Condotte America, Inc.: FDOT bid record

Condotte America, Inc. submitted 25 bids on Florida DOT contracts in the data, from 25 APR 2018 to 22 FEB 2023, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +13% above the low bid.

Owner
Florida DOT
Low bid volume
$39,908,786
Latest bid
22 FEB 2023
Data through
28 OCT 2026
25Bids
4Low bids
16Win rate, percent
+13%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2018500%
201910330%
20206117%
2021100%
2022200%
2023100%
Condotte America, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 413215%
District 610110%
District 5100%
District 111100%
Condotte America, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Type B stabilization0160-4SY2111 (52%)$4.00$15.00
Disputes review board, meeting- DO not bid0999-20-1DA99 (100%)$3,900.00$3,900.00
Disputes review board, hearing- DO not bid0999-20-2EACH99 (100%)$4,500.00$4,500.00
Regular excavation0120-1CY227 (32%)$10.00$25.47
Detectable warnings0527-2SF207 (35%)$25.23$35.00
Sediment barrier0104-10-3LF226 (27%)$1.60$2.60
Concrete sidewalk and driveways, 4" thick0522-1SY205 (25%)$40.00$65.00
Litter removal0107-1ACRE185 (28%)$32.55$52.98
Miscellaneous asphalt0339-1TN175 (29%)$230.00$375.00
Floating turbidity barrier0104-11LF175 (29%)$12.00$15.92
Traffic control officer0102-14HR145 (36%)$60.00$80.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED254 (16%)$0.13$0.13
Condotte America, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 FEB 2023T4633District 4SR 9 (I-95)3 of 6$19,761,175+10%
26 JAN 2022T4595District 4SR 817 (UNIVERSITY DR)6 of 9$13,999,557+24%
12 JAN 2022T4583District 4SR A1A (NORTH CAUSEWAY)6 of 7$126,856,032+14%
27 OCT 2021T6511District 6SR 25 (OKEECHOBEE RD)3 of 5$119,754,499+13%
18 NOV 2020T1035District 1SR 400 (I-4)1 of 6$26,131,247Low, 12% under the second
26 AUG 2020T6505District 6SR 94 (KENDALL DR/SW 88 ST)11 of 14$5,094,585+11%
29 JUL 2020T6507District 6SR 90/SW 8TH ST3 of 12$1,569,717+2.0%
20 MAY 2020T4552District 4SR 9 (I-95)4 of 6$29,239,932+11%
25 MAR 2020T4539District 4SR 93/SR 845 of 9$7,327,996+3.0%
26 FEB 2020T4534District 4ROCK ISLAND RD10 of 11$1,578,000+27%
25 SEP 2019T4526District 4EL CLAIR RANCH RD3 of 6$2,105,271+5.0%
25 SEP 2019T4527District 4SEMINOLE DR4 of 6$1,794,092+34%
28 AUG 2019T4523District 4SR 5 (US 1)6 of 8$9,598,911+17%
28 AUG 2019T6485District 6SR 5 (US 1)9 of 9$11,606,289+74%
31 JUL 2019T6464District 6HIALEAH GARDENS BLVD3 of 4$3,397,303+24%
24 APR 2019T6424District 6SR 997 (KROME AVE)3 of 5$32,725,594+3.0%
27 MAR 2019T4505District 4NW 21ST AVE; BRIDGE NO. 8640661 of 5$7,195,336Low, 2.0% under the second
27 FEB 2019T4500District 4NE 23RD AVE2 of 3$2,485,3420.0%
30 JAN 2019T4499District 4SR A1A1 of 7$5,385,476Low, 1.0% under the second
30 JAN 2019T6445District 6NW 34TH AVE1 of 4$1,196,727Low, 3.0% under the second
05 DEC 2018T6441District 6SR 94 (SW 88 ST) (N KENDALL DR)6 of 11$3,558,504+13%
26 SEP 2018T5641District 5SR A1A6 of 8$28,777,034+28%
13 JUN 2018T6442District 6SR 847 (NW 47 AVE)5 of 7$13,755,700+7.0%
23 MAY 2018T6422District 6SR 997 (KROME AVE) (SW 177TH AVE)3 of 9$37,815,223+1.0%
25 APR 2018T4459District 4SR 76 of 8$57,703,800+17%
Condotte America, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy