FDOT contract T2A11 bid tabulation
SR 345 FROM CR 345 TO SR 500. Let by Florida DOT on January 29, 2025, Levy, District 2. 5 bids received; low bid $4,938,588 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 56
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $4,938,588 | Low |
| 2 | Superior Asphalt, Inc. | $5,530,001 | +12% |
| 3 | Watson Construction Company, LLC | $5,581,183 | +13% |
| 4 | Preferred Materials Inc. | $7,370,765 | +49% |
| 5 | Whitehurst, V. E. & Sons, Inc. | $7,521,787 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Superior Asphalt, Inc. | 3. Watson Construction Company, LLC | 4. Preferred Materials Inc. | 5. Whitehurst, V. E. & Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $556,557 | $297,351 | $521,301 | $600,000 | $1,099,917 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $345,153 | $352,690 | $304,000 | $551,000 | $940,044 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $21,881 | $21,000 | $23,955 | $43,417 | $10,000 |
| 0020 | Work zone sign (0102-60) | ED | 7,920 | $0.47 | $0.45 | $0.34 | $0.40 | $0.38 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 5,400 | $0.17 | $0.15 | $0.19 | $0.15 | $0.22 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,674 | $0.17 | $0.15 | $0.31 | $0.15 | $0.11 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $6.98 | $6.70 | $12.50 | $6.00 | $10.75 |
| 0040 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 1,543 | $6.40 | $5.60 | $6.50 | $5.50 | $5.91 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 582 | $13.95 | $13.40 | $25.00 | $12.00 | $17.20 |
| 0050 | Sediment barrier (0104-10-3) | LF | 24,179 | $2.48 | $2.35 | $1.50 | $1.74 | $2.00 |
| 0055 | Inlet protection system (0104-18) | EACH | 16 | $232.59 | $174.75 | $250.00 | $318.39 | $125.00 |
| 0060 | Litter removal (0107-1) | ACRE | 159.96 | $116.29 | $111.50 | $70.00 | $250.00 | $80.65 |
| 0065 | Mowing (0107-2) | ACRE | 159.96 | $116.29 | $223.00 | $70.00 | $225.00 | $242.00 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $35,009 | $29,125 | $25,000 | $99,000 | $160,750 |
| 0075 | Removal of existing concrete (0110-4-10) | SY | 206 | $63.97 | $51.25 | $55.00 | $50.00 | $74.55 |
| 0080 | Mailbox, F&I single (0110-7-1) | EACH | 15 | $348.88 | $407.75 | $250.00 | $399.53 | $200.00 |
| 0085 | Optional base, base group 01 (0285-701) | SY | 22,970 | $24.71 | $39.50 | $33.80 | $52.98 | $60.00 |
| 0090 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 654 | $19.21 | $28.10 | $8.00 | $40.55 | $3.00 |
| 0095 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 117,572 | $2.38 | $4.75 | $3.26 | $5.13 | $3.75 |
| 0100 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 14,703.20 | $161.44 | $178.60 | $185.00 | $230.34 | $182.42 |
| 0105 | Miscellaneous asphalt (0339-1) | TN | 210.90 | $348.66 | $248.00 | $350.00 | $509.71 | $225.00 |
| 0110 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 163 | $290.73 | $145.00 | $162.00 | $125.00 | $338.00 |
| 0115 | Detectable warnings (0527-2) | SF | 240 | $87.22 | $44.60 | $60.00 | $55.00 | $78.00 |
| 0120 | Guardrail -roadway, general (0536-1-1) | LF | 319 | $25.58 | $24.55 | $39.00 | $22.00 | $39.75 |
| 0125 | Guardrail removal (0536-73) | LF | 381 | $6.98 | $6.70 | $4.20 | $6.00 | $8.10 |
| 0130 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,605.11 | $3,455.00 | $4,200.00 | $3,100.00 | $5,241.00 |
| 0135 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 19,825 | $2.15 | $6.70 | $4.25 | $5.75 | $2.90 |
| 0140 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 14.65 | $2,325.88 | $1,226.50 | $1,900.00 | $2,000.00 | $2,150.00 |
| 0145 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,185 | $3.49 | $2.25 | $2.00 | $3.00 | $3.25 |
| 0150 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,500 | $4.65 | $2.25 | $3.85 | $4.00 | $4.30 |
| 0155 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.46 | $2,151.43 | $557.50 | $1,900.00 | $1,850.00 | $1,989.00 |
| 0160 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 2 | $127.92 | $55.75 | $300.00 | $110.00 | $119.00 |
| 0165 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 2 | $75.59 | $33.45 | $100.00 | $65.00 | $70.00 |
| 0170 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.74 | $2,325.88 | $1,226.50 | $1,900.00 | $2,000.00 | $2,150.00 |
| 0175 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 46 | $4.07 | $2.25 | $5.00 | $3.50 | $3.80 |
| 0180 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 5.06 | $1,744.41 | $557.50 | $1,900.00 | $1,500.00 | $1,615.00 |
| 0185 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $53,445 | $53,445 | $53,445 | $53,445 | $53,445 |
| 0190 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 13.34 | $1,860.70 | $1,200.00 | $4,170.00 | $2,036.79 | $2,420.00 |
| 0195 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 8 | $569.26 | $725.00 | $500.00 | $489.50 | $1,117.00 |
| 0200 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,110.73 | $2,010.00 | $850.00 | $1,815.00 | $2,645.00 |
| 0205 | Single column ground sign assembly, relocate (0700-1500) | EACH | 6 | $127.92 | $223.00 | $300.00 | $110.00 | $365.00 |
| 0210 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $63.97 | $33.50 | $50.00 | $55.00 | $53.75 |
| 0215 | Sign panel, install, UP to 12 SF (0700-3401) | EACH | 4 | $255.84 | $278.75 | $450.00 | $220.00 | $311.00 |
| 0220 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $63.97 | $27.90 | $50.00 | $55.00 | $27.00 |
| 0225 | Raised pavement marker, type B (0706-1-3) | EACH | 1,543 | $6.69 | $5.60 | $6.75 | $5.75 | $6.20 |
| 0230 | Painted pavement markings, surface (0710-90) | LS | 1 | $81,406 | $15,000 | $69,814 | $70,000 | $75,250 |
| 0235 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,185 | $4.94 | $5.60 | $5.00 | $5.93 | $6.40 |
| 0240 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 804 | $12.79 | $7.80 | $9.60 | $8.89 | $9.60 |
| 0245 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.46 | $3,488.82 | $4,460.00 | $7,600.00 | $5,154.76 | $5,545.00 |
| 0250 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $174.44 | $223.00 | $550.00 | $296.25 | $320.00 |
| 0255 | Thermoplastic, standard, arrow (0711-11170) | EACH | 2 | $127.92 | $83.65 | $180.00 | $94.80 | $102.00 |
| 0260 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 46 | $10.47 | $7.80 | $20.00 | $7.11 | $7.70 |
| 0265 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 696 | $17.44 | $16.75 | $16.00 | $15.41 | $16.60 |
| 0270 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 14.65 | $4,884.33 | $6,915.00 | $7,600.00 | $6,576.75 | $7,070.00 |
| 0275 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.74 | $4,884.33 | $6,915.00 | $7,600.00 | $6,458.25 | $7,070.00 |
| 0280 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 5.06 | $1,628.11 | $2,215.00 | $7,600.00 | $2,607.00 | $2,805.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.