| 0005 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 174 | $84.67 | $120.00 | $64.00 |
| 0010 | Metal traffic railing, thrie retrofit (0460-71-1) | LF | 254 | $529.15 | $430.00 | $400.00 |
| 0015 | Mobilization (0101-1) | LS | 1 | $517,328 | $873,915 | $407,388 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $336,788 | $780,516 | $581,334 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $5,855.06 | $10,000 | $24,207 |
| 0030 | Work zone sign (0102-60) | ED | 15,710 | $0.33 | $0.22 | $0.20 |
| 0035 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 255 | $79.37 | $45.15 | $42.00 |
| 0040 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 255 | $59.52 | $19.35 | $18.00 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 14,370 | $0.20 | $0.10 | $0.09 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,977 | $0.11 | $0.06 | $0.05 |
| 0055 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 2,598 | $5.95 | $4.85 | $4.50 |
| 0060 | Temporary crash cushion, redirective option (0102-89-1) | LO | 4 | $1,389.00 | $1,290.00 | $2,500.00 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 528 | $15.87 | $9.70 | $9.00 |
| 0070 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 360 | $59.52 | $26.90 | $25.00 |
| 0075 | Sediment barrier (0104-10-3) | LF | 616 | $8.89 | $2.50 | $7.51 |
| 0080 | Inlet protection system (0104-18) | EACH | 51 | $165.36 | $125.00 | $166.73 |
| 0085 | Litter removal (0107-1) | ACRE | 560.70 | $132.29 | $80.65 | $100.00 |
| 0090 | Mowing (0107-2) | ACRE | 503.44 | $165.36 | $134.40 | $125.00 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $38,695 | $61,500 | $16,993 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 242 | $125.64 | $59.15 | $55.00 |
| 0105 | Regular excavation (0120-1) | CY | 11 | $424.05 | $30.00 | $635.77 |
| 0110 | Subsoil excavation (0120-4) | CY | 47 | $265.12 | $50.00 | $148.80 |
| 0115 | Embankment (0120-6) | CY | 34 | $199.72 | $40.00 | $397.16 |
| 0120 | Flowable fill (0121-70) | CY | 47 | $475.22 | $618.15 | $575.00 |
| 0125 | Optional base, base group 01 (0285-701) | SY | 7,855 | $11.35 | $18.40 | $24.03 |
| 0130 | Optional base, base group 02 (0285-702) | SY | 152 | $47.54 | $28.65 | $83.08 |
| 0135 | Optional base, base group 09 (0285-709) | SY | 47 | $222.38 | $125.00 | $358.01 |
| 0140 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 27,493 | $2.98 | $3.48 | $6.19 |
| 0145 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 112,295 | $2.71 | $2.72 | $3.55 |
| 0150 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 22,587 | $2.60 | $2.31 | $4.91 |
| 0155 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 30,104 | $2.22 | $1.55 | $1.91 |
| 0160 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 12.60 | $370.78 | $250.00 | $907.62 |
| 0165 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 11,522.40 | $155.40 | $168.15 | $213.93 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 15,869.50 | $152.07 | $168.15 | $207.63 |
| 0175 | Miscellaneous asphalt (0339-1) | TN | 35 | $529.82 | $250.00 | $930.09 |
| 0180 | Manhole, adjust, utilities (0425-5-1) | EACH | 8 | $5,291.42 | $2,365.00 | $2,200.00 |
| 0185 | Valve boxes, adjust (0425-6) | EACH | 7 | $1,984.28 | $2,365.00 | $2,200.00 |
| 0190 | Manhole cover- replace (0425-7) | EACH | 7 | $1,984.28 | $2,795.00 | $2,600.00 |
| 0195 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 25 | $229.59 | $293.00 | $272.00 |
| 0200 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $3,694.69 | $3,858.00 | $3,588.00 |
| 0205 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $3,408.06 | $3,510.00 | $3,265.00 |
| 0210 | Concrete curb & gutter, type F (0520-1-10) | LF | 379 | $125.30 | $112.00 | $104.00 |
| 0215 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 29 | $333.53 | $165.55 | $154.00 |
| 0220 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 126 | $164.13 | $207.50 | $193.00 |
| 0225 | Detectable warnings (0527-2) | SF | 163 | $66.01 | $58.05 | $54.00 |
| 0230 | Guardrail -roadway, general (0536-1-1) | LF | 1,044 | $39.68 | $32.25 | $25.00 |
| 0235 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 4 | $3,968.57 | $3,225.00 | $3,700.00 |
| 0240 | Guardrail removal (0536-73) | LF | 560 | $13.23 | $10.75 | $2.50 |
| 0245 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,968.57 | $3,225.00 | $3,000.00 |
| 0250 | Performance turf, sod (0570-1-2) | SY | 29,740 | $3.56 | $2.70 | $3.66 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 4,348 | $5.95 | $4.85 | $4.50 |
| 0260 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 18.94 | $1,918.15 | $1,559.00 | $1,449.31 |
| 0265 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,328 | $1.98 | $1.61 | $1.50 |
| 0270 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 901 | $2.31 | $1.90 | $1.75 |
| 0275 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,442 | $2.65 | $2.15 | $2.00 |
| 0280 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.11 | $1,124.43 | $913.75 | $820.18 |
| 0285 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.17 | $1,521.28 | $1,237.00 | $1,130.06 |
| 0290 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 6 | $77.72 | $63.15 | $58.75 |
| 0295 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 45 | $54.89 | $44.60 | $41.50 |
| 0300 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.88 | $1,885.08 | $1,532.00 | $1,423.99 |
| 0305 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 868 | $2.58 | $2.10 | $1.95 |
| 0310 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 6.08 | $760.64 | $619.00 | $574.53 |
| 0315 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.23 | $1,521.28 | $1,236.25 | $1,109.65 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $84,055 | $84,055 | $84,055 |
| 0325 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 19.38 | $2,182.72 | $2,229.00 | $2,042.81 |
| 0330 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 61 | $595.29 | $585.00 | $475.00 |
| 0335 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $3,307.13 | $940.00 | $750.00 |
| 0340 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $264.57 | $265.00 | $150.00 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 31 | $66.14 | $43.00 | $35.00 |
| 0350 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 6 | $198.43 | $231.15 | $250.00 |
| 0355 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $33.07 | $27.00 | $35.00 |
| 0360 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $132.29 | $93.55 | $100.00 |
| 0365 | Object marker, type 1 (0705-10-1) | EACH | 55 | $85.99 | $270.00 | $250.00 |
| 0370 | Object marker, type 2 (0705-10-2) | EACH | 16 | $99.22 | $278.50 | $75.00 |
| 0375 | Object marker, type 3 (0705-10-3) | EACH | 4 | $396.86 | $278.50 | $275.00 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 2,668 | $5.95 | $4.85 | $4.50 |
| 0385 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 255 | $6.61 | $5.40 | $5.00 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $143,587 | $81,210 | $75,544 |
| 0395 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.06 | $29,103 | $11,234 | $9,330.36 |
| 0400 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,073 | $5.95 | $4.85 | $4.50 |
| 0405 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,230 | $7.94 | $7.00 | $6.50 |
| 0410 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 496 | $11.90 | $9.45 | $8.75 |
| 0415 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.28 | $3,637.85 | $2,957.00 | $2,661.29 |
| 0420 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 4 | $185.20 | $178.00 | $165.00 |
| 0425 | Thermoplastic, standard, arrow (0711-11170) | EACH | 43 | $132.29 | $124.00 | $115.00 |
| 0430 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 868 | $7.94 | $7.00 | $6.50 |
| 0435 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.23 | $3,637.85 | $2,957.00 | $2,653.51 |
| 0440 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 332 | $18.52 | $18.95 | $17.60 |
| 0445 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 17.64 | $5,159.14 | $6,030.75 | $5,609.05 |
| 0450 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.01 | $5,159.14 | $6,030.75 | $5,605.02 |
| 0455 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 5.91 | $1,719.72 | $1,989.00 | $1,847.49 |
| 0460 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 4 | $3,968.57 | $1,183.00 | $1,742.00 |
| 0465 | Vehicular traffic signal, furnish & install aluminum, 1 section, 2-4 way (0650-1-12) | AS | 2 | $6,614.27 | $3,145.00 | $2,987.00 |
| 0470 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 6 | $198.43 | $268.00 | $524.00 |