FDOT contract T3944 bid tabulation

SR 10 (US 90/TENNESSEE ST) FROM SR 61 (US 27/MONROE ST) TO.. Let by Florida DOT on March 26, 2025, Leon, District 3. 2 bids received; low bid $7,523,719 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
26 MAR 2025
Pay items
107
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$7,523,719Low
2Capital Asphalt Inc$8,368,627+11%
FDOT contract T3944: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Capital Asphalt Inc
0005Mobilization (0101-1)LS1$1,800,000$2,000,000
0010Mobilization (0101-1)LS1$100,000$350,000
0015Maintenance of traffic (0102-1)DA1$234,360$260,400
0020Maintenance of traffic (0102-1)DA1$8,680.00$75,950
0025Traffic control officer (0102-14)HR182$140.00$125.00
0030Work zone sign (0102-60)ED16,367$0.50$0.50
0035Temporary barrier, F&I, low profile, concrete (0102-71-13)LF612$77.00$70.00
0040Temporary barrier, relocate, low profile concrete (0102-71-23)LF444$42.00$40.00
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED5,678$0.15$2.00
0050Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD5,256$0.15$10.00
0055Arrow board / advance warning arrow panel (0102-76)ED116$7.00$10.00
0060Portable changeable message sign, temporary (0102-99)ED478$21.00$30.00
0065Temporary signalization and maintenance, intersection (0102-104)ED1,575$15.00$20.00
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,575$28.00$36.00
0075Inlet protection system (0104-18)EACH60$260.00$350.00
0080Litter removal (0107-1)ACRE38.95$630.00$100.00
0085Mowing (0107-2)ACRE38.95$560.00$100.00
0090Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$14,000$25,000
0095Monitor existing structures- vibration monitoring (0108-2)LS1$31,000$35,000
0100Clearing & grubbing (0110-1-1)ACRE1$94,000$150,000
0105Removal of existing concrete (0110-4-10)SY958$156.00$60.00
0110Regular excavation (0120-1)CY133.60$83.00$100.00
0115Borrow excavation, truck measure (0120-2-2)CY282.20$130.00$100.00
0120Optional base, base group 04 (0285-704)SY2$730.00$5,000.00
0125Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY37,012$5.60$7.50
0130Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY3,669$24.00$25.00
0135Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN4,375$250.00$300.00
0140Miscellaneous asphalt (0339-1)TN35.10$1,000.00$600.00
0145Inlets, curb, type P-3, partial (0425-1335)EACH1$20,000$25,000
0150Inlets, curb, type P-5, <10' (0425-1351)EACH1$16,000$35,000
0155Inlets, closed flume (0425-1910)EACH1$25,000$7,000.00
0160Manhole, adjust (0425-5)EACH5$2,600.00$5,000.00
0165Modify existing drainage structure (0425-11)EACH1$9,000.00$6,000.00
0170Pipe culvert, optional material, round, 15"SD (0430-174115)LF4$1,900.00$1,500.00
0175PVC pipe for back of sidewalk, non standard diameter (0430-963-2)LF384$54.00$200.00
0180Pipe handrail - guiderail, aluminum (0515-1-2)LF48$130.00$250.00
0185Concrete curb & gutter, type E (0520-1-7)LF121$210.00$60.00
0190Concrete curb & gutter, type F (0520-1-10)LF1,094$220.00$60.00
0195Concrete traffic separator, special- variable width (0520-70)SY13$700.00$180.00
0200Concrete sidewalk and driveways, 4" thick (0522-1)SY297$310.00$110.00
0205Concrete sidewalk and driveways, 6" thick (0522-2)SY459$360.00$130.00
0210Detectable warnings (0527-2)SF438$45.00$75.00
0215Guardrail -roadway, general (0536-1-1)LF1,600$35.00$30.00
0220Pipe rail for guardrail (0536-6)LF1,600$28.00$25.00
0225Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH4$350.00$300.00
0230Guardrail removal (0536-73)LF1,579$3.50$3.00
0235Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$2,800.00$2,400.00
0240Guardrail end treatment- parallel approach terminal (0536-85-24)EACH2$4,300.00$3,750.00
0245Retaining wall system, soldier pile wall, permanent, with cast- in-place concrete fascia (0548-53)SF2,247$610.00$800.00
0250Performance turf, sod (0570-1-2)SY265$64.00$50.00
0255Tubular marker, 36" yellow (0704-1-4)EACH21$170.00$250.00
0260Raised pavement marker, type B (0706-1-3)EACH763$5.60$5.00
0265Painted pavement markings, standard, white, solid, 6" (0710-11101)GM2.81$2,300.00$2,100.00
0270Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.05$2,800.00$2,400.00
0275Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF3,497$3.50$3.00
0280Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF554$4.90$4.50
0285Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM1.83$1,700.00$1,500.00
0290Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.07$1,600.00$1,550.00
0295Painted pavement markings, standard, white, arrows (0710-11170)EACH33$67.00$60.00
0300Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM2.05$2,400.00$2,100.00
0305Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF274$4.20$4.00
0310Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.34$2,000.00$1,700.00
0315Initial contingency amount, DO not bid (0999-25)LS1$43,204$43,204
0320Initial contingency amount, DO not bid (0999-25)LS1$6,774.55$6,774.55
0325Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH14$630.00$550.00
0330Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,900.00$2,500.00
0335Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH9$3,100.00$2,700.00
0340Single column ground sign assembly, remove (0700-1600)EACH14$49.00$42.00
0345Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH3$240.00$210.00
0350Sign panel, relocate, UP to 12 SF (0700-3501)EACH4$91.00$78.00
0355Sign panel, remove, UP to 12 SF (0700-3601)EACH8$42.00$36.00
0360Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH9$120.00$102.00
0365Tubular marker, 36" yellow (0704-1-4)EACH45$170.00$144.00
0370Raised pavement marker, type B (0706-1-3)EACH763$5.60$5.00
0375Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF293$4.20$4.00
0380Painted pavement markings, surface (0710-90)LS1$33,000$28,000
0385Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF3,497$7.00$6.00
0390Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF554$11.00$10.00
0395Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.07$5,400.00$5,200.00
0400Thermoplastic, standard, arrow (0711-11170)EACH33$120.00$102.00
0405Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF274$9.75$9.00
0410Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.34$6,500.00$5,700.00
0415Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,390$20.00$17.00
0420Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM2.81$8,300.00$7,200.00
0425Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.05$12,000$10,500
0430Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.83$3,300.00$2,900.00
0435Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM2.05$8,200.00$7,100.00
0440Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF21$7.00$6.00
0445Conduit, furnish & install, open trench (0630-2-11)LF233$17.00$14.00
0450Conduit, furnish & install, directional bore (0630-2-12)LF4,374$42.00$33.00
0455Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI7$15,000$12,000
0460Signal cable, remove- intersection (0632-7-6)PI7$1,200.00$900.00
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH34$1,800.00$1,400.00
0470Aluminum signals pole, (0646-1-11)EACH5$5,100.00$4,000.00
0475Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH22$1,500.00$1,200.00
0480Aluminum signals pole, remove (0646-1-60)EACH15$150.00$120.00
0485Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS3$1,900.00$1,500.00
0490Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS5$3,200.00$2,520.00
0495Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS3$150.00$120.00
0500Loop assembly- F&I, type A (0660-2101)AS33$1,700.00$1,350.00
0505Loop assembly, F&I, type B (0660-2102)AS56$2,300.00$1,800.00
0510Loop assembly, F&I, type F (0660-2106)AS10$3,900.00$3,000.00
0515Pedestrian detector, furnish & install, accessible (0665-1-12)EACH53$3,000.00$2,400.00
0520Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH34$140.00$110.00
0525Artificial coverings /rolled erosion control products (0104-1)SY162$33.00$50.00
0530Landscape complete- small plants (0580-1-1)LS1$32,000$50,000
0535Manhole, adjust, utilities (0425-5-1)EACH13$980.00$5,000.00
FDOT contract T3944: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy