inlets, gutter, type S, <10' (0425-1701)EACH3$10,500$10,549
0430Manholes, P-7, partial (0425-2-43)EACH2$6,500.00$10,032
0435Manholes, P-8, <10' (0425-2-61)EACH1$11,000$11,374
0440Pipe culvert optional material, round, 15", gutter drain (0430-173115)LF12$900.00$788.70
0445Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF19$800.00$529.10
0450Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF58$700.00$828.30
0455Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF10$900.00$1,016.40
0460Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236)LF158$750.00$392.70
0465Mitered end section, optional round, 18" CD (0430-982125)EACH1$5,500.00$5,148.00
0470Mitered end section, optional round, 24" CD (0430-982129)EACH2$7,500.00$5,203.00
0475Mitered end section, optional - elliptical / arch, 36" CD (0430-982638)EACH2$9,000.00$8,514.00
0480Mitered end section, optional round, 24" SD (0430-984129)EACH2$5,500.00$6,083.00
0485Shoulder gutter- concrete (0520-6)LF478$45.00$54.48
0490Shoulder concrete barrier, 38" or 44" height (0521-72-40)LF25$1,000.00$902.00
0495Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY88$90.00$154.00
0500Riprap, rubble, F&I, ditch lining (0530-3-4)TN11.20$250.00$263.21
0505Bedding stone (0530-74)TN12.20$1,200.00$220.00
0510Guardrail -roadway, general (0536-1-1)LF7,975$21.50$24.75
0515Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113)EACH2$3,200.00$1,534.50
0520Guardrail removal (0536-73)LF6,813$2.00$0.66
0525Guardrail end treatment- trailing anchorage (0536-85-20)EACH4$1,250.00$1,650.00
0530Guardrail end treatment- parallel approach terminal (0536-85-24)EACH10$3,000.00$3,217.50
0535Performance turf (0570-1-1)SY132,120$4.00$4.51
0540Performance turf, sod (0570-1-2)SY5,604$4.20$5.06
0545Conduit, furnish & install, open trench (0630-2-11)LF210$20.00$22.00
0550Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF75$60.00$60.50
0555Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$2,200.00$2,200.00
0560Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH22$3,400.00$3,630.00
0565Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH22$4,000.00$3,850.00
0570Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH3$5,000.00$5,500.00
0575Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH3$800.00$770.00
0580Raised pavement marker, type B (0706-1-3)EACH5,223$4.00$4.40
0585Painted pavement markings, standard, white, solid, 6" (0710-11101)GM12.21$1,300.00$1,430.00
0590Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM1.27$1,550.00$1,650.00
0595Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF24$4.00$4.40
0600Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM9.67$715.00$770.00
0605Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.01$580.00$880.00
0610Painted pavement markings, standard, white, message or symbol (0710-11160)EACH13$86.00$93.50
0615Painted pavement markings, standard, white, arrows (0710-11170)EACH22$45.00$49.50
0620Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM7.57$1,350.00$1,430.00
0625High friction surface course (0908-333100)SY3,767$35.00$39.46
0630Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00
0635Disputes review board, meeting- DO not bid (0999-20-1)DA27$3,900.00$3,900.00
0640Disputes review board, hearing- DO not bid (0999-20-2)EACH4$4,500.00$4,500.00
0645Initial contingency amount, DO not bid (0999-25)LS1$118,246$118,246
0650Initial contingency amount, DO not bid (0999-25)LS1$31,754$31,754
0655Ground-in rumble strips, 16" (0546-72-1)GM5.37$7,600.00$4,158.07
0660Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH20$515.00$544.50
0665Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH44$1,600.00$1,485.00
0670Single column ground sign assembly, relocate (0700-1500)EACH3$370.00$412.50
0675Single column ground sign assembly, remove (0700-1600)EACH67$30.00$49.50
0680Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH2$7,000.00$8,250.00
0685Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH4$9,700.00$10,175
0690Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH2$16,000$11,990
0695Multi-column ground sign assembly, relocate (0700-2500)EACH1$6,770.00$6,050.00
0700Multi-column ground sign assembly, remove (0700-2600)EACH6$1,200.00$1,155.00
0705Sign panel, furnish & install ground mount, 31-50 SF (0700-3104)EACH1$1,600.00$4,950.00
0710Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$960.00$1,925.00
0715Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH8$1,980.00$4,290.00
0720Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204)EACH1$3,000.00$5,390.00
0725Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH3$5,100.00$8,690.00
0730Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH5$8,200.00$10,450
0735Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207)EACH1$12,000$13,090
0740Sign panel, remove, UP to 12 SF (0700-3601)EACH1$100.00$275.00
0745Sign panel, remove, 12-20 SF (0700-3602)EACH6$250.00$412.50
0750Sign panel, remove, 21-30 SF (0700-3603)EACH1$350.00$440.00
0755Sign panel, remove, 51-100 SF (0700-3605)EACH2$650.00$1,320.00
0760Sign panel, remove, 101-200 SF (0700-3606)EACH7$750.00$1,650.00
0765Sign panel, remove, 201-300 SF (0700-3607)EACH1$1,250.00$1,815.00
0770Overhead static sign furnish & install, cantilever, 50 FT (0700-4114)EACH6$90,000$82,500
0775Overhead static sign furnish & install, span, 101-150 (0700-4126)EACH1$175,000$176,000
0780Overhead static sign deep foundation removal, cantilever (0700-4612)EACH4$20,000$18,700
0785Overhead static sign deep foundation removal, span (0700-4622)EACH1$30,000$27,500
0790Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH33$90.00$115.50
0795Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH18$140.00$132.00
0800Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH12$7,800.00$16,500
0805Enhanced highway sign AC powered, relocate - ground mount (0700-141802)EACH2$3,500.00$16,500
0810Delineator, non-flexible (0705-11-2)EACH191$115.00$110.00
0815Raised pavement marker, type B (0706-1-3)EACH4,897$4.00$4.40
0820Painted pavement markings, surface (0710-90)LS1$55,000$57,200
0825Painted pavement markings, surface (0710-90)LS1$20,000$19,800
0830Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.59$6,500.00$7,150.00
0835Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.06$9,000.00$11,000
0840Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF2,533$5.00$5.50
0845Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF75$10.00$11.00
0850Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.06$4,000.00$4,950.00
0855Thermoplastic, standard, message or symbol (0711-11160)EACH11$250.00$275.00
0860Thermoplastic, standard, arrow (0711-11170)EACH33$90.00$99.00
0865Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF1,728$5.00$5.50
0870Thermoplastic, preformed, white, message (0711-14160)EACH6$1,250.00$1,320.00
0875Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM4.60$6,000.00$6,380.00
0880Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM1.28$6,250.00$6,820.00
0885Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM18.60$3,000.00$3,300.00
0890Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM1.47$6,000.00$6,600.00
0895Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM4.23$6,000.00$6,380.00
0900Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.47$5,500.00$5,720.00
0905Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.85$2,600.00$2,750.00
0910Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.30$5,300.00$5,720.00
0915Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.36$30,000$33,000
0920Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102)GM0.02$34,000$44,000
0925Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.05$7,650.00$99,000
0930Permanent tape, white, 3-9 dotted, 12" wide, for concrete surfaces (0713-103173)GM0.02$14,000$17,600
0935Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.30$8,900.00$9,900.00
0940Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.18$29,000$33,000
0945Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371)GM0.02$7,600.00$9,900.00
0950Permanent tape, black, 3-9 dotted, 12" wide, for concrete surfaces (0713-103373)GM0.01$13,600$17,600
0955Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.30$9,000.00$9,900.00
0960Conduit, furnish & install, open trench (0630-2-11)LF38,254$15.00$11.00
0965Conduit, furnish & install, directional bore (0630-2-12)LF1,566$25.00$33.00
0970Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH243$1,700.00$1,650.00
0975Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$6,500.00$7,480.00
0980Electrical service wire, & install (0639-2-1)LF700$15.00$16.50
0985Electrical service disconnect, F&I, pole mount (0639-3-11)EACH3$6,000.00$6,380.00
0990Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$3,600.00$3,850.00
0995Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF609$5.00$4.40
1000Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF148,793$5.50$4.95
1005Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF106,233$0.50$0.28
1010Load center, F&I, secondary voltage (0715-7-11)EACH3$15,000$15,400
1015Load center, remove, voltage (0715-7-41)EACH4$1,200.00$1,100.00
1020Luminaire, F&I, under deck, wall mount (0715-11125)EACH10$1,000.00$1,320.00
1025Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH1$2,000.00$2,420.00
1030Luminaire, remove (0715-11500)EACH10$500.00$550.00
1035High mast light pole, shallow foundation removal (0715-19-62)EACH21$6,500.00$7,700.00
1040Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552)EACH212$9,000.00$9,900.00
1045Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 0' arm length (0715-61800)EACH5$10,000$11,000
1050Light pole complete, remove pole and foundation (0715-69000)EACH69$1,400.00$1,100.00
1055Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH214$700.00$715.00
1060Conduit, furnish & install, open trench (0630-2-11)LF2,342$30.00$27.50
1065Conduit, furnish & install, directional bore (0630-2-12)LF351$45.00$44.00
1070Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$18,000$16,500
1075Signal cable- repair/replace/other, furnish & install (0632-7-2)LF1,405$5.00$5.01
1080Signal cable, remove- intersection (0632-7-6)PI1$1,000.00$880.00
1085Signal cable, remove- outside intersection (0632-7-7)LF1,820$0.50$0.28
1090Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH53$1,800.00$1,980.00
1095Pull & splice box, F&I, 30" X 48" cover size (0635-2-15)EACH1$7,000.00$4,950.00
1100Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$8,000.00$7,480.00
1105Electrical service wire, & install (0639-2-1)LF1,720$14.00$16.50
1110Electrical service wire, (0639-2-6)LF1,720$0.50$0.28
1115Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$7,500.00$7,480.00
1120Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$5,000.00$3,850.00
1125Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH2$7,500.00$5,500.00
1130Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH1$150,000$132,000
1135Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH1$12,000$5,280.00
1140Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS4$1,500.00$1,980.00
1145Loop detector inductive, F&I, type 2 (0660-1102)EACH4$750.00$616.00
1150Loop assembly, F&I, type B (0660-2102)AS12$3,500.00$3,080.00
1155Loop assembly, F&I, type F (0660-2106)AS4$4,300.00$3,520.00
1160Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH2$13,000$12,650
1165Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$3,500.00$3,850.00
1170Vehicle detection system- remove (0660-4-60)EACH1$2,000.00$1,100.00
1175Traffic controller assembly, furnish & install model 2070 (0670-5140)AS1$75,000$60,500
1180Traffic controller assembly, relocate controller with cabinet (0670-5500)AS1$10,000$9,350.00
1185Traffic controller assembly, remove controller with (0670-5600)AS1$2,600.00$1,100.00
1190Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$900.00$990.00
1195Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH1$3,500.00$4,180.00
1200Internally illuminated sign, remove (0700-5-60)EACH1$450.00$550.00
1205Enhanced highway sign AC powered, F&I ground mount, W/2 beacons, 12-20 SF of static sign panels (0700-141122)EACH2$15,000$14,300
1210Enhanced highway sign AC powered, remove - ground mount (0700-141902)EACH2$550.00$550.00
1215Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282)EACH14$5,500.00$2,750.00
1220Itsfm subsurface documentation- project length (0611-1-1)MI6.45$4,000.00$4,180.00
1225Itsfm location documentation- ITS site (0611-2-2)EACH65$3,000.00$2,200.00
1230Conduit, furnish & install, open trench (0630-2-11)LF27,705$20.00$24.20
1235Conduit, furnish & install, directional bore (0630-2-12)LF15,593$45.00$47.30
1240Conduit, furnish & install, aboveground (0630-2-14)LF1,121$40.00$93.50
1245Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF11,818$6.00$4.40
1250Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF12,687$6.50$4.68
1255Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124)LF98,237$6.50$5.78
1260Fiber optic cable, remove, underground (0633-1620)LF77,366$2.00$1.65
1265Fiber optic connection, install, splice (0633-2-31)EACH2,280$65.00$60.50
1270Fiber optic connection, install, termination (0633-2-32)EACH390$75.00$93.50
1275Fiber optic connection hardware, F&I, splice (0633-3-11)EACH52$1,500.00$1,485.00
1280Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH144$80.00$68.20
1285Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH492$78.00$68.20
1290Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH10$1,750.00$3,080.00
1295Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH28$250.00$170.50
1300Fiber optic connection hardware, adjust/modify splice tray (0633-3-52)EACH104$25.00$22.00
1305Fiber optic connection hardware, adjust/modify patch panel (0633-3-56)EACH43$600.00$715.00
1310Fiber optic cable locator (0633-6)DA797$190.00$330.00
1315Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF1,004$6.00$6.60
1320Multi-conductor cable, furnish & install, composite (0633-8-12)LF1,302$12.00$8.25
1325Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH162$2,000.00$1,980.00
1330Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH63$3,300.00$4,400.00
1335Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH50$6,800.00$5,500.00
1340Electrical service wire, & install (0639-2-1)LF27,400$15.00$11.00
1345Electrical service wire, (0639-2-6)LF18,370$1.00$0.28
1350Electrical service disconnect, F&I, pole mount (0639-3-11)EACH37$2,000.00$5,280.00
1355Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH12$700.00$660.00
1360Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111)EACH15$5,300.00$8,800.00
1365Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121)EACH1$6,000.00$16,500
1370Electrical power service- transformer, replace, <25 kva, copper windings (0639-6201)EACH19$3,000.00$5,500.00
1375Prestressed concrete pole, type P-II service pole (0641-2-12)EACH10$2,500.00$440.00
1380Prestressed concrete pole, type P-V (0641-2-15)EACH9$15,000$15,950
1385Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH5$2,200.00$1,320.00
1390Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH8$8,500.00$5,280.00
1395Concrete CCTV pole, furnish & install with lowering device, (0641-3163)EACH4$46,000$36,300
1400Concrete CCTV pole, furnish & install with lowering device, (0641-3180)EACH4$58,000$38,500
1405Concrete CCTV pole, furnish & install with lowering device, (0641-3186)EACH1$41,000$46,200
1410Concrete CCTV pole, complete pole removal (0641-3800)EACH6$7,500.00$7,150.00
1415Vehicle detection system - microwave, relocate, above ground equipment (0660-3-42)EACH11$3,400.00$3,850.00
1420Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51)EACH11$3,500.00$2,420.00
1425Vehicle detection system - microwave, adjust & modify, above ground equipment (0660-3-52)EACH15$1,500.00$3,080.00
1430Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH3$73,000$79,200
1435ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143)EACH3$13,000$12,100
1440ITS cabinet, furnish & install, base mount with sunshield, 340 66" H X 44" W X 26" D (0676-2146)EACH1$15,000$13,860
1445ITS cabinet, relocate (0676-2400)EACH17$900.00$3,850.00
1450ITS cabinet- adjust/modify (0676-2500)EACH2$660.00$1,650.00
1455ITS cabinet- remove (0676-2600)EACH1$550.00$550.00
1460ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH8$7,000.00$8,800.00
1465ITS CCTV camera, relocate (0682-1400)EACH7$5,000.00$4,400.00
1470Managed field ethernet switch, furnish & install (0684-1-1)EACH4$5,000.00$5,390.00
1475Wireless communication device, remove (0684-6-60)EACH3$400.00$550.00
1480Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12)EACH4$7,500.00$12,100
1485Remote power management rpmu, furnish and install (0685-2-1)EACH4$850.00$660.00
1490Front access dynamic message sign, furnish & install- W/UPS, full color, 101-200 SF (0700-8136)EACH1$120,000$148,500
1495Front access dynamic message sign, remove (0700-8600)EACH1$16,500$16,500
1500Walk-in dynamic message sign, furnish & install- with UPS full color, 201-300 SF (0700-9137)EACH1$135,000$170,500
1505Walk-in dynamic message sign, remove (0700-9600)EACH1$6,500.00$13,200
1510DMS support structure, & install, span, 151-200 FT (0700-10117)EACH1$395,000$220,000
1515DMS support structure, (0700-10600)EACH1$10,000$16,500
FDOT contract T4710: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.