FDOT contract T3935 bid tabulation

SR 8 (I-10) FROM W OF OLSON RD TO E OF SR 10 (US 90/MAHAN... Let by Florida DOT on March 26, 2025, Leon, District 3. 3 bids received; low bid $7,306,078 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
84
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$7,306,078Low
2Anderson Columbia Co., Inc.$7,669,113+5.0%
3Peavy & Son Construction Co., Inc.$9,760,441+34%
FDOT contract T3935: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Anderson Columbia Co., Inc.3. Peavy & Son Construction Co., Inc.
0005Thrie beam panel retrofit, concrete handrail (0460-72-1)LF542$130.00$95.31$120.00
0010Mobilization (0101-1)LS1$300,000$749,691$500,000
0015Maintenance of traffic (0102-1)DA1$190,000$277,066$300,000
0020Traffic control officer (0102-14)HR2,500$98.00$100.91$80.00
0025Work zone sign (0102-60)ED17,322$0.35$0.34$0.50
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED80,621$0.10$0.05$0.15
0035Arrow board / advance warning arrow panel (0102-76)ED305$5.55$5.61$8.00
0040Portable changeable message sign, temporary (0102-99)ED574$14.00$14.02$14.00
0045Type III barricade (0102-115)ED60$0.30$0.28$10.00
0050Portable regulatory, sign (0102-150-1)ED610$5.55$5.61$10.00
0055Radar speed display unit (0102-150-2)ED610$5.55$5.61$10.00
0060Sediment barrier (0104-10-3)LF3,134$4.35$3.36$3.00
0065Inlet protection system (0104-18)EACH28$240.00$351.99$250.00
0070Litter removal (0107-1)ACRE1,996.99$60.00$61.68$80.00
0075Mowing (0107-2)ACRE1,834.09$49.00$50.46$80.00
0080Clearing & grubbing (0110-1-1)ACRE1$110,000$64,046$50,000
0085Mailbox, F&I single (0110-7-1)EACH1$320.00$280.33$500.00
0090Regular excavation (3-R projects only) (0120-71)LS1$42,000$13,700$50,000
0095Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY81,354$0.65$0.95$1.00
0100Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY85,818$2.05$1.79$1.50
0105Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY87,869$1.90$1.48$1.50
0110Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN4,706.30$120.00$126.91$140.00
0115Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN7,249.20$120.00$131.97$140.00
0120Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN9,053.40$180.00$157.46$160.00
0125Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN160.20$230.00$196.49$140.00
0130Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN2,213.50$150.00$127.73$140.00
0135Miscellaneous asphalt (0339-1)TN43.20$500.00$681.04$500.00
0140Guardrail -roadway, general/low speed TL-2 (0536-1-0)LF275$22.00$22.43$30.00
0145Guardrail -roadway, general (0536-1-1)LF1,020$28.00$28.03$30.00
0150Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH4$3,900.00$3,924.65$4,000.00
0155Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH4$3,300.00$3,363.98$3,500.00
0160Guardrail removal (0536-73)LF1,035$2.20$2.24$4.00
0165Guardrail end treatment- trailing anchorage (0536-85-20)EACH5$2,200.00$2,242.66$2,500.00
0170Guardrail end treatment- parallel approach terminal (0536-85-24)EACH5$3,300.00$3,363.98$3,500.00
0175Fencing, type R, 5.1-6.0', vertical (0550-10325)LF540$65.00$158.32$500.00
0180Performance turf, sod (0570-1-2)SY38,017$3.30$4.32$3.50
0185Raised pavement marker, type B (0706-1-3)EACH5,186$4.35$5.05$4.40
0190Painted pavement markings, standard, white, solid, 6" (0710-11101)GM23.48$1,600.00$1,569.86$1,650.00
0195Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM2.15$2,200.00$1,682.00$2,185.00
0200Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF3,049$3.80$3.36$3.85
0205Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM21.69$1,400.00$897.07$1,375.00
0210Painted pavement markings, standard, white, yield line (0710-11180)LF30$7.10$16.82$7.15
0215Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM13.14$1,600.00$1,569.86$1,650.00
0220High tension cable barrier system - length of need (0904-540-13)LF17,880$28.00$28.03$60.00
0225High tension cable barrier system - end terminal (0904-540-14)EACH8$3,900.00$3,924.65$11,000
0230High tension cable barrier system, end terminal foundation- miscellaneous drilled shaft (0904-540-15)CY64$2,800.00$2,803.33$9,000.00
0235High tension cable barrier system, concrete mow strip (0904-540-16)LF17,840$28.00$28.03$75.00
0240Work zone collision detection and avoidance system for operations (0924-102)LS1$44,000$87,996$50,000
0245Initial contingency amount, DO not bid (0999-25)LS1$105,214$105,214$105,214
0250Ground-in rumble strips, 16" (0546-72-1)GM9.75$1,600.00$1,945.18$2,000.00
0255Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH4$530.00$532.63$530.00
0260Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$2,200.00$2,242.66$1,964.00
0265Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH1$2,500.00$2,579.06$3,878.00
0270Single column ground sign assembly, remove (0700-1600)EACH7$55.00$56.07$55.00
0275Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH9$260.00$257.92$165.00
0280Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH1$470.00$476.56$297.00
0285Sign panel, furnish & install ground mount, 21-30 SF (0700-3103)EACH4$1,100.00$1,121.32$468.00
0290Sign panel, furnish & install ground mount, 31-50 SF (0700-3104)EACH1$1,700.00$1,683.45$1,018.00
0295Sign panel, furnish & install ground mount, 51-100 SF (0700-3105)EACH4$3,000.00$3,027.59$1,320.00
0300Sign panel, remove, UP to 12 SF (0700-3601)EACH9$44.00$44.85$55.00
0305Sign panel, remove, 12-20 SF (0700-3602)EACH1$100.00$100.91$55.00
0310Sign panel, remove, 21-30 SF (0700-3603)EACH4$190.00$196.23$72.00
0315Sign panel, remove, 31-50 SF (0700-3604)EACH1$280.00$280.33$195.00
0320Sign panel, remove, 51-100 SF (0700-3605)EACH4$390.00$392.47$385.00
0325Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH8$94.00$95.31$121.00
0330Object marker, type 3 (0705-10-3)EACH7$280.00$280.33$278.00
0335Delineator, flexible tubular (0705-11-1)EACH622$61.00$61.68$143.00
0340Raised pavement marker, type B (0706-1-3)EACH2,836$4.35$5.05$4.40
0345Painted pavement markings, surface (0710-90)LS1$72,000$58,533$72,149
0350Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,535$6.55$6.73$6.60
0355Thermoplastic, standard, message or symbol (0711-11160)EACH8$290.00$1,009.19$291.50
0360Thermoplastic, standard, arrow (0711-11170)EACH8$93.00$112.13$93.50
0365Thermoplastic, standard, yield line (0711-11180)LF30$22.00$22.43$22.00
0370Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM12.92$8,300.00$6,503.71$8,388.00
0375Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM1.14$11,000$7,288.65$10,930
0380Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM11.31$3,000.00$3,924.65$3,000.00
0385Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM13.14$8,100.00$6,503.71$8,190.00
0390Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF241$3.30$22.43$3.30
0395Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.39$47,000$30,837$48,125
0400Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102)GM0.07$47,000$39,247$54,038
0405Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.04$11,000$10,092$11,523
0410Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.24$12,000$10,092$11,996
0415Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.39$46,000$30,837$46,585
0420Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.28$13,000$10,092$13,750
FDOT contract T3935: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy