Condotte America, Inc.: FDOT bid record
Condotte America, Inc. submitted 25 bids on Florida DOT contracts in the data, from 25 APR 2018 to 22 FEB 2023, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $39,908,786
- Latest bid
- 22 FEB 2023
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 0 | 0% |
| 2019 | 10 | 3 | 30% |
| 2020 | 6 | 1 | 17% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 13 | 2 | 15% |
| District 6 | 10 | 1 | 10% |
| District 5 | 1 | 0 | 0% |
| District 1 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Type B stabilization | 0160-4 | SY | 21 | 11 (52%) | $4.00 | $15.00 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 9 | 9 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 9 | 9 (100%) | $4,500.00 | $4,500.00 |
| Regular excavation | 0120-1 | CY | 22 | 7 (32%) | $10.00 | $25.47 |
| Detectable warnings | 0527-2 | SF | 20 | 7 (35%) | $25.23 | $35.00 |
| Sediment barrier | 0104-10-3 | LF | 22 | 6 (27%) | $1.60 | $2.60 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 20 | 5 (25%) | $40.00 | $65.00 |
| Litter removal | 0107-1 | ACRE | 18 | 5 (28%) | $32.55 | $52.98 |
| Miscellaneous asphalt | 0339-1 | TN | 17 | 5 (29%) | $230.00 | $375.00 |
| Floating turbidity barrier | 0104-11 | LF | 17 | 5 (29%) | $12.00 | $15.92 |
| Traffic control officer | 0102-14 | HR | 14 | 5 (36%) | $60.00 | $80.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 25 | 4 (16%) | $0.13 | $0.13 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lead Engineering Contractors, LLC | 12 | 3 of 12 |
| Halley Engineering Contractors, Inc. | 12 | 5 of 12 |
| Ranger Construction Industries, Inc. | 9 | 4 of 9 |
| Weekley Asphalt Paving, Inc. | 9 | 4 of 9 |
| Jva Engineering Contractor, Inc | 8 | 4 of 8 |
| General Asphalt Company, LLC | 7 | 6 of 7 |
| Community Asphalt Corp. | 5 | 1 of 5 |
| Roadway Construction, LLC | 5 | 4 of 5 |
| H & R Paving, Inc. | 5 | 3 of 5 |
| Ferreira Construction Co., Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 FEB 2023 | T4633 | District 4 | SR 9 (I-95) | 3 of 6 | $19,761,175 | +10% |
| 26 JAN 2022 | T4595 | District 4 | SR 817 (UNIVERSITY DR) | 6 of 9 | $13,999,557 | +24% |
| 12 JAN 2022 | T4583 | District 4 | SR A1A (NORTH CAUSEWAY) | 6 of 7 | $126,856,032 | +14% |
| 27 OCT 2021 | T6511 | District 6 | SR 25 (OKEECHOBEE RD) | 3 of 5 | $119,754,499 | +13% |
| 18 NOV 2020 | T1035 | District 1 | SR 400 (I-4) | 1 of 6 | $26,131,247 | Low, 12% under the second |
| 26 AUG 2020 | T6505 | District 6 | SR 94 (KENDALL DR/SW 88 ST) | 11 of 14 | $5,094,585 | +11% |
| 29 JUL 2020 | T6507 | District 6 | SR 90/SW 8TH ST | 3 of 12 | $1,569,717 | +2.0% |
| 20 MAY 2020 | T4552 | District 4 | SR 9 (I-95) | 4 of 6 | $29,239,932 | +11% |
| 25 MAR 2020 | T4539 | District 4 | SR 93/SR 84 | 5 of 9 | $7,327,996 | +3.0% |
| 26 FEB 2020 | T4534 | District 4 | ROCK ISLAND RD | 10 of 11 | $1,578,000 | +27% |
| 25 SEP 2019 | T4526 | District 4 | EL CLAIR RANCH RD | 3 of 6 | $2,105,271 | +5.0% |
| 25 SEP 2019 | T4527 | District 4 | SEMINOLE DR | 4 of 6 | $1,794,092 | +34% |
| 28 AUG 2019 | T4523 | District 4 | SR 5 (US 1) | 6 of 8 | $9,598,911 | +17% |
| 28 AUG 2019 | T6485 | District 6 | SR 5 (US 1) | 9 of 9 | $11,606,289 | +74% |
| 31 JUL 2019 | T6464 | District 6 | HIALEAH GARDENS BLVD | 3 of 4 | $3,397,303 | +24% |
| 24 APR 2019 | T6424 | District 6 | SR 997 (KROME AVE) | 3 of 5 | $32,725,594 | +3.0% |
| 27 MAR 2019 | T4505 | District 4 | NW 21ST AVE; BRIDGE NO. 864066 | 1 of 5 | $7,195,336 | Low, 2.0% under the second |
| 27 FEB 2019 | T4500 | District 4 | NE 23RD AVE | 2 of 3 | $2,485,342 | 0.0% |
| 30 JAN 2019 | T4499 | District 4 | SR A1A | 1 of 7 | $5,385,476 | Low, 1.0% under the second |
| 30 JAN 2019 | T6445 | District 6 | NW 34TH AVE | 1 of 4 | $1,196,727 | Low, 3.0% under the second |
| 05 DEC 2018 | T6441 | District 6 | SR 94 (SW 88 ST) (N KENDALL DR) | 6 of 11 | $3,558,504 | +13% |
| 26 SEP 2018 | T5641 | District 5 | SR A1A | 6 of 8 | $28,777,034 | +28% |
| 13 JUN 2018 | T6442 | District 6 | SR 847 (NW 47 AVE) | 5 of 7 | $13,755,700 | +7.0% |
| 23 MAY 2018 | T6422 | District 6 | SR 997 (KROME AVE) (SW 177TH AVE) | 3 of 9 | $37,815,223 | +1.0% |
| 25 APR 2018 | T4459 | District 4 | SR 7 | 6 of 8 | $57,703,800 | +17% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.