FDOT contract T9042 bid tabulation

SR 47 (US 441) AT LAKE CITY WEIGH STATION. Let by Florida DOT on March 26, 2025, Columbia, StateWide. 1 bid received; low bid $790,012 by E. B. Morris General Contractors, Inc..

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
17
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E. B. Morris General Contractors, Inc.$790,012Low
FDOT contract T9042: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E. B. Morris General Contractors, Inc.
0005Mobilization (0101-1)LS1$65,000
0010Maintenance of traffic (0102-1)DA1$2,325.00
0015Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED900$0.39
0020Portable changeable message sign, temporary (0102-99)ED300$23.25
0025Type III barricade (0102-115)ED600$0.77
0030Sediment barrier (0104-10-3)LF195$7.75
0035Inlet protection system (0104-18)EACH1$2,395.00
0040Litter removal (0107-1)ACRE3.76$310.00
0045Mowing (0107-2)ACRE1.51$3,100.00
0050Clearing & grubbing (0110-1-1)ACRE1$3,875.00
0055Bollards (0519-78)EACH4$855.00
0060Concrete sidewalk and driveways, 4" thick (0522-1)SY19$235.00
0065Mcsaw building, furnish & install, enforcement/administration (0770-1101)SF1$662,686
0070Initial contingency amount, DO not bid (0999-25)LS1$22,000
0075Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31203)LF16$75.00
0080Utility pipe- copper, furnish & install, water/sewer, 1" (1050-71201)LF58$120.00
0085Utility fixture, valve assembly, furnish and install, 1" (1080-24100)EACH1$540.00
FDOT contract T9042: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy