| 0005 | Thrie beam panel retrofit, concrete handrail (0460-72-1) | LF | 542 | $130.00 | $95.31 | $120.00 |
| 0010 | Mobilization (0101-1) | LS | 1 | $300,000 | $749,691 | $500,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $190,000 | $277,066 | $300,000 |
| 0020 | Traffic control officer (0102-14) | HR | 2,500 | $98.00 | $100.91 | $80.00 |
| 0025 | Work zone sign (0102-60) | ED | 17,322 | $0.35 | $0.34 | $0.50 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 80,621 | $0.10 | $0.05 | $0.15 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 305 | $5.55 | $5.61 | $8.00 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 574 | $14.00 | $14.02 | $14.00 |
| 0045 | Type III barricade (0102-115) | ED | 60 | $0.30 | $0.28 | $10.00 |
| 0050 | Portable regulatory, sign (0102-150-1) | ED | 610 | $5.55 | $5.61 | $10.00 |
| 0055 | Radar speed display unit (0102-150-2) | ED | 610 | $5.55 | $5.61 | $10.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 3,134 | $4.35 | $3.36 | $3.00 |
| 0065 | Inlet protection system (0104-18) | EACH | 28 | $240.00 | $351.99 | $250.00 |
| 0070 | Litter removal (0107-1) | ACRE | 1,996.99 | $60.00 | $61.68 | $80.00 |
| 0075 | Mowing (0107-2) | ACRE | 1,834.09 | $49.00 | $50.46 | $80.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $110,000 | $64,046 | $50,000 |
| 0085 | Mailbox, F&I single (0110-7-1) | EACH | 1 | $320.00 | $280.33 | $500.00 |
| 0090 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $42,000 | $13,700 | $50,000 |
| 0095 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 81,354 | $0.65 | $0.95 | $1.00 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 85,818 | $2.05 | $1.79 | $1.50 |
| 0105 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 87,869 | $1.90 | $1.48 | $1.50 |
| 0110 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 4,706.30 | $120.00 | $126.91 | $140.00 |
| 0115 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 7,249.20 | $120.00 | $131.97 | $140.00 |
| 0120 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 9,053.40 | $180.00 | $157.46 | $160.00 |
| 0125 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 160.20 | $230.00 | $196.49 | $140.00 |
| 0130 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 2,213.50 | $150.00 | $127.73 | $140.00 |
| 0135 | Miscellaneous asphalt (0339-1) | TN | 43.20 | $500.00 | $681.04 | $500.00 |
| 0140 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 275 | $22.00 | $22.43 | $30.00 |
| 0145 | Guardrail -roadway, general (0536-1-1) | LF | 1,020 | $28.00 | $28.03 | $30.00 |
| 0150 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 4 | $3,900.00 | $3,924.65 | $4,000.00 |
| 0155 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 4 | $3,300.00 | $3,363.98 | $3,500.00 |
| 0160 | Guardrail removal (0536-73) | LF | 1,035 | $2.20 | $2.24 | $4.00 |
| 0165 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 5 | $2,200.00 | $2,242.66 | $2,500.00 |
| 0170 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 5 | $3,300.00 | $3,363.98 | $3,500.00 |
| 0175 | Fencing, type R, 5.1-6.0', vertical (0550-10325) | LF | 540 | $65.00 | $158.32 | $500.00 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 38,017 | $3.30 | $4.32 | $3.50 |
| 0185 | Raised pavement marker, type B (0706-1-3) | EACH | 5,186 | $4.35 | $5.05 | $4.40 |
| 0190 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 23.48 | $1,600.00 | $1,569.86 | $1,650.00 |
| 0195 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 2.15 | $2,200.00 | $1,682.00 | $2,185.00 |
| 0200 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 3,049 | $3.80 | $3.36 | $3.85 |
| 0205 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 21.69 | $1,400.00 | $897.07 | $1,375.00 |
| 0210 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 30 | $7.10 | $16.82 | $7.15 |
| 0215 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 13.14 | $1,600.00 | $1,569.86 | $1,650.00 |
| 0220 | High tension cable barrier system - length of need (0904-540-13) | LF | 17,880 | $28.00 | $28.03 | $60.00 |
| 0225 | High tension cable barrier system - end terminal (0904-540-14) | EACH | 8 | $3,900.00 | $3,924.65 | $11,000 |
| 0230 | High tension cable barrier system, end terminal foundation- miscellaneous drilled shaft (0904-540-15) | CY | 64 | $2,800.00 | $2,803.33 | $9,000.00 |
| 0235 | High tension cable barrier system, concrete mow strip (0904-540-16) | LF | 17,840 | $28.00 | $28.03 | $75.00 |
| 0240 | Work zone collision detection and avoidance system for operations (0924-102) | LS | 1 | $44,000 | $87,996 | $50,000 |
| 0245 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $105,214 | $105,214 | $105,214 |
| 0250 | Ground-in rumble strips, 16" (0546-72-1) | GM | 9.75 | $1,600.00 | $1,945.18 | $2,000.00 |
| 0255 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $530.00 | $532.63 | $530.00 |
| 0260 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $2,200.00 | $2,242.66 | $1,964.00 |
| 0265 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 1 | $2,500.00 | $2,579.06 | $3,878.00 |
| 0270 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $55.00 | $56.07 | $55.00 |
| 0275 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 9 | $260.00 | $257.92 | $165.00 |
| 0280 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 1 | $470.00 | $476.56 | $297.00 |
| 0285 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 4 | $1,100.00 | $1,121.32 | $468.00 |
| 0290 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 1 | $1,700.00 | $1,683.45 | $1,018.00 |
| 0295 | Sign panel, furnish & install ground mount, 51-100 SF (0700-3105) | EACH | 4 | $3,000.00 | $3,027.59 | $1,320.00 |
| 0300 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 9 | $44.00 | $44.85 | $55.00 |
| 0305 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 1 | $100.00 | $100.91 | $55.00 |
| 0310 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 4 | $190.00 | $196.23 | $72.00 |
| 0315 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 1 | $280.00 | $280.33 | $195.00 |
| 0320 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 4 | $390.00 | $392.47 | $385.00 |
| 0325 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $94.00 | $95.31 | $121.00 |
| 0330 | Object marker, type 3 (0705-10-3) | EACH | 7 | $280.00 | $280.33 | $278.00 |
| 0335 | Delineator, flexible tubular (0705-11-1) | EACH | 622 | $61.00 | $61.68 | $143.00 |
| 0340 | Raised pavement marker, type B (0706-1-3) | EACH | 2,836 | $4.35 | $5.05 | $4.40 |
| 0345 | Painted pavement markings, surface (0710-90) | LS | 1 | $72,000 | $58,533 | $72,149 |
| 0350 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,535 | $6.55 | $6.73 | $6.60 |
| 0355 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 8 | $290.00 | $1,009.19 | $291.50 |
| 0360 | Thermoplastic, standard, arrow (0711-11170) | EACH | 8 | $93.00 | $112.13 | $93.50 |
| 0365 | Thermoplastic, standard, yield line (0711-11180) | LF | 30 | $22.00 | $22.43 | $22.00 |
| 0370 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 12.92 | $8,300.00 | $6,503.71 | $8,388.00 |
| 0375 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 1.14 | $11,000 | $7,288.65 | $10,930 |
| 0380 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 11.31 | $3,000.00 | $3,924.65 | $3,000.00 |
| 0385 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 13.14 | $8,100.00 | $6,503.71 | $8,190.00 |
| 0390 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 241 | $3.30 | $22.43 | $3.30 |
| 0395 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.39 | $47,000 | $30,837 | $48,125 |
| 0400 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.07 | $47,000 | $39,247 | $54,038 |
| 0405 | Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171) | GM | 0.04 | $11,000 | $10,092 | $11,523 |
| 0410 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.24 | $12,000 | $10,092 | $11,996 |
| 0415 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.39 | $46,000 | $30,837 | $46,585 |
| 0420 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.28 | $13,000 | $10,092 | $13,750 |