FDOT contract T5847 bid tabulation
SR 25 FROM N OF CR 25A TO AVE I AND FROM AVE I TO ALACHUA... Let by Florida DOT on March 26, 2025, Marion, District 5. 5 bids received; low bid $14,193,258 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 26 MAR 2025
- Pay items
- 146
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $14,193,258 | Low |
| 2 | Superior Asphalt, Inc. | $14,218,001 | 0.0% |
| 3 | C.W. Roberts Contracting, Inc. | $14,649,237 | +3.0% |
| 4 | Preferred Materials Inc. | $15,464,299 | +9.0% |
| 5 | Whitehurst, V. E. & Sons, Inc. | $16,159,605 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Superior Asphalt, Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Preferred Materials Inc. | 5. Whitehurst, V. E. & Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $536,227 | $353,000 | $658,086 | $623,667 | $930,270 |
| 0010 | Mobilization (0101-1) | LS | 1 | $470,555 | $433,390 | $609,335 | $79,062 | $857,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $153,157 | $458,525 | $514,076 | $426,832 | $650,850 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $169,789 | $488,550 | $489,597 | $315,304 | $682,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $109,611 | $19,040 | $17,000 | $37,594 | $30,000 |
| 0030 | Traffic control officer (0102-14) | HR | 5,328 | $124.74 | $45.00 | $90.00 | $100.00 | $125.00 |
| 0035 | Work zone sign (0102-60) | ED | 55,960 | $0.24 | $0.25 | $0.25 | $0.26 | $0.24 |
| 0040 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,005 | $46.33 | $48.50 | $45.00 | $42.80 | $45.15 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 145,828 | $0.11 | $0.10 | $0.10 | $0.12 | $0.09 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,012 | $0.08 | $0.10 | $0.10 | $0.06 | $0.18 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 3,485 | $5.94 | $5.40 | $5.60 | $6.68 | $4.57 |
| 0060 | Temporary crash cushion, redirective option (0102-89-1) | LO | 1 | $1,425.65 | $1,295.00 | $4,200.00 | $1,200.00 | $1,128.75 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 2,432 | $10.69 | $9.75 | $10.00 | $11.34 | $10.50 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 580 | $35.58 | $45.00 | $22.00 | $100.00 | $27.50 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 580 | $35.58 | $1.00 | $22.00 | $16.09 | $17.30 |
| 0080 | Type III barricade (0102-115) | ED | 2,320 | $0.30 | $0.28 | $0.30 | $0.33 | $0.30 |
| 0085 | Portable regulatory, sign (0102-150-1) | ED | 1,780 | $5.35 | $5.04 | $5.00 | $6.07 | $4.57 |
| 0090 | Radar speed display unit (0102-150-2) | ED | 1,780 | $5.35 | $5.04 | $5.00 | $6.74 | $4.57 |
| 0095 | Removable tape, yellow, solid, (0102-913-31) | GM | 1.76 | $19,603 | $14,040 | $13,000 | $11,500 | $17,738 |
| 0100 | Sediment barrier (0104-10-3) | LF | 2,743 | $5.82 | $1.20 | $7.50 | $3.60 | $2.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 63 | $178.21 | $135.00 | $285.00 | $140.00 | $125.00 |
| 0110 | Litter removal (0107-1) | ACRE | 1,215.88 | $41.58 | $49.85 | $25.00 | $69.19 | $80.65 |
| 0115 | Mowing (0107-2) | ACRE | 1,157.86 | $77.22 | $167.75 | $70.00 | $141.90 | $145.15 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $162,416 | $70,200 | $239,337 | $71,128 | $95,951 |
| 0125 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $159,505 | $61,340 | $190,862 | $66,128 | $83,000 |
| 0130 | Removal of existing concrete (0110-4-10) | SY | 337 | $106.43 | $25.10 | $77.00 | $26.00 | $58.05 |
| 0135 | Mailbox, F&I single (0110-7-1) | EACH | 7 | $326.71 | $346.62 | $740.00 | $350.00 | $300.00 |
| 0140 | Regular excavation (0120-1) | CY | 3,291.70 | $56.26 | $34.20 | $40.50 | $36.92 | $20.00 |
| 0145 | Subsoil excavation (0120-4) | CY | 1,337.60 | $52.17 | $22.95 | $77.50 | $38.51 | $40.00 |
| 0150 | Embankment (0120-6) | CY | 4,892.70 | $44.40 | $31.00 | $58.00 | $67.95 | $25.00 |
| 0155 | Type B stabilization (0160-4) | SY | 4,562 | $16.00 | $16.50 | $16.00 | $18.61 | $20.00 |
| 0160 | Optional base, base group 01 (0285-701) | SY | 1,202 | $11.47 | $13.50 | $24.40 | $15.66 | $18.95 |
| 0165 | Optional base, base group 06 (0285-706) | SY | 320 | $27.47 | $21.35 | $47.35 | $38.80 | $26.90 |
| 0170 | Optional base, base group 09 (0285-709) | SY | 1,987 | $24.09 | $24.60 | $32.00 | $35.09 | $29.50 |
| 0175 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 593.30 | $467.69 | $304.15 | $343.50 | $377.84 | $175.00 |
| 0180 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 12,775 | $4.95 | $5.80 | $3.90 | $5.39 | $4.20 |
| 0185 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 262 | $11.81 | $8.05 | $10.35 | $22.32 | $3.85 |
| 0190 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 33,245 | $6.71 | $5.75 | $6.70 | $4.02 | $3.35 |
| 0195 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 48,391 | $4.70 | $4.25 | $3.65 | $4.49 | $3.65 |
| 0200 | Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17) | SY | 82,823 | $4.33 | $3.80 | $3.75 | $5.24 | $4.05 |
| 0205 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 46,415 | $4.62 | $4.70 | $4.10 | $5.38 | $4.40 |
| 0210 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 35,777.40 | $140.54 | $159.95 | $142.25 | $161.33 | $157.60 |
| 0215 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 7,979.40 | $195.35 | $249.00 | $214.00 | $281.24 | $219.00 |
| 0220 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,054.70 | $170.08 | $194.55 | $175.00 | $222.80 | $166.00 |
| 0225 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 5 | $7,722.31 | $7,020.00 | $10,725 | $12,850 | $13,814 |
| 0230 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 12 | $6,653.06 | $6,050.00 | $6,250.00 | $13,950 | $14,997 |
| 0235 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 2 | $6,890.68 | $6,265.00 | $6,600.00 | $13,360 | $14,362 |
| 0240 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 3 | $6,771.87 | $6,155.00 | $7,200.00 | $18,250 | $19,619 |
| 0245 | Manholes, P-8, <10' (0425-2-61) | EACH | 1 | $6,534.26 | $5,940.00 | $16,000 | $27,944 | $30,040 |
| 0250 | Manhole, adjust (0425-5) | EACH | 5 | $1,603.86 | $1,460.00 | $1,000.00 | $1,895.00 | $2,037.00 |
| 0255 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 67 | $177.02 | $128.50 | $156.50 | $265.00 | $285.00 |
| 0260 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 30 | $211.47 | $159.85 | $180.00 | $315.00 | $339.00 |
| 0265 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,464 | $147.32 | $101.50 | $100.00 | $265.00 | $285.00 |
| 0270 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 8 | $295.83 | $236.50 | $800.00 | $695.00 | $748.00 |
| 0275 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 143 | $169.89 | $122.00 | $140.00 | $525.00 | $565.00 |
| 0280 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $2,970.13 | $2,268.00 | $3,750.00 | $3,415.00 | $3,671.00 |
| 0285 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 8 | $3,564.15 | $2,511.00 | $3,750.00 | $2,900.00 | $3,118.00 |
| 0290 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 2 | $3,534.45 | $2,675.00 | $4,250.00 | $3,250.00 | $3,494.00 |
| 0295 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $3,534.45 | $2,675.00 | $4,675.00 | $3,175.00 | $3,413.00 |
| 0300 | Concrete curb & gutter, type E (0520-1-7) | LF | 471 | $65.18 | $44.30 | $44.00 | $92.00 | $99.00 |
| 0305 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,041 | $59.30 | $55.05 | $75.00 | $84.00 | $90.30 |
| 0310 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 43 | $203.15 | $129.60 | $230.00 | $180.00 | $193.50 |
| 0315 | Shoulder gutter- concrete (0520-6) | LF | 560 | $78.99 | $46.45 | $50.00 | $99.00 | $106.50 |
| 0320 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 360 | $120.43 | $83.15 | $142.00 | $114.00 | $122.50 |
| 0325 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 267 | $124.07 | $95.00 | $213.50 | $160.00 | $172.00 |
| 0330 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 188 | $153.65 | $114.50 | $277.50 | $225.00 | $242.00 |
| 0335 | Detectable warnings (0527-2) | SF | 465 | $77.22 | $23.00 | $33.50 | $48.00 | $51.60 |
| 0340 | Performance turf, sod (0570-1-2) | SY | 71,492 | $5.97 | $4.75 | $4.75 | $3.17 | $2.70 |
| 0345 | Conduit, furnish & install, open trench (0630-2-11) | LF | 120 | $31.01 | $37.60 | $38.00 | $16.54 | $17.80 |
| 0350 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 137 | $34.07 | $49.35 | $50.00 | $40.08 | $43.10 |
| 0355 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $2,240.96 | $1,425.00 | $1,400.00 | $1,566.25 | $1,683.75 |
| 0360 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $2,907.09 | $2,555.00 | $2,600.00 | $2,605.48 | $2,800.00 |
| 0365 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,517.54 | $2,100.00 | $2,100.00 | $2,523.19 | $2,712.50 |
| 0370 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 2 | $9,786.62 | $7,275.00 | $7,500.00 | $7,407.82 | $7,964.00 |
| 0375 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 2 | $1,116.87 | $1,490.00 | $1,500.00 | $1,340.70 | $1,441.25 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 4,217 | $6.12 | $5.40 | $4.50 | $5.50 | $5.55 |
| 0385 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 11.41 | $2,138.49 | $1,188.00 | $1,475.00 | $1,755.00 | $1,935.00 |
| 0390 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 619 | $2.38 | $2.15 | $1.15 | $2.50 | $2.15 |
| 0395 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 279 | $3.56 | $2.70 | $2.20 | $3.00 | $3.23 |
| 0400 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 11.44 | $1,128.65 | $540.00 | $725.00 | $465.00 | $1,021.25 |
| 0405 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.79 | $2,138.49 | $1,188.00 | $1,475.00 | $1,755.00 | $1,935.00 |
| 0410 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 2.01 | $1,366.25 | $648.00 | $722.50 | $815.00 | $1,237.00 |
| 0415 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $74,000 | $74,000 | $74,000 | $74,000 | $74,000 |
| 0420 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $75,000 | $75,000 | $75,000 | $75,000 | $75,000 |
| 0425 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 18.98 | $2,494.90 | $1,242.00 | $1,560.00 | $1,750.00 | $2,365.00 |
| 0430 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 56 | $1,201.23 | $476.30 | $490.00 | $441.00 | $697.00 |
| 0435 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 6 | $1,777.44 | $1,910.00 | $1,975.00 | $1,766.00 | $2,615.50 |
| 0440 | Single column ground sign assembly, remove (0700-1600) | EACH | 18 | $279.22 | $54.00 | $55.00 | $50.00 | $53.75 |
| 0445 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 3 | $8,250.77 | $5,860.00 | $6,000.00 | $5,426.00 | $9,264.00 |
| 0450 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 7 | $1,396.09 | $1,190.00 | $1,225.00 | $1,100.00 | $210.00 |
| 0455 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 8 | $459.91 | $162.00 | $165.00 | $150.00 | $88.15 |
| 0460 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $139.61 | $32.40 | $33.50 | $30.00 | $32.25 |
| 0465 | Enhanced highway sign AC powered, remove - ground mount (0700-141902) | EACH | 1 | $1,675.31 | $865.00 | $895.00 | $800.00 | $731.00 |
| 0470 | Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111) | EACH | 1 | $15,856 | $8,125.00 | $8,395.00 | $7,521.00 | $9,971.00 |
| 0475 | Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140) | EACH | 4 | $14,739 | $8,830.00 | $9,125.00 | $8,177.00 | $8,690.00 |
| 0480 | Tubular marker, 36" yellow (0704-1-4) | EACH | 83 | $267.31 | $243.00 | $285.00 | $225.00 | $209.00 |
| 0485 | Object marker, type 1 (0705-10-1) | EACH | 1 | $1,188.05 | $226.80 | $235.00 | $210.00 | $303.00 |
| 0490 | Raised pavement marker, type B (0706-1-3) | EACH | 5,232 | $6.24 | $5.40 | $4.50 | $5.50 | $5.65 |
| 0495 | Painted pavement markings, surface (0710-90) | LS | 1 | $40,394 | $37,800 | $25,000 | $41,500 | $36,550 |
| 0500 | Painted pavement markings, surface (0710-90) | LS | 1 | $40,394 | $37,800 | $25,000 | $41,500 | $36,550 |
| 0505 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,162 | $5.35 | $5.40 | $5.00 | $4.00 | $4.85 |
| 0510 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 466 | $6.53 | $6.50 | $8.70 | $6.00 | $5.91 |
| 0515 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 441 | $10.39 | $7.55 | $11.60 | $10.00 | $9.41 |
| 0520 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.24 | $3,267.12 | $4,320.00 | $1,900.00 | $3,300.00 | $2,956.25 |
| 0525 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 1 | $386.11 | $324.00 | $360.00 | $195.00 | $349.40 |
| 0530 | Thermoplastic, standard, arrow (0711-11170) | EACH | 49 | $130.69 | $86.40 | $110.00 | $150.00 | $118.25 |
| 0535 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 480 | $6.53 | $6.50 | $6.50 | $6.00 | $5.91 |
| 0540 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 2.04 | $3,267.13 | $4,320.00 | $1,900.00 | $3,300.00 | $2,956.25 |
| 0545 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 11.51 | $7,383.72 | $7,560.00 | $7,600.00 | $4,500.00 | $6,682.00 |
| 0550 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.19 | $11,631 | $9,720.00 | $9,475.00 | $22,000 | $10,525 |
| 0555 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 11.44 | $2,316.69 | $2,376.00 | $1,900.00 | $1,540.00 | $2,097.00 |
| 0560 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 9.66 | $7,383.72 | $7,560.00 | $7,600.00 | $4,500.00 | $6,682.00 |
| 0565 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.76 | $6,534.26 | $7,560.00 | $5,800.00 | $3,650.00 | $5,913.00 |
| 0570 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.80 | $2,079.08 | $2,376.00 | $1,450.00 | $1,300.00 | $1,882.00 |
| 0575 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.92 | $6,534.26 | $7,560.00 | $5,800.00 | $3,650.00 | $5,913.00 |
| 0580 | Conduit, furnish & install, open trench (0630-2-11) | LF | 13 | $15.62 | $31.00 | $32.00 | $16.54 | $17.80 |
| 0585 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 310 | $20.96 | $38.25 | $39.50 | $40.08 | $43.10 |
| 0590 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 60 | $70.10 | $79.00 | $81.50 | $42.00 | $45.15 |
| 0595 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,733.69 | $2,535.00 | $2,600.00 | $1,566.25 | $1,684.00 |
| 0600 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 5 | $1,949.26 | $2,255.00 | $2,300.00 | $4,845.51 | $5,209.00 |
| 0605 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,324.70 | $1,935.00 | $2,000.00 | $2,636.93 | $2,834.70 |
| 0610 | Conduit, furnish & install, open trench (0630-2-11) | LF | 144 | $22.86 | $22.00 | $23.00 | $16.54 | $17.80 |
| 0615 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 310 | $31.91 | $38.25 | $39.50 | $40.08 | $43.10 |
| 0620 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 90 | $70.10 | $79.00 | $81.50 | $42.00 | $45.15 |
| 0625 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $12,109 | $14,430 | $14,900 | $12,193 | $13,110 |
| 0630 | Span wire assembly, F&I, two point, diagonal (0634-4152) | PI | 1 | $13,921 | $5,610.00 | $5,795.00 | $7,608.59 | $8,180.00 |
| 0635 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $2,090.15 | $1,425.00 | $1,473.00 | $1,566.25 | $1,684.00 |
| 0640 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,464.77 | $6,695.00 | $6,900.00 | $5,188.72 | $5,578.00 |
| 0645 | Electrical service wire, & install (0639-2-1) | LF | 131 | $6.91 | $9.25 | $9.50 | $9.90 | $10.65 |
| 0650 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,908.56 | $2,160.00 | $2,225.00 | $2,706.72 | $2,910.00 |
| 0655 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,433.24 | $3,065.00 | $3,100.00 | $2,592.82 | $2,788.00 |
| 0660 | Prestressed concrete pole, type P-VIII (0641-2-18) | EACH | 2 | $24,899 | $36,850 | $38,000 | $29,924 | $32,169 |
| 0665 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $18,736 | $15,195 | $15,700 | $8,233.43 | $8,851.00 |
| 0670 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 4 | $1,906.22 | $1,750.00 | $1,800.00 | $1,116.68 | $1,200.50 |
| 0675 | Vehicular traffic signal, furnish & install aluminum, 1 section, 2-4 way (0650-1-12) | AS | 2 | $2,920.65 | $2,420.00 | $2,475.00 | $2,970.00 | $3,193.00 |
| 0680 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 10 | $1,077.93 | $705.00 | $725.00 | $688.68 | $740.50 |
| 0685 | Mounting assembly, repair/replace/retro- furnish & install, mast arm mounting assembly (0659-1101) | EACH | 6 | $9,952.03 | $740.00 | $765.00 | $2,109.52 | $2,268.00 |
| 0690 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 2 | $23,222 | $24,085 | $24,000 | $14,894 | $16,011 |
| 0695 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 6 | $14,625 | $12,170 | $12,500 | $7,113.86 | $7,648.00 |
| 0700 | Traffic controller assembly, relocate controller with cabinet (0670-5500) | AS | 1 | $8,388.28 | $10,225 | $10,000 | $9,022.99 | $9,700.00 |
| 0705 | Traffic controller, modify (0671-2-40) | EACH | 1 | $4,454.96 | $2,285.00 | $2,300.00 | $3,384.30 | $3,638.00 |
| 0710 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $6,436.87 | $5,685.00 | $5,800.00 | $5,984.88 | $6,434.00 |
| 0715 | Managed field ethernet switch, remove- cabinet to remain (0684-1-6) | EACH | 1 | $377.02 | $275.00 | $285.00 | $270.23 | $290.50 |
| 0720 | Media converter, furnish & install (0684-5-1) | EACH | 2 | $2,536.36 | $1,290.00 | $1,300.00 | $1,880.56 | $2,022.00 |
| 0725 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $977.50 | $1,770.00 | $1,800.00 | $1,197.75 | $1,288.00 |
| 0730 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 4 | $4,011.60 | $2,666.52 | $2,750.00 | $4,845.51 | $5,210.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.