| 0005 | Mobilization (0101-1) | LS | 1 | $72,438 | $220,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $51,967 | $5,000.00 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $72,315 | $220,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $86,048 | $5,000.00 |
| 0025 | Work zone sign (0102-60) | ED | 4,500 | $0.31 | $0.32 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 51,300 | $0.12 | $0.12 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 300 | $6.28 | $6.44 |
| 0040 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 937 | $4.18 | $4.29 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 649 | $11.59 | $11.88 |
| 0050 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 150 | $47.21 | $48.40 |
| 0055 | Sediment barrier (0104-10-3) | LF | 172 | $9.12 | $5.50 |
| 0060 | Litter removal (0107-1) | ACRE | 104.47 | $1.00 | $1.10 |
| 0065 | Mowing (0107-2) | ACRE | 97.44 | $1.00 | $1.10 |
| 0070 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 78,648 | $3.06 | $3.92 |
| 0075 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 33,485 | $2.52 | $2.03 |
| 0080 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 8,648 | $135.01 | $164.33 |
| 0085 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 9,251 | $153.50 | $158.71 |
| 0090 | Performance turf, sod (0570-1-2) | SY | 17,304 | $4.11 | $6.57 |
| 0095 | Shoulder drop off soil (0570-13-1) | CY | 2,793.30 | $40.98 | $1.10 |
| 0100 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 11.32 | $2,038.51 | $2,090.00 |
| 0105 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 865 | $1.72 | $1.76 |
| 0110 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.06 | $643.74 | $660.00 |
| 0115 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 10 | $42.92 | $44.00 |
| 0120 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.33 | $2,038.51 | $2,090.00 |
| 0125 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 5.09 | $531.08 | $544.50 |
| 0130 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $45,000 | $45,000 |
| 0135 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $5,000.00 | $5,000.00 |
| 0140 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 16.29 | $3,063.60 | $2,004.20 |
| 0145 | Raised pavement marker, type B (0706-1-3) | EACH | 937 | $4.18 | $4.29 |
| 0150 | Painted pavement markings, surface (0710-90) | LS | 1 | $71,011 | $72,805 |
| 0155 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 865 | $5.00 | $5.13 |
| 0160 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $1,897.96 | $1,945.90 |
| 0165 | Thermoplastic, standard, arrow (0711-11170) | EACH | 10 | $57.94 | $59.40 |
| 0170 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 11.32 | $5,055.50 | $5,183.20 |
| 0175 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.33 | $5,055.50 | $5,183.20 |
| 0180 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 5.09 | $1,263.87 | $1,295.80 |
| 0185 | Conduit, furnish & install, open trench (0630-2-11) | LF | 809 | $10.09 | $20.44 |
| 0190 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 329 | $27.57 | $25.87 |
| 0195 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,332.54 | $973.59 |
| 0200 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $18,481 | $5,828.50 |
| 0205 | Electrical service wire, & install (0639-2-1) | LF | 172 | $17.49 | $16.50 |
| 0210 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $1,708.06 | $3,263.17 |
| 0215 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,484.83 | $2,501.25 |
| 0220 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,388 | $3.54 | $3.11 |
| 0225 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 6 | $11,314 | $11,093 |
| 0230 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 6 | $675.93 | $1,004.50 |