| 0005 | Mobilization (0101-1) | LS | 1 | $125,000 | $166,434 |
| 0010 | Mobilization (0101-1) | LS | 1 | $125,000 | $161,899 |
| 0015 | Mobilization (0101-1) | LS | 1 | $125,000 | $161,899 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $20,000 | $36,234 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $20,000 | $36,234 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $20,000 | $36,234 |
| 0035 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $5,000.00 | $7,078.74 |
| 0040 | Traffic control officer (0102-14) | HR | 104 | $65.00 | $106.19 |
| 0045 | Work zone sign (0102-60) | ED | 19,055 | $0.42 | $0.33 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 45,325 | $0.11 | $0.15 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 980 | $0.25 | $0.08 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 1,990 | $12.00 | $15.58 |
| 0065 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 370 | $38.00 | $56.63 |
| 0070 | Sediment barrier (0104-10-3) | LF | 1,607 | $5.00 | $3.72 |
| 0075 | Litter removal (0107-1) | ACRE | 10.07 | $60.00 | $102.12 |
| 0080 | Mowing (0107-2) | ACRE | 7.84 | $60.00 | $168.32 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $60,000 | $2,898.75 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $60,000 | $2,898.75 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $60,000 | $2,898.75 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 16 | $100.00 | $54.36 |
| 0105 | Regular excavation (0120-1) | CY | 56 | $50.00 | $212.37 |
| 0110 | Embankment (0120-6) | CY | 106 | $50.00 | $353.94 |
| 0115 | Concrete curb & gutter, type F (0520-1-10) | LF | 27 | $50.00 | $75.09 |
| 0120 | Concrete traffic separator, special- variable width (0520-70) | SY | 90 | $150.00 | $191.70 |
| 0125 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 158 | $90.00 | $78.39 |
| 0130 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 144 | $95.00 | $111.65 |
| 0135 | Detectable warnings (0527-2) | SF | 294 | $35.00 | $63.51 |
| 0140 | Performance turf, sod (0570-1-2) | SY | 796 | $10.00 | $11.24 |
| 0145 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $16,665 | $16,665 |
| 0150 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $16,665 | $16,665 |
| 0155 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $16,665 | $16,665 |
| 0160 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 19 | $720.00 | $736.19 |
| 0165 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 2 | $4,200.00 | $5,662.99 |
| 0170 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $60.00 | $70.79 |
| 0175 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 4 | $10,800 | $11,400 |
| 0180 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $1,200.00 | $1,698.90 |
| 0185 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 5 | $150.00 | $141.58 |
| 0190 | Object marker, type 1 (0705-10-1) | EACH | 3 | $240.00 | $454.46 |
| 0195 | Delineator, flexible tubular (0705-11-1) | EACH | 34 | $120.00 | $112.64 |
| 0200 | Raised pavement marker, type B (0706-1-3) | EACH | 51 | $7.00 | $11.33 |
| 0205 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,280.00 | $3,539.37 |
| 0210 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,280.00 | $7,078.74 |
| 0215 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,280.00 | $3,539.37 |
| 0220 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,406 | $7.00 | $7.08 |
| 0225 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 304 | $12.00 | $12.75 |
| 0230 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.02 | $7,200.00 | $6,370.96 |
| 0235 | Thermoplastic, standard, arrow (0711-11170) | EACH | 8 | $96.00 | $127.42 |
| 0240 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.14 | $7,200.00 | $6,370.91 |
| 0245 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,091 | $25.00 | $25.49 |
| 0250 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $360.00 | $353.95 |
| 0255 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 1 | $240.00 | $212.36 |
| 0260 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.12 | $9,600.00 | $12,034 |
| 0265 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.17 | $10,800 | $12,034 |
| 0270 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 1,288 | $15.00 | $4.25 |
| 0275 | Conduit, furnish & install, open trench (0630-2-11) | LF | 252 | $11.00 | $28.29 |
| 0280 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 13 | $1,881.00 | $1,937.65 |
| 0285 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 6,066 | $4.00 | $4.07 |
| 0290 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 3 | $6,548.00 | $1,967.89 |
| 0295 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 10' arm length (0715-61221) | EACH | 2 | $10,785 | $12,727 |
| 0300 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252) | EACH | 3 | $10,868 | $12,810 |
| 0305 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 4 | $16,533 | $14,098 |
| 0310 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 9 | $1,020.00 | $1,230.11 |
| 0315 | Itsfm location documentation- intersection (0611-2-1) | EACH | 2 | $3,200.00 | $3,539.37 |
| 0320 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,222 | $19.00 | $28.34 |
| 0325 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 862 | $44.00 | $70.79 |
| 0330 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $13,197 | $11,630 |
| 0335 | Span wire assembly, F&I, two point, diagonal (0634-4152) | PI | 1 | $12,000 | $12,094 |
| 0340 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $14,280 | $14,215 |
| 0345 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 74 | $1,881.00 | $1,899.77 |
| 0350 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 9 | $2,278.00 | $2,244.67 |
| 0355 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $5,400.00 | $7,420.82 |
| 0360 | Electrical service wire, & install (0639-2-1) | LF | 368 | $16.00 | $7.86 |
| 0365 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,895.00 | $2,005.77 |
| 0370 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $3,480.00 | $2,702.00 |
| 0375 | Prestressed concrete pole, type P-VIII (0641-2-18) | EACH | 4 | $34,806 | $17,380 |
| 0380 | Aluminum signals pole, (0646-1-11) | EACH | 21 | $3,509.00 | $3,436.80 |
| 0385 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 1 | $3,389.00 | $3,056.74 |
| 0390 | Steel strain pole, F&I, type PS- IX (0649-1-16) | EACH | 2 | $69,601 | $72,915 |
| 0395 | Steel mast arm assembly, and install, double arm 70'-70' (0649-21-20) | EACH | 1 | $141,378 | $139,784 |
| 0400 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 23 | $2,311.00 | $1,771.33 |
| 0405 | Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15) | AS | 1 | $2,234.00 | $2,639.82 |
| 0410 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 5 | $2,657.00 | $2,236.13 |
| 0415 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 3 | $3,247.00 | $2,974.68 |
| 0420 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 20 | $1,326.00 | $1,157.52 |
| 0425 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $2,242.00 | $2,284.96 |
| 0430 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 4 | $612.00 | $372.41 |
| 0435 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $1,686.00 | $1,908.33 |
| 0440 | Loop assembly, F&I, type F (0660-2106) | AS | 7 | $2,579.00 | $2,721.85 |
| 0445 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $13,633 | $11,294 |
| 0450 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 6 | $12,694 | $12,709 |
| 0455 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $33,451 | $31,428 |
| 0460 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 3 | $7,243.00 | $16,322 |
| 0465 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 3 | $11,028 | $12,814 |
| 0470 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 11 | $4,943.00 | $6,150.72 |
| 0475 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 22 | $540.00 | $444.39 |
| 0480 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 3 | $50,366 | $48,704 |
| 0485 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 3 | $9,240.00 | $6,374.69 |
| 0490 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 3 | $8,745.00 | $5,896.88 |
| 0495 | Wireless communication device, furnish & install ethernet subscriber unit (0684-6-12) | EACH | 3 | $3,954.00 | $13,445 |
| 0500 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 3 | $14,597 | $10,197 |
| 0505 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $1,402.00 | $1,090.67 |
| 0510 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 6 | $1,560.00 | $1,262.26 |
| 0515 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 1 | $5,530.00 | $6,557.94 |
| 0520 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 1 | $6,950.00 | $7,748.13 |