FDOT contract T1910 bid tabulation

SR 55 (US 19) AND SR 684 FROM 23RD AVE W TO 39TH ST E, FR... Let by Florida DOT on March 26, 2025, Manatee, District 1. 3 bids received; low bid $14,661,723 by Preferred Materials Inc..

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
214
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$14,661,723Low
2Superior Asphalt, Inc.$16,793,498+15%
3Ajax Paving Industries of Florida LLC$19,732,763+35%
FDOT contract T1910: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Superior Asphalt, Inc.3. Ajax Paving Industries of Florida LLC
0005Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF383$62.13$90.00$94.77
0010Polymer nosing for bridge expansion joint (0458-2)CF53.80$884.55$1,000.00$1,055.13
0015Mobilization (0101-1)LS1$510,000$765,000$1,000,000
0020Mobilization (0101-1)LS1$40,000$71,595$50,000
0025Mobilization (0101-1)LS1$30,000$210,000$50,000
0030Maintenance of traffic (0102-1)DA1$470,000$565,000$1,200,000
0035Maintenance of traffic (0102-1)DA1$50,000$42,500$52,500
0040Maintenance of traffic (0102-1)DA1$50,000$194,250$52,500
0045Traffic control officer (0102-14)HR1,736$84.24$112.00$123.84
0050Work zone sign (0102-60)ED215,004$0.20$0.25$0.24
0055Temporary barrier, F&I, low profile, concrete (0102-71-13)LF599$42.12$47.00$50.54
0060Temporary barrier, F&I, free standing (0102-71-16)LF2,097$23.17$26.00$27.80
0065Temporary barrier, relocate, free standing (0102-71-26)LF855$8.42$9.50$10.11
0070Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,599,173$0.09$0.10$0.11
0075Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD18,800$0.05$0.10$0.06
0080Arrow board / advance warning arrow panel (0102-76)ED9,540$5.27$5.90$6.32
0085Temporary crash cushion, redirective option (0102-89-1)LO5$1,026.71$1,300.00$1,377.35
0090Portable changeable message sign, temporary (0102-99)ED5,521$9.48$10.60$11.37
0091Temporary signalization and maintenance, intersection (0102-104)ED4,000$10.53$12.00$12.63
0092Temporary traffic detection and maintenance, intersection (0102-107-1)ED4,000$10.53$12.00$12.63
0095Type III barricade (0102-115)ED13,568$0.24$0.30$0.29
0100Sediment barrier (0104-10-3)LF13,181$1.84$3.50$1.07
0105Inlet protection system (0104-18)EACH132$157.96$220.00$246.41
0110Litter removal (0107-1)ACRE1,042.05$63.18$35.00$94.77
0115Mowing (0107-2)ACRE815.44$89.51$40.00$94.77
0120Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$8,521.49$6,000.00$31,843
0125Monitor existing structures- vibration monitoring (0108-2)LS1$8,521.49$6,000.00$6,823.61
0130Clearing & grubbing (0110-1-1)ACRE1$326,618$189,300$100,000
0135Clearing & grubbing (0110-1-1)ACRE1$163,238$12,250$50,000
0140Removal of existing concrete (0110-4-10)SY774$102.09$59.00$65.00
0145Regular excavation (0120-1)CY10$116.29$565.00$675.91
0150Borrow excavation, truck measure (0120-2-2)CY4,631.90$62.27$50.00$75.00
0155Embankment (0120-6)CY40$116.29$215.50$560.00
0160Regular excavation (3-R projects only) (0120-71)LS1$8,442.85$150,500$50,000
0165Type B stabilization (0160-4)SY318$97.69$100.00$75.00
0170Optional base, base group 09 (0285-709)SY139$127.81$113.50$250.00
0175Optional base, base group 11 (0285-711)SY10$141.98$580.00$255.00
0180Optional base, base group 12 (0285-712)SY136$141.17$125.00$260.00
0185Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY147,541$2.78$4.90$6.10
0190Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY1,291$7.27$27.35$10.15
0195Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY31,980$4.22$12.45$8.80
0200Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY2,438$7.74$5.80$6.15
0205Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY29,514$3.44$5.40$4.65
0210Superpave asphaltic conc, traffic B (0334-1-12)TN1.10$2,636.58$3,000.00$1,740.00
0215Superpave asphaltic conc, traffic C (0334-1-13)TN2,217.30$130.84$147.50$160.00
0220Superpave asphaltic concrete, traffic C, high polymer (0334-1-57)TN1,232.90$217.82$225.00$275.00
0225Superpave asphaltic concrete, traffic E, high polymer (0334-1-59)TN19,394.70$213.12$223.50$265.00
0230Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN468.40$252.73$277.00$320.00
0235Asphalt concrete friction course, inc bit, FC-5, high polymer (0337-7-26)TN813.70$271.45$305.00$350.00
0240Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN422$199.15$238.00$250.00
0245Asphalt concrete friction course,traffic C, FC-12.5, high polymer (0337-7-93)TN881$215.72$215.00$315.00
0250Asphalt concrete friction course,traffic E, FC-12.5, high polymer (0337-7-95)TN12,431.20$213.12$216.00$298.00
0255Miscellaneous asphalt (0339-1)TN87.80$477.03$535.00$920.47
0260Inlets, curb, type P-4, partial (0425-1345)EACH1$12,574$19,500$20,712
0265Inlets, curb, type 7, partial (0425-1475)EACH2$9,586.08$9,500.00$10,042
0270Manholes, J-7, <10' (0425-2-71)EACH1$25,299$31,650$33,767
0275Manhole, adjust (0425-5)EACH17$1,636.59$4,825.00$5,146.72
0280Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF8$325.17$1,250.00$1,336.89
0285Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF49$418.63$860.00$916.37
0290Pipe culvert,optional material,other-elip/arch, (0430-175218)LF7$367.23$200.00$213.40
0295Pipe liner, cured in place, 18" (0431-1118)LF40$526.52$350.00$753.00
0300Concrete curb & gutter, type E (0520-1-7)LF258$50.94$72.00$33.26
0305Concrete curb & gutter, type F (0520-1-10)LF938$50.05$61.50$33.26
0310Concrete curb, type B (0520-2-2)LF2,043$41.13$42.50$24.85
0315Concrete curb, type D (0520-2-4)LF64$48.12$96.00$24.99
0320Traffic separator concrete- type I, 4' wide (0520-5-11)LF7$140.85$480.00$187.85
0325Traffic separator concrete- type I, 6' wide (0520-5-12)LF35$182.56$195.00$192.66
0330Concrete traffic separator, special- variable width (0520-70)SY229$151.79$155.00$164.50
0335Concrete sidewalk and driveways, 4" thick (0522-1)SY209$88.27$137.00$60.08
0340Concrete sidewalk and driveways, 6" thick (0522-2)SY257$125.61$195.00$87.25
0345Detectable warnings (0527-2)SF377$30.96$75.50$75.00
0350Guardrail -roadway, general (0536-1-1)LF566$22.90$23.50$27.48
0355Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH6$312.89$650.00$375.46
0360Special guardrail post- post for shallow mount (0536-7-3)EACH3$111.01$470.00$133.21
0365Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112)EACH1$3,114.04$4,650.00$3,736.79
0370Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH4$3,604.52$5,085.00$4,325.35
0375Guardrail removal (0536-73)LF236$2.23$3.25$2.67
0380Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$1,408.07$1,875.00$1,689.66
0385Guardrail end treatment- parallel approach terminal (0536-85-24)EACH5$3,288.19$3,650.00$3,945.78
0390Guardrail reset (0538-1)LF1,807$13.68$16.50$16.41
0395Performance turf, sod (0570-1-2)SY10,565$4.52$9.45$7.65
0400Delineator, replace delineator on existing barrier (0705-11-6)EACH46$210.61$175.00$252.72
0405Raised pavement marker, type B (0706-1-3)EACH4,360$4.32$5.90$6.32
0410Painted pavement markings, standard, white, solid, 6" (0710-11101)GM11.89$2,105.55$2,350.00$2,527.26
0415Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.90$2,592.08$3,500.00$3,790.89
0420Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF6,676$1.68$4.75$5.06
0425Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF1,851$1.79$4.75$5.06
0430Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,645$1.90$4.75$5.06
0435Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM10.55$526.17$1,200.00$1,263.63
0440Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.12$990.00$2,350.00$2,527.26
0445Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.10$715.63$2,350.00$2,527.26
0450Painted pavement markings, standard, white, message or symbol (0710-11160)EACH53$42.12$140.00$151.64
0455Painted pavement markings, standard, white, arrows (0710-11170)EACH257$36.86$70.00$75.82
0460Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM9.37$2,104.06$2,500.00$2,653.62
0465Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF485$1.79$4.75$5.06
0470Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.37$735.15$1,200.00$1,263.63
0475Initial contingency amount, DO not bid (0999-25)LS1$100,000$100,000$100,000
0480Initial contingency amount, DO not bid (0999-25)LS1$25,000$25,000$25,000
0485Initial contingency amount, DO not bid (0999-25)LS1$25,000$25,000$25,000
0490Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM3.38$11,257$5,000.00$2,969.53
0495Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH168$409.63$460.00$619.17
0500Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH41$1,755.42$1,950.00$2,274.54
0505Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH4$2,077.65$2,350.00$3,285.44
0510Single column ground sign assembly, remove (0700-1600)EACH190$52.65$60.00$37.91
0515Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH5$3,339.19$3,800.00$2,779.98
0520Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH3$3,668.80$4,100.00$3,538.16
0525Single column ground sign assembly, F&I cantilever mount, 30.1+ SF (0700-1914)EACH3$3,933.11$4,400.00$4,422.71
0530Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112)EACH2$4,577.57$5,200.00$5,218.79
0535Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH7$4,871.37$5,450.00$5,559.97
0540Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH2$5,714.86$6,400.00$9,540.40
0545Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH1$6,979.55$7,800.00$10,716
0550Multi-column ground sign assembly, remove (0700-2600)EACH11$842.43$950.00$758.18
0555Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH2$1,913.38$2,150.00$2,211.35
0560Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH3$6,810.01$7,600.00$17,691
0565Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH1$10,412$11,700$22,114
0570Sign panel, relocate, UP to 12 SF (0700-3501)EACH28$115.83$130.00$63.19
0575Sign panel, remove, 12-20 SF (0700-3602)EACH2$52.65$59.00$31.59
0580Sign panel, remove, 51-100 SF (0700-3605)EACH3$315.91$350.00$31.59
0585Overhead static sign furnish & install, cantilever, 40 FT (0700-4113)EACH1$135,749$151,600$145,317
0590Overhead static sign shallow foundation removal, cantilever (0700-4611)EACH1$9,477.36$10,600$16,427
0595Enhanced highway sign AC powered, F&I overhead W/2 beacons, 31-50 SF of static sign panels (0700-141324)EACH1$10,401$11,650$12,636
0600Enhanced highway sign AC powered, remove - overhead mount (0700-141903)EACH1$1,895.47$2,150.00$2,211.35
0605Enhanced highway sign solar powered, F&I ground mount, W/beacon, 12-20 SF of static sign panels (0700-142112)EACH7$15,532$17,350$15,795
0610Tubular marker, 36" yellow (0704-1-4)EACH32$252.73$285.00$31.59
0615Object marker, type 1 (0705-10-1)EACH10$221.14$250.00$252.72
0620Object marker, type 3 (0705-10-3)EACH9$189.55$210.00$252.72
0625Delineator, flexible tubular (0705-11-1)EACH25$100.04$112.00$252.72
0630Raised pavement marker, type B (0706-1-3)EACH4,497$4.32$5.90$6.32
0635Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF385$4.21$12.00$12.63
0640Painted pavement markings, surface (0710-90)LS1$130,225$105,850$113,727
0645Painted pavement markings, surface (0710-90)LS1$15,434$11,750$12,636
0650Painted pavement markings, surface (0710-90)LS1$10,004$7,050.00$7,581.78
0655Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF6,676$3.18$5.90$6.32
0660Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,851$4.78$7.00$7.58
0665Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,644$6.36$8.25$8.85
0670Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.13$2,455.80$5,000.00$5,054.52
0675Thermoplastic, standard, message or symbol (0711-11160)EACH50$87.40$205.00$221.14
0680Thermoplastic, standard, arrow (0711-11170)EACH254$61.08$94.00$101.10
0685Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF483$4.44$7.00$7.58
0690Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.41$2,420.17$4,700.00$5,054.52
0695Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,110$16.13$17.65$18.95
0700Thermoplastic, preformed, white, message (0711-14160)EACH7$203.24$294.00$315.91
0705Thermoplastic, preformed, white, arrow (0711-14170)EACH7$86.35$177.00$189.55
0710Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM1.65$7,348.88$8,250.00$8,845.41
0715Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.25$9,474.82$10,600$11,373
0720Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM2.11$1,834.96$2,500.00$2,653.62
0725Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM1.45$7,361.13$8,250.00$8,845.41
0730Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM10.46$5,263.69$7,300.00$7,834.51
0735Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.67$6,978.95$8,800.00$9,477.23
0740Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM8.60$1,315.23$2,350.00$2,527.26
0745Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.12$2,475.04$5,900.00$6,318.15
0750Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM8.14$4,576.93$7,300.00$7,834.51
0755Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.94$29,662$30,500$32,854
0760Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.90$7,421.47$14,100$15,164
0765Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.91$29,884$30,500$32,854
0770Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.90$7,421.47$14,100$15,164
0775Preformed/permanent tape, remove (0713-107)SF7,256$1.47$2.35$2.52
0780Conduit, furnish & install, open trench (0630-2-11)LF169$21.06$23.50$25.28
0785Conduit, furnish & install, directional bore (0630-2-12)LF163$21.06$23.50$25.28
0790Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH11$1,263.65$1,415.00$1,516.36
0795Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,524$2.11$2.35$2.52
0800Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF864$2.37$2.65$2.85
0805Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH21$1,368.95$1,530.00$1,642.72
0810Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211)EACH2$10,267$11,500$12,320
0815Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252)EACH3$10,372$11,600$12,447
0820Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311)EACH1$10,530$11,760$12,636
0825Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH1$12,110$13,525$14,532
0830Light pole complete, remove pole and foundation (0715-69000)EACH1$947.74$1,060.00$1,137.26
0835Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH7$947.74$1,060.00$1,137.26
0840Itsfm location documentation- intersection (0611-2-1)EACH1$2,895.86$3,250.00$3,474.99
0845Conduit, furnish & install, open trench (0630-2-11)LF2,087$14.22$16.00$17.06
0850Conduit, furnish & install, directional bore (0630-2-12)LF2,436$26.33$29.50$31.59
0855Conduit, furnish & install, split duct (0630-2-18)LF25$52.65$59.00$63.19
0860Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$14,479$16,250$17,375
0865Signal cable- repair/replace/other, furnish & install (0632-7-2)LF702$1.58$2.00$1.89
0870Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF503$4.21$5.00$5.06
0875Fiber optic connection, install, splice (0633-2-31)EACH16$52.65$60.00$63.19
0880Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH2$57.92$65.00$69.50
0885Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH12$63.18$70.00$75.82
0890Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,395.28$1,600.00$1,674.31
0895Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH1$921.41$1,100.00$1,105.68
0900Fiber optic cable locator (0633-6)DA500$157.96$176.50$189.55
0905Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH64$1,632.21$1,825.00$1,958.63
0910Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$3,001.17$3,250.00$3,601.35
0915Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH3$1,895.47$2,100.00$2,274.54
0920Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$3,685.65$4,100.00$4,422.71
0925Electrical service wire, & install (0639-2-1)LF244$11.58$13.00$13.90
0930Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$1,263.65$1,400.00$1,516.36
0935Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,264.04$2,525.00$2,716.81
0940Aluminum signals pole, (0646-1-11)EACH9$2,106.08$2,350.00$2,527.26
0945Aluminum signals pole, remove (0646-1-60)EACH1$473.86$530.00$568.63
0950Steel mast arm assembly, and install, double arm 78'-40' (0649-21-23)EACH1$142,161$158,750$170,590
0955Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS7$1,895.47$2,115.00$2,274.54
0960Vehicular traffic signal, furnish & install 3 section, 2-4 ways (0650-1-35)AS1$3,159.12$3,230.00$3,790.89
0965Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS1$2,421.99$2,700.00$2,906.35
0970Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$1,000.39$1,120.00$1,200.45
0975Loop detector inductive, F&I, type 9 (0660-1109)EACH22$394.89$440.00$473.86
0980Loop assembly, F&I, type B (0660-2102)AS82$1,842.82$2,060.00$2,211.35
0985Loop assembly, F&I, type F (0660-2106)AS25$2,106.08$2,350.00$2,527.26
0990Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$12,110$13,525$14,532
0995Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH5$12,110$13,525$14,532
1000Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$8,950.84$10,000$10,741
1005Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH2$6,160.29$6,880.00$7,392.24
1010Pedestrian detector, furnish & install, standard (0665-1-11)EACH2$500.20$560.00$600.23
1015Pedestrian detector, furnish & install, accessible (0665-1-12)EACH6$2,053.43$2,295.00$2,464.08
1020Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111)AS1$57,917$64,500$69,500
1025Traffic controller, modify (0671-2-40)EACH8$1,053.04$1,175.00$1,263.63
1030Traffic signal controller cabinet, adjust/modify (0676-1500)EACH7$3,685.64$4,115.00$4,422.71
1035ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH1$8,161.06$9,115.00$9,793.14
1040Managed field ethernet switch, furnish & install (0684-1-1)EACH1$6,054.99$6,750.00$7,265.88
1045Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$9,424.72$10,500$11,310
1050Remote power management rpmu, furnish and install (0685-2-1)EACH1$900.35$1,000.00$1,080.41
1055Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH1$1,105.70$1,235.00$1,326.81
1060Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH2$9,477.37$10,000$11,373
FDOT contract T1910: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy