FDOT contract T7569 bid tabulation

SR 43 (US 301) FROM MANATEE CO LINE TO S OF SR 674 (SUN... Let by Florida DOT on March 26, 2025, Hillsborough, District 7. 4 bids received; low bid $13,589,072 by Ajax Paving Industries of Florida LLC.

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
153
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ajax Paving Industries of Florida LLC$13,589,072Low
2Superior Asphalt, Inc.$15,476,217+14%
3Preferred Materials Inc.$15,491,942+14%
4Watson Civil Construction, Inc.$17,673,736+30%
FDOT contract T7569: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ajax Paving Industries of Florida LLC2. Superior Asphalt, Inc.3. Preferred Materials Inc.4. Watson Civil Construction, Inc.
0005Mobilization (0101-1)LS1$1,325,000$565,000$1,298,415$940,000
0010Mobilization (0101-1)LS1$40,000$220,000$538,193$820,000
0015Maintenance of traffic (0102-1)DA1$1,175,000$477,750$803,937$1,200,000
0020Maintenance of traffic (0102-1)DA1$65,000$265,000$124,428$1,000,000
0025Special detour- temporary pavement (0102-2200)SY1$75,000$161,000$21,951$161,000
0030Special detour- temporary pavement (0102-2200)SY1$75,000$350,000$19,692$154,000
0035Pedestrian or bicycle special detour (0102-4-1)SY1$13,500$9,900.00$2,309.50$30,000
0040Traffic control officer (0102-14)HR8,416$75.00$112.00$84.27$86.00
0045Work zone sign (0102-60)ED71,406$0.22$0.25$0.22$0.33
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,152$45.00$45.00$52.67$50.00
0055Temporary barrier, relocate, low profile concrete (0102-71-23)LF1,056$15.00$14.00$18.96$18.00
0060Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED86,482$0.05$0.15$0.07$0.11
0065Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD420$0.07$0.10$0.19$0.26
0070Arrow board / advance warning arrow panel (0102-76)ED28$15.00$6.00$5.27$7.20
0075Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH6,722$4.34$4.50$3.95$3.90
0080Portable changeable message sign, temporary (0102-99)ED4,928$10.41$10.60$10.01$14.00
0085Temporary signalization and maintenance, intersection (0102-104)ED380$6.81$41.00$5.41$110.00
0090Temporary traffic detection and maintenance, intersection (0102-107-1)ED380$9.97$41.00$7.92$20.00
0095Type III barricade (0102-115)ED460$0.27$0.30$0.37$0.50
0100Temporary raised rumble per day, includes all sets and relocations (0102-909)DA418$46.27$50.00$29.49$28.50
0105Sediment barrier (0104-10-3)LF12,697$1.04$4.00$3.11$1.40
0110Inlet protection system (0104-18)EACH1$245.51$300.00$245.76$145.00
0115Litter removal (0107-1)ACRE1,408.89$45.69$35.00$28.97$28.50
0120Mowing (0107-2)ACRE1,336.96$45.69$40.00$70.35$68.00
0125Clearing & grubbing (0110-1-1)ACRE1$100,000$403,150$277,504$440,000
0130Clearing & grubbing (0110-1-1)ACRE1$100,000$395,000$422,022$300,000
0135Removal of existing concrete (0110-4-10)SY8$135.00$810.00$82.40$60.00
0140Mailbox, F&I single (0110-7-1)EACH14$376.34$375.00$396.93$551.00
0145Regular excavation (0120-1)CY13,852.70$38.00$36.00$75.42$60.00
0150Embankment (0120-6)CY7,903.20$48.00$40.00$60.34$60.00
0155Geosynthetic reinforced embankment (0145-3)SY522$30.00$61.00$29.50$18.00
0160Type B stabilization (0160-4)SY13,864$28.00$25.50$69.70$45.00
0165Optional base, base group 01 (0285-701)SY6,528$19.90$64.50$91.14$47.00
0170Optional base, base group 02 (0285-702)SY92$75.85$125.00$92.50$59.00
0175Optional base, base group 06 (0285-706)SY63$111.77$175.00$89.03$88.00
0180Optional base, base group 08 (0285-708)SY71$90.80$375.00$93.05$160.00
0185Optional base, base group 09 (0285-709)SY4,618$55.01$75.00$100.38$74.40
0190Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY49,005$4.76$4.00$3.50$4.10
0195Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY381$20.28$21.00$8.06$23.00
0200Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY25,894$1.23$7.00$5.40$4.45
0205Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY52,278$6.43$4.70$3.30$4.65
0210Superpave asphaltic conc, traffic C (0334-1-13)TN13,671.10$145.83$163.75$138.74$149.00
0215Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN11,454$176.78$181.00$168.48$170.00
0220Miscellaneous asphalt (0339-1)TN34.50$157.17$820.00$722.11$562.00
0225Inlets, DT bot, type C,<10' (0425-1521)EACH1$10,603$12,350$7,847.87$11,000
0230Pipe culvert, optional material, round, 18"SD (0430-174118)LF100$251.82$325.00$230.86$290.00
0235Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF160$291.13$360.00$293.49$300.00
0240Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF300$229.20$315.00$229.39$295.00
0245Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF51$342.90$345.00$301.77$394.00
0250Straight concrete endwalls, single, 0 degrees, round (0430-524100)EACH1$9,197.64$20,000$19,371$5,000.00
0255Mitered end section, optional round, 18" CD (0430-982125)EACH4$3,019.46$6,440.00$4,150.16$4,300.00
0260Mitered end section, optional round, 18" SD (0430-984125)EACH6$3,019.46$6,550.00$4,150.16$4,700.00
0265Mitered end section, optional round, 24" SD (0430-984129)EACH2$3,270.13$6,900.00$4,551.56$4,900.00
0270Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH6$3,140.15$6,550.00$4,152.68$4,700.00
0275Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF336$46.27$78.00$51.61$52.00
0280Polymer nosing for bridge expansion joint (0458-2)CF115.20$925.52$1,000.00$821.59$823.00
0285Concrete curb, type D (0520-2-4)LF70$35.00$130.00$55.76$46.00
0290Shoulder gutter- concrete (0520-6)LF1,283$42.00$92.50$51.44$35.00
0295Concrete sidewalk and driveways, 4" thick (0522-1)SY8$165.84$675.00$146.19$70.00
0300Detectable warnings (0527-2)SF20$23.14$130.00$30.97$82.00
0305Riprap, rubble, F&I, ditch lining (0530-3-4)TN62.60$344.73$1,150.00$718.34$262.00
0310Bedding stone (0530-74)TN52.10$202.03$1,260.00$751.64$319.00
0315Guardrail -roadway, general (0536-1-1)LF1,081$23.55$26.00$26.66$20.50
0320Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH4$3,771.69$5,175.00$4,192.92$3,300.00
0325Guardrail removal (0536-73)LF538$2.77$3.50$3.25$2.40
0330Guardrail end treatment- parallel approach terminal (0536-85-24)EACH4$3,860.01$3,800.00$3,812.71$3,375.00
0335Performance turf, sod (0570-1-2)SY65,577$4.82$5.75$3.16$7.90
0340Conduit, furnish & install, open trench (0630-2-11)LF31$108.26$41.00$86.04$51.20
0345Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH1$2,094.43$2,800.00$1,664.52$1,320.00
0350Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH2$2,515.66$2,900.00$1,999.29$2,200.00
0355Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH2$3,140.22$2,350.00$2,495.65$2,050.00
0360Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH1$7,684.03$10,000$6,106.79$7,500.00
0365Painted pavement markings, standard, white, solid, 6" (0710-11101)GM18.63$1,735.35$1,800.00$1,579.98$1,550.00
0370Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF515$1.62$2.00$1.47$1.45
0375Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF920$1.73$2.00$1.58$1.55
0380Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF230$1.85$2.00$1.69$1.65
0385Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.29$561.10$1,000.00$501.89$487.00
0390Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.78$809.83$1,000.00$734.50$712.00
0395Painted pavement markings, standard, white, message or symbol (0710-11160)EACH11$46.27$45.00$42.13$41.00
0400Painted pavement markings, standard, white, arrows (0710-11170)EACH96$40.49$40.00$36.87$36.00
0405Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM21.72$1,735.35$1,750.00$1,579.76$1,550.00
0410Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,656$1.73$2.00$1.58$1.55
0415Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.69$809.83$1,000.00$734.13$712.00
0420Initial contingency amount, DO not bid (0999-25)LS1$79,000$79,000$79,000$79,000
0425Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000
0430Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM18.28$676.78$2,600.00$1,879.58$2,100.00
0435Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH46$595.80$605.00$542.46$490.00
0440Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH49$1,648.58$1,675.00$1,500.98$1,650.00
0445Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$2,313.80$2,350.00$2,106.64$2,450.00
0450Single column ground sign assembly, relocate (0700-1500)EACH23$26.61$27.00$24.23$409.00
0455Single column ground sign assembly, remove (0700-1600)EACH80$92.55$95.00$84.27$20.50
0460Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$7,959.47$8,100.00$7,246.84$8,200.00
0465Multi-column ground sign assembly, remove (0700-2600)EACH2$2.31$2.50$2.11$1,535.00
0470Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH29$231.37$190.00$168.53$200.00
0475Tubular marker, 36" yellow (0704-1-4)EACH2$173.54$235.00$210.67$77.00
0480Object marker, type 1 (0705-10-1)EACH37$173.54$175.00$158.00$266.00
0485Object marker, type 2 (0705-10-2)EACH8$173.54$175.00$158.00$128.00
0490Object marker, type 4 (0705-10-4)EACH6$80.98$175.00$158.00$307.00
0495Delineator, flexible tubular (0705-11-1)EACH52$185.10$82.50$73.73$77.00
0500Raised pavement marker, type B (0706-1-3)EACH3,357$4.34$4.50$3.95$3.90
0505Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF126$4.63$5.00$4.21$4.10
0510Painted pavement markings, surface (0710-90)LS1$64,297$65,350$58,540$54,000
0515Painted pavement markings, surface (0710-90)LS1$12,147$12,350$11,060$9,000.00
0520Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF515$3.62$3.75$3.30$3.20
0525Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF920$5.44$5.50$4.95$4.85
0530Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF269$7.24$7.50$6.59$6.40
0535Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.60$2,718.71$2,800.00$2,442.19$2,400.00
0540Thermoplastic, standard, message or symbol (0711-11160)EACH3$122.64$125.00$111.65$109.00
0545Thermoplastic, standard, arrow (0711-11170)EACH78$62.47$65.00$56.88$56.00
0550Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF2,632$5.07$5.15$4.61$4.50
0555Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.68$2,718.71$3,000.00$2,449.70$2,375.00
0560Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF381$18.30$19.00$16.66$16.20
0565Thermoplastic, preformed, white, message (0711-14160)EACH8$230.22$235.00$209.61$204.00
0570Thermoplastic, preformed, white, arrow (0711-14170)EACH8$97.18$100.00$88.48$86.00
0575Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526)LF90$24.44$25.00$22.26$22.00
0580Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF173$15.30$15.50$13.92$14.00
0585Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM13.19$5,218.77$5,350.00$4,749.00$4,650.00
0590Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.29$1,304.99$1,500.00$1,167.30$1,135.00
0595Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM16.20$4,893.69$4,975.00$4,454.99$4,350.00
0600Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF824$2.60$3.00$2.37$2.35
0605Conduit, furnish & install, open trench (0630-2-11)LF5$67.96$45.00$54.01$67.00
0610Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH1$2,094.43$2,765.00$1,664.52$1,320.00
0615Electrical service wire, (0639-2-6)LF34$11.58$3.00$9.21$8.70
0620Strain pole, wood, remove (0643-600)EACH1$2,778.75$1,235.00$2,208.38$1,750.00
0625Loop assembly- F&I, type A (0660-2101)AS3$3,147.38$3,250.00$2,501.34$1,750.00
0630Loop assembly, F&I, type B (0660-2102)AS2$2,170.29$3,000.00$1,724.81$1,700.00
0635Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH1$7,674.14$8,250.00$6,098.93$9,300.00
0640Internally illuminated sign, remove (0700-5-60)EACH1$231.57$90.00$184.04$547.00
0645Enhanced highway sign AC powered, remove - ground mount (0700-141902)EACH1$1,389.38$1,765.00$1,104.19$1,800.00
0650Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111)EACH1$12,095$14,700$9,612.36$10,500
0655Sediment barrier (0104-10-3)LF3,930$1.04$5.00$3.11$1.35
0660Clearing & grubbing (0110-1-1)ACRE1$150,000$45,000$242,263$100,000
0665Removal of existing concrete (0110-4-10)SY17$41.25$475.00$81.11$70.00
0670Tree removal (0110-23)EACH140$1,503.97$1,530.00$684.66$1,900.00
0675Local agency initial amount (DO not bid) (0999-26)LS1$50,000$50,000$50,000$50,000
0680Utility pipe,remove & dispose, 8- 19.9" (1050-16004)LF4,241$28.92$95.00$29.49$165.00
0685Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206)LF106$112.74$220.00$173.80$181.00
0690Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 12" (1050-51212)LF4,207$191.75$240.00$145.36$243.00
0695Utility fittings, ductile iron, furnish & install elbow, (1055-51112)EACH6$2,127.54$1,835.00$947.99$2,200.00
0700Utility fittings, ductile iron, furnish & install tee, 12" (1055-51212)EACH6$2,881.83$2,500.00$1,579.98$2,300.00
0703Utility fittings, ductile iron, furnish & install reducer, 12" (1055-51312)EACH2$2,200.00$2,940.00$710.99$2,000.00
0705Utility fittings, ductile iron, furnish & install, 12" (1055-51512)EACH3$1,593.05$1,620.00$695.19$910.00
0710Utility fittings, ductile iron, furnish & install Y, 12" (1055-51612)EACH2$3,284.44$4,300.00$1,790.65$3,400.00
0715Utility fixture, valve assembly, furnish and install, 6" (1080-24106)EACH4$4,874.02$6,820.00$3,159.96$2,900.00
0720Utility fixture, valve assembly, furnish and install, 12" (1080-24112)EACH20$9,455.33$10,200$6,319.92$6,400.00
0725Utility fixture, valve assembly, adjust/modify (1080-24500)EACH3$2,798.54$14,100$26,333$34,000
0730Utility fixture- blowoff assembly, furnish and install, (1080-25112)EACH5$3,304.11$5,115.00$4,213.28$2,700.00
0735Utility fixture, vac/air furnish and INSTALL12" (1080-26112)EACH3$4,648.42$10,650$8,426.56$4,400.00
0740Utility fixture, mechanical restraint, furnish & install, 10" (1080-29110)EACH8$1,247.14$1,295.00$136.93$585.00
0745Utility fixture, mechanical restraint, furnish & install, 12" (1080-29112)EACH79$826.03$1,295.00$184.33$590.00
0750Utility fixture- sample point, furnish & install, 12" (1080-32112)EACH7$1,058.56$2,470.00$3,054.63$1,600.00
0755Fire hydrant, F&I, traffic, 3 way 2 hose, 1PUMPER, 6" (1644-136-08)EACH2$9,444.92$14,900$6,846.58$7,100.00
0760Fire hydrant, salvage & store (1644-400)EACH2$1,272.59$3,530.00$1,053.32$1,100.00
FDOT contract T7569: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy