| 0005 | Mobilization (0101-1) | LS | 1 | $294,471 | $345,000 | $480,303 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $308,863 | $245,000 | $463,704 |
| 0015 | Commercial material for temporary driveway maintenance (0102-3) | CY | 18.40 | $552.21 | $160.00 | $692.00 |
| 0020 | Traffic control officer (0102-14) | HR | 112 | $80.00 | $112.00 | $113.03 |
| 0025 | Work zone sign (0102-60) | ED | 21,750 | $0.33 | $0.25 | $0.28 |
| 0030 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 2,520 | $23.18 | $26.00 | $38.06 |
| 0035 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 4,308 | $8.43 | $9.50 | $12.69 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 153,750 | $0.13 | $0.12 | $0.14 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 300 | $5.06 | $6.00 | $5.77 |
| 0050 | Temporary crash cushion, redirective option (0102-89-1) | LO | 4 | $1,158.78 | $1,275.00 | $1,038.01 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 656 | $11.59 | $12.00 | $13.84 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 300 | $105.34 | $117.50 | $115.33 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 300 | $105.34 | $117.50 | $115.33 |
| 0070 | Type III barricade (0102-115) | ED | 1,800 | $0.32 | $0.30 | $0.40 |
| 0075 | Portable regulatory, sign (0102-150-1) | ED | 600 | $4.74 | $5.90 | $6.92 |
| 0080 | Radar speed display unit (0102-150-2) | ED | 600 | $4.74 | $5.90 | $6.92 |
| 0085 | Sediment barrier (0104-10-3) | LF | 2,876 | $3.21 | $5.00 | $2.02 |
| 0090 | Inlet protection system (0104-18) | EACH | 52 | $173.96 | $310.00 | $173.00 |
| 0095 | Litter removal (0107-1) | ACRE | 271.64 | $41.61 | $50.00 | $79.58 |
| 0100 | Mowing (0107-2) | ACRE | 256.12 | $41.61 | $50.00 | $32.29 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $156,988 | $45,000 | $107,030 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $123,345 | $40,000 | $84,194 |
| 0115 | Removal of existing concrete (0110-4-10) | SY | 189 | $72.95 | $52.00 | $43.83 |
| 0120 | Regular excavation (0120-1) | CY | 690.30 | $101.79 | $87.50 | $34.60 |
| 0125 | Embankment (0120-6) | CY | 142 | $108.57 | $104.00 | $147.63 |
| 0130 | Type B stabilization (0160-4) | SY | 2,711 | $62.86 | $17.00 | $39.21 |
| 0135 | Optional base, base group 01 (0285-701) | SY | 117 | $113.11 | $90.00 | $46.13 |
| 0140 | Optional base, base group 09 (0285-709) | SY | 1,644 | $76.22 | $71.00 | $54.78 |
| 0145 | Turnout base- optional materials (0286-1) | SY | 133 | $77.73 | $134.00 | $40.37 |
| 0150 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 2,600 | $4.44 | $9.50 | $14.64 |
| 0155 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 9,006 | $7.61 | $12.50 | $18.07 |
| 0160 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 34,558 | $3.49 | $4.00 | $7.62 |
| 0165 | Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17) | SY | 67,115 | $2.51 | $3.50 | $7.30 |
| 0170 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 13,389.30 | $133.51 | $160.00 | $175.43 |
| 0175 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 4,127.40 | $238.76 | $270.00 | $268.98 |
| 0180 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 214.50 | $207.72 | $225.00 | $331.87 |
| 0185 | Miscellaneous asphalt (0339-1) | TN | 184.80 | $410.40 | $465.00 | $450.30 |
| 0190 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 2 | $16,617 | $20,250 | $19,953 |
| 0195 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 1 | $14,193 | $11,050 | $10,841 |
| 0200 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $14,228 | $10,500 | $10,322 |
| 0205 | Manholes, P-8, <10' (0425-2-61) | EACH | 1 | $14,269 | $10,700 | $10,611 |
| 0210 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 197 | $235.87 | $230.00 | $225.65 |
| 0215 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 90 | $270.68 | $300.00 | $294.10 |
| 0220 | Metal traffic railing, thrie retrofit (0460-71-1) | LF | 1,006 | $333.41 | $266.50 | $261.45 |
| 0225 | Concrete curb & gutter, type E (0520-1-7) | LF | 1,197 | $50.88 | $56.00 | $30.51 |
| 0230 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 124 | $69.86 | $140.00 | $63.61 |
| 0235 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 53 | $142.02 | $149.00 | $95.84 |
| 0240 | Concrete traffic separator, special- variable width (0520-70) | SY | 72 | $176.62 | $140.00 | $141.05 |
| 0245 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 38 | $208.06 | $355.00 | $121.74 |
| 0250 | Guardrail -roadway, general (0536-1-1) | LF | 3,967 | $23.97 | $28.50 | $27.96 |
| 0255 | Guardrail- roadway, double (0536-1-3) | LF | 478 | $37.13 | $36.00 | $35.34 |
| 0260 | Guardrail removal (0536-73) | LF | 4,398 | $2.11 | $2.50 | $2.31 |
| 0265 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 4 | $1,711.83 | $1,600.00 | $1,571.52 |
| 0270 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,265.64 | $3,765.00 | $3,691.64 |
| 0275 | Guardrail end treatment- type CRT (0536-85-26) | EACH | 1 | $2,159.53 | $3,685.00 | $3,611.79 |
| 0280 | Guardrail end treatment- double face approach terminal (0536-85-27) | EACH | 2 | $14,485 | $12,175 | $11,943 |
| 0285 | Performance turf, sod (0570-1-2) | SY | 15,124 | $4.21 | $6.75 | $3.46 |
| 0290 | Raised pavement marker, type B (0706-1-3) | EACH | 4,054 | $4.00 | $5.25 | $4.38 |
| 0295 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 15.21 | $1,790.01 | $1,500.00 | $1,960.68 |
| 0300 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.51 | $2,388.13 | $1,750.00 | $2,614.62 |
| 0305 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,582 | $1.63 | $1.25 | $1.79 |
| 0310 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 3,486 | $1.74 | $1.75 | $1.90 |
| 0315 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,932 | $1.84 | $2.50 | $2.02 |
| 0320 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 8.90 | $553.05 | $700.00 | $605.50 |
| 0325 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.71 | $680.90 | $1,000.00 | $749.67 |
| 0330 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 6 | $42.14 | $60.00 | $46.13 |
| 0335 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 210 | $36.87 | $29.00 | $40.37 |
| 0340 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.42 | $1,790.07 | $1,500.00 | $1,960.68 |
| 0345 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 540 | $1.74 | $2.30 | $1.90 |
| 0350 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.02 | $684.73 | $700.00 | $749.67 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $51,307 | $51,307 | $51,307 |
| 0360 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,000 | $15,000 | $15,000 |
| 0365 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 5.38 | $3,566.72 | $4,000.00 | $2,018.35 |
| 0370 | Loop assembly, F&I, type B (0660-2102) | AS | 6 | $2,159.53 | $2,410.00 | $2,364.35 |
| 0375 | Loop assembly, F&I, type F (0660-2106) | AS | 9 | $2,633.58 | $2,950.00 | $2,364.35 |
| 0380 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $408.73 | $700.00 | $692.00 |
| 0385 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 6 | $1,966.76 | $1,350.00 | $1,326.34 |
| 0390 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $361.33 | $235.00 | $230.67 |
| 0395 | Single column ground sign assembly, remove (0700-1600) | EACH | 8 | $52.67 | $48.00 | $46.13 |
| 0400 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $31.61 | $120.00 | $57.67 |
| 0405 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 4 | $82.17 | $60.00 | $115.33 |
| 0410 | Tubular marker, 36" white post (0704-1-3) | EACH | 7 | $242.29 | $250.00 | $230.67 |
| 0415 | Tubular marker, 36" yellow (0704-1-4) | EACH | 17 | $237.02 | $250.00 | $230.67 |
| 0420 | Delineator, flexible tubular (0705-11-1) | EACH | 20 | $113.77 | $140.00 | $180.00 |
| 0425 | Delineator, non-flexible (0705-11-2) | EACH | 13 | $104.29 | $115.00 | $180.00 |
| 0430 | Raised pavement marker, type B (0706-1-3) | EACH | 2,027 | $4.00 | $5.25 | $4.38 |
| 0435 | Painted pavement markings, surface (0710-90) | LS | 1 | $40,487 | $93,030 | $60,482 |
| 0440 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 791 | $3.69 | $5.00 | $4.04 |
| 0445 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,743 | $5.53 | $6.00 | $6.06 |
| 0450 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 376 | $7.37 | $7.00 | $8.07 |
| 0455 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $2,394.18 | $4,000.00 | $2,883.35 |
| 0460 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $86.38 | $295.00 | $94.57 |
| 0465 | Thermoplastic, standard, arrow (0711-11170) | EACH | 104 | $72.69 | $95.00 | $79.58 |
| 0470 | Thermoplastic, standard, yield line (0711-11180) | LF | 24 | $10.53 | $30.00 | $11.53 |
| 0475 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 270 | $5.50 | $6.00 | $6.02 |
| 0480 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.51 | $2,633.57 | $4,150.00 | $2,883.35 |
| 0485 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 590 | $16.20 | $17.50 | $17.74 |
| 0490 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $204.37 | $590.00 | $223.75 |
| 0495 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 1 | $86.38 | $300.00 | $94.57 |
| 0500 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 5.87 | $6,834.81 | $8,250.00 | $7,493.25 |
| 0505 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.76 | $9,064.38 | $9,400.00 | $9,990.24 |
| 0510 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 4.45 | $1,711.82 | $2,600.00 | $1,874.18 |
| 0515 | Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171) | GM | 0.30 | $2,616.13 | $3,000.00 | $2,883.35 |
| 0520 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 4.71 | $6,749.62 | $8,250.00 | $7,392.91 |