FDOT contract T1906 bid tabulation

SR 25 (US 27) FROM STITT RANCH TO W OF FLAGHOLE RD. Let by Florida DOT on March 26, 2025, Hendry, District 1. 6 bids received; low bid $9,321,660 by Ohla USA Inc.

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
104
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ohla USA Inc$9,321,660Low
2Pigott Asphalt and Sitework LLC$9,357,5400.0%
3C.W. Roberts Contracting, Inc.$9,450,606+1.0%
4General Asphalt Company, LLC$9,548,165+2.0%
5Ranger Construction Industries, Inc.$9,984,743+7.0%
6Ajax Paving Industries of Florida LLC$10,396,865+12%
FDOT contract T1906: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ohla USA Inc2. Pigott Asphalt and Sitework LLC3. C.W. Roberts Contracting, Inc.4. General Asphalt Company, LLC5. Ranger Construction Industries, Inc.6. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$930,000$1,000,000$650,000$990,000$975,000$950,000
0010Maintenance of traffic (0102-1)DA1$594,226$650,000$180,000$1,000,000$450,000$1,091,300
0015Traffic control officer (0102-14)HR1,000$0.01$65.00$85.75$88.00$108.60$121.09
0020Work zone sign (0102-60)ED18,025$0.23$0.20$0.30$0.27$0.22$0.30
0025Temporary barrier, F&I, anchored (0102-71-15)LF17,951$0.01$5.00$45.75$0.01$50.00$20.00
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED244,250$0.12$0.05$0.12$0.11$0.11$0.12
0035Arrow board / advance warning arrow panel (0102-76)ED500$6.09$5.00$5.85$5.45$5.72$5.77
0040Temporary crash cushion, redirective option (0102-89-1)LO10$0.01$500.00$3,400.00$910.15$6,507.00$1,268.55
0045Portable changeable message sign, temporary (0102-99)ED1,792$10.96$10.00$12.00$11.17$10.30$11.82
0050Portable regulatory, sign (0102-150-1)ED1,000$5.48$5.00$5.50$5.18$5.15$5.48
0055Radar speed display unit (0102-150-2)ED1,000$6.09$5.00$5.50$5.18$5.72$5.48
0060Removable tape, white, solid 6" (0102-913-21)GM1.35$0.01$3,500.00$15,000$13,625$14,860$14,415
0065Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.03$0.71$7,500.00$5,000.00$5,450.00$6,860.00$5,766.14
0070Removable tape, yellow, solid, (0102-913-31)GM0.05$0.94$3,500.00$14,000$13,625$14,860$14,415
0075Sediment barrier (0104-10-3)LF39,721$2.13$1.65$1.85$0.01$1.84$2.02
0080Floating turbidity barrier (0104-11)LF390$15.22$12.00$11.50$21.80$14.30$14.42
0085Inlet protection system (0104-18)EACH18$182.65$300.00$148.50$218.00$160.10$172.98
0090Litter removal (0107-1)ACRE585.65$35.31$10.00$53.75$1.10$33.15$33.44
0095Mowing (0107-2)ACRE555.38$96.19$25.00$106.25$1.10$90.30$91.10
0100Clearing & grubbing (0110-1-1)ACRE1$778,000$65,000$67,500$216,365$248,500$150,000
0105Mailbox, F&I single (0110-7-1)EACH6$365.30$350.00$350.00$545.00$514.50$144.15
0110Regular excavation (0120-1)CY1,765$55.55$36.00$27.00$96.36$47.55$46.77
0115Subsoil excavation (0120-4)CY89$134.90$50.00$76.50$54.50$102.60$113.60
0120Embankment (0120-6)CY1,695$83.13$30.00$19.00$71.72$49.15$69.67
0125Type B stabilization (0160-4)SY2,374$35.50$15.00$34.00$25.29$31.85$29.90
0130Optional base, base group 09 (0285-709)SY211$450.69$150.00$110.00$224.54$133.80$92.24
0135Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY1,028$3.91$3.00$7.50$8.69$4.45$16.37
0140Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY1,508$3.91$3.00$115.00$5.93$3.55$11.12
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY7,785$3.91$2.50$4.00$3.78$3.09$6.09
0150Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY54,074$3.91$2.50$2.00$3.53$3.78$3.62
0155Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13)SY382$3.91$5.00$14.50$16.55$3.25$26.43
0160Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15)SY29,496$3.91$2.50$2.25$4.18$4.24$2.89
0165Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17)SY25,227$3.91$2.50$3.15$5.03$4.71$4.26
0170Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY22,616$3.91$2.50$2.80$5.27$5.17$4.85
0175Superpave asphaltic conc, traffic E (0334-1-15)TN34.70$1,100.00$500.00$575.25$1,477.06$376.00$642.07
0180Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN16,095.60$135.00$178.00$181.00$148.97$155.00$168.15
0185Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN5,392.80$185.00$240.00$239.25$192.93$207.30$254.76
0190Miscellaneous asphalt (0339-1)TN1,178.20$240.00$300.00$186.50$230.35$184.40$270.41
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF8$400.00$600.00$540.00$872.00$571.50$394.25
0200Mitered end section, optional round, 18" CD (0430-982125)EACH1$6,485.49$3,000.00$4,800.00$6,343.80$5,145.00$5,461.91
0205Concrete curb & gutter, type E (0520-1-7)LF2,005$36.10$65.00$38.00$71.40$87.70$25.37
0210Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY151$89.68$150.00$116.00$183.99$160.50$54.49
0215Concrete slope pavement,non reinforced, 4" (0524-2-2)SY59$205.78$165.00$186.00$204.92$186.50$57.66
0220Riprap, rubble, F&I, ditch lining (0530-3-4)TN7.10$627.66$200.00$291.50$436.00$285.80$345.97
0225Bedding stone (0530-74)TN5.10$251.06$200.00$257.00$436.00$228.70$230.65
0230Guardrail -roadway, general (0536-1-1)LF34,800$29.19$25.00$26.50$24.10$25.30$25.00
0235Special guardrail post- post for shallow mount (0536-7-3)EACH7$213.39$100.00$194.25$185.29$194.40$196.04
0240Guardrail removal (0536-73)LF17,678$0.65$1.00$0.60$0.57$0.59$0.60
0245Guardrail end treatment- trailing anchorage (0536-85-20)EACH11$1,843.35$2,500.00$1,700.00$1,264.26$1,326.00$1,337.59
0250Guardrail end treatment- parallel approach terminal (0536-85-24)EACH12$3,846.03$3,000.00$3,500.00$2,854.51$2,994.00$3,020.10
0255Performance turf, sod (0570-1-2)SY51,077$3.62$3.00$3.35$5.29$4.27$4.11
0260Plastic erosion mat, TRM, type 2 (0571-1-12)SY436$12.79$10.00$13.00$17.44$13.50$12.11
0265Conduit, furnish & install, open trench (0630-2-11)LF196$32.15$35.00$40.50$33.35$40.60$40.94
0270Conduit, furnish & install, directional bore (0630-2-12)LF89$66.97$60.00$62.00$124.63$61.70$62.27
0275Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$1,972.61$1,750.00$2,000.00$2,358.01$2,041.00$2,058.51
0280Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$3,385.08$2,500.00$3,000.00$2,899.47$3,053.00$3,079.12
0285Traffic monitoring site inductive loop assembly, & install, 1 loop (0695-6-11)EACH10$1,887.37$2,500.00$2,300.00$2,367.86$2,255.00$2,274.17
0290Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$3,555.56$2,500.00$2,300.00$2,890.09$2,255.00$2,274.17
0295Traffic monitoring site weigh- motion electronic sensor, furnish & install, with special foundation socket (0695-9-11)EACH4$13,516$25,000$24,000$34,594$24,190$24,398
0300Raised pavement marker, type B (0706-1-3)EACH6,555$4.69$6.00$5.75$4.91$5.72$5.19
0305Painted pavement markings, standard, white, solid, 6" (0710-11101)GM19.07$2,130.45$1,500.00$1,300.00$1,744.00$1,258.00$1,845.16
0310Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM1.25$2,829.53$1,600.00$1,700.00$1,962.00$1,715.00$2,075.81
0315Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF78$2.07$3.00$2.30$3.27$2.29$3.46
0320Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF60$2.19$5.00$2.30$4.36$2.29$4.61
0325Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM17.92$608.83$750.00$577.00$1,090.00$571.50$1,153.23
0330Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.15$913.27$750.00$800.00$1,090.00$800.50$1,153.23
0335Painted pavement markings, standard, white, arrows (0710-11170)EACH148$48.71$75.00$35.00$49.05$34.30$51.90
0340Painted pavement markings, standard, white, yield line (0710-11180)LF334$7.31$5.00$5.75$16.35$5.72$17.30
0345Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM11.81$2,129.45$1,200.00$1,260.00$1,744.00$1,258.00$1,845.16
0350Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF124$2.07$3.00$2.30$3.27$2.29$3.46
0355Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM1.36$913.24$750.00$800.00$1,090.00$800.50$1,153.23
0360Initial contingency amount, DO not bid (0999-25)LS1$106,330$106,330$106,330$106,330$106,330$106,330
0365Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM10.88$3,974.73$1,800.00$2,400.00$2,293.58$2,914.00$2,404.48
0370Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH57$516.29$600.00$500.00$561.62$485.00$488.97
0375Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH16$2,177.17$1,900.00$2,000.00$1,757.34$2,044.00$2,061.97
0380Single column ground sign assembly, relocate (0700-1500)EACH1$487.05$200.00$470.00$403.56$457.50$461.29
0385Single column ground sign assembly, remove (0700-1600)EACH36$60.88$50.00$59.00$54.50$57.20$57.66
0390Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH2$6,518.11$9,000.00$6,275.00$6,913.63$6,120.00$6,173.23
0395Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH8$7,175.65$10,000$6,900.00$7,715.46$6,738.00$6,795.97
0400Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH8$8,483.41$11,500$8,200.00$10,698$7,966.00$8,034.54
0405Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH2$23,084$25,000$22,000$18,013$21,680$21,863
0410Multi-column ground sign assembly, remove (0700-2600)EACH20$1,339.42$1,500.00$1,300.00$1,090.00$1,258.00$1,268.55
0415Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH6$354.34$350.00$340.00$350.06$332.50$335.59
0420Sign panel, relocate, UP to 12 SF (0700-3501)EACH2$152.21$250.00$147.00$172.22$142.90$144.15
0425Sign panel, remove, UP to 12 SF (0700-3601)EACH6$36.53$50.00$35.00$113.36$34.30$34.60
0430Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH6$66.97$350.00$65.00$104.64$62.90$63.43
0435Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH77$91.32$150.00$88.00$141.70$85.80$86.49
0440Object marker, type 1 (0705-10-1)EACH24$249.62$250.00$240.00$365.15$234.40$236.41
0445Object marker, type 2 (0705-10-2)EACH36$110.81$200.00$107.00$226.72$104.10$104.94
0450Delineator, non-flexible (0705-11-2)EACH18$110.81$150.00$107.00$130.80$104.00$104.94
0455Raised pavement marker, type B (0706-1-3)EACH2,702$4.69$6.00$5.75$5.45$5.72$5.77
0460Painted pavement markings, standard, yellow, island nose (0710-11290)SF1,059$4.87$5.00$4.60$10.90$4.57$11.53
0465Painted pavement markings, surface (0710-90)LS1$62,531$50,000$46,000$49,050$45,730$51,895
0470Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF39$7.23$6.00$7.00$10.90$6.86$11.53
0475Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF30$9.55$8.00$8.00$16.35$8.00$17.30
0480Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.06$3,293.61$5,000.00$4,500.00$4,905.00$4,573.00$5,189.52
0485Thermoplastic, standard, arrow (0711-11170)EACH74$94.98$100.00$87.00$98.10$85.80$103.79
0490Thermoplastic, standard, yield line (0711-11180)LF167$10.96$30.00$35.00$21.80$34.30$23.06
0495Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF62$6.71$8.00$7.00$10.90$6.86$11.53
0500Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.68$3,348.54$5,000.00$4,600.00$4,905.00$4,573.00$5,189.52
0505Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM7.65$7,761.93$7,000.00$7,850.00$6,322.00$7,775.00$6,688.72
0510Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.62$10,312$8,500.00$9,200.00$7,085.00$9,147.00$7,495.98
0515Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM7.24$1,941.50$2,500.00$2,500.00$3,815.00$2,515.00$4,036.30
0520Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM5.90$7,263.26$7,500.00$7,850.00$6,322.00$7,775.00$6,688.72
FDOT contract T1906: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way