FDOT contract T1926 bid tabulation
SR 93 (I-75) AT CR 876 (DANIELS PKWY). Let by Florida DOT on May 28, 2025, Lee, District 1. 5 bids received; low bid $42,887,838 by Watson Civil Construction, Inc..
- Owner
- Florida DOT
- Letting
- 28 MAY 2025
- Pay items
- 302
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Watson Civil Construction, Inc. | $42,887,838 | Low |
| 2 | Ohla USA Inc | $43,119,289 | +1.0% |
| 3 | Ajax Paving Industries of Florida LLC | $44,443,327 | +4.0% |
| 4 | Wright Construction Group, Inc. | $44,545,308 | +4.0% |
| 5 | Sacyr Construccion Sa | $50,947,532 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Watson Civil Construction, Inc. | 2. Ohla USA Inc | 3. Ajax Paving Industries of Florida LLC | 4. Wright Construction Group, Inc. | 5. Sacyr Construccion Sa |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $4,288,000 | $4,200,000 | $3,934,489 | $4,722,133 | $5,000,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $1,500,000 | $2,698,866 | $2,713,359 | $1,772,191 | $2,500,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $500,000 | $2,250,000 | $811,552 | $899,594 | $1,800,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $991,701 | $250,000 | $584,409 | $899,650 | $600,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $70,000 | $50,000 | $75,758 | $74,660 | $200,000 |
| 0030 | Traffic control officer (0102-14) | HR | 1,944 | $140.00 | $70.00 | $121.80 | $95.00 | $100.00 |
| 0035 | Temporary highway lighting (0102-30) | EACH | 1 | $500,000 | $100,000 | $547,216 | $115,065 | $750,000 |
| 0040 | Work zone sign (0102-60) | ED | 105,191 | $0.40 | $0.20 | $0.22 | $0.19 | $0.20 |
| 0045 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 15,971 | $50.00 | $39.00 | $44.37 | $38.25 | $51.00 |
| 0050 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 15,979 | $20.00 | $16.00 | $17.98 | $15.50 | $20.10 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 165,625 | $0.15 | $0.10 | $0.10 | $0.09 | $0.10 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 8,000 | $0.12 | $0.05 | $0.12 | $0.04 | $0.10 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,932 | $6.00 | $5.00 | $5.51 | $5.00 | $6.00 |
| 0070 | Temporary crash cushion, redirective option (0102-89-1) | LO | 12 | $1,200.00 | $1,500.00 | $1,264.43 | $1,090.00 | $1,000.00 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 13,696 | $15.00 | $9.00 | $11.54 | $9.00 | $10.00 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,238 | $66.00 | $26.00 | $143.84 | $25.00 | $60.00 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,876 | $44.00 | $26.00 | $28.42 | $25.00 | $40.00 |
| 0090 | Existing ITS maintenance (0102-112) | DA | 800 | $15.00 | $26.00 | $382.81 | $25.00 | $180.00 |
| 0095 | Type III barricade (0102-115) | ED | 2,815 | $0.35 | $0.25 | $0.45 | $0.23 | $0.30 |
| 0100 | Portable regulatory, sign (0102-150-1) | ED | 3,200 | $5.00 | $4.00 | $4.64 | $4.00 | $5.00 |
| 0105 | Radar speed display unit (0102-150-2) | ED | 3,200 | $5.00 | $4.50 | $4.64 | $4.50 | $5.00 |
| 0110 | Sediment barrier (0104-10-3) | LF | 16,352 | $3.55 | $0.95 | $1.10 | $0.95 | $3.00 |
| 0115 | Floating turbidity barrier (0104-11) | LF | 496 | $15.00 | $11.50 | $13.34 | $11.50 | $18.00 |
| 0120 | Soil tracking prevention device (0104-15) | EACH | 4 | $3,500.00 | $10,000 | $13,998 | $6,033.47 | $6,000.00 |
| 0125 | Inlet protection system (0104-18) | EACH | 28 | $250.00 | $150.00 | $174.00 | $150.00 | $150.00 |
| 0130 | Litter removal (0107-1) | ACRE | 1,879.27 | $89.00 | $32.00 | $37.12 | $40.88 | $35.00 |
| 0135 | Mowing (0107-2) | ACRE | 1,519.22 | $35.00 | $76.00 | $88.16 | $57.73 | $35.00 |
| 0140 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,000.00 | $10,000 | $5,800.14 | $113,000 | $10,000 |
| 0145 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $13,000 | $10,000 | $17,400 | $63,000 | $10,000 |
| 0150 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $1,050,403 | $3,500,000 | $858,405 | $1,235,389 | $2,836,669 |
| 0155 | Removal of existing concrete (0110-4-10) | SY | 2,670 | $30.00 | $30.00 | $105.20 | $90.69 | $40.00 |
| 0160 | Plugging water wells, non- artesian (0110-6) | EACH | 1 | $5,500.00 | $0.01 | $2,900.07 | $35,000 | $10,000 |
| 0165 | Regular excavation (0120-1) | CY | 91,559 | $20.00 | $12.00 | $13.76 | $11.86 | $20.00 |
| 0170 | Subsoil excavation (0120-4) | CY | 33,430 | $30.00 | $17.50 | $20.10 | $25.20 | $24.00 |
| 0175 | Embankment (0120-6) | CY | 79,830 | $15.00 | $11.75 | $13.41 | $23.12 | $30.00 |
| 0180 | Type B stabilization (0160-4) | SY | 63,865 | $12.00 | $10.40 | $11.91 | $15.28 | $16.00 |
| 0185 | Optional base, base group 01 (0285-701) | SY | 2,624 | $25.00 | $29.00 | $33.19 | $29.26 | $16.00 |
| 0190 | Optional base, base group 05 (0285-705) | SY | 12,599 | $26.00 | $36.00 | $41.36 | $36.30 | $34.00 |
| 0195 | Optional base, base group 08 (0285-708) | SY | 4,579 | $30.00 | $41.00 | $46.23 | $40.50 | $36.00 |
| 0200 | Optional base, base group 09 (0285-709) | SY | 4,053 | $32.00 | $45.00 | $50.48 | $44.17 | $48.00 |
| 0205 | Optional base, base group 11 (0285-711) | SY | 4,318 | $35.00 | $49.00 | $56.12 | $49.03 | $70.00 |
| 0210 | Optional base, base group 12 (0285-712) | SY | 33,886 | $40.00 | $42.00 | $48.30 | $42.29 | $44.00 |
| 0215 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 48,329 | $3.00 | $7.21 | $5.12 | $5.30 | $7.00 |
| 0220 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 39,796 | $4.00 | $7.21 | $4.01 | $4.15 | $8.00 |
| 0225 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 2,245 | $9.00 | $7.21 | $6.52 | $6.80 | $10.00 |
| 0230 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 238.30 | $205.00 | $150.00 | $267.34 | $806.42 | $285.00 |
| 0235 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 11,686.30 | $202.00 | $147.00 | $178.31 | $197.87 | $210.00 |
| 0240 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 2,160 | $212.00 | $185.00 | $197.93 | $265.07 | $220.00 |
| 0245 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 8,081.80 | $212.00 | $140.00 | $203.46 | $228.73 | $220.00 |
| 0250 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 2,179 | $325.00 | $200.00 | $297.33 | $385.22 | $325.00 |
| 0255 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 5,792.30 | $225.00 | $180.00 | $199.56 | $237.77 | $200.00 |
| 0260 | Miscellaneous asphalt (0339-1) | TN | 117 | $400.00 | $750.00 | $332.40 | $351.55 | $350.00 |
| 0265 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 197.60 | $1,500.00 | $815.00 | $928.02 | $730.00 | $1,700.00 |
| 0275 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 21 | $8,100.00 | $11,500 | $10,672 | $9,000.00 | $14,000 |
| 0280 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 6 | $10,000 | $11,000 | $11,693 | $10,080 | $12,000 |
| 0285 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $10,000 | $10,800 | $12,760 | $11,000 | $12,000 |
| 0290 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 3 | $7,500.00 | $12,200 | $5,359.33 | $4,620.00 | $13,000 |
| 0295 | Inlets, DT bot, type E, modify (0425-1559) | EACH | 4 | $15,000 | $19,000 | $17,110 | $14,750 | $16,000 |
| 0300 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 2 | $9,500.00 | $14,000 | $8,108.60 | $6,990.00 | $14,000 |
| 0305 | Inlets, median barrier, type 1, <=10' (0425-1781) | EACH | 1 | $30,000 | $20,000 | $32,481 | $18,726 | $18,000 |
| 0310 | Inlets, closed flume (0425-1910) | EACH | 13 | $9,000.00 | $5,200.00 | $7,540.18 | $5,100.00 | $15,000 |
| 0315 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $7,500.00 | $12,600 | $8,745.45 | $7,539.00 | $12,000 |
| 0320 | Manholes, P-8, <10' (0425-2-61) | EACH | 2 | $7,000.00 | $14,800 | $7,250.18 | $6,250.00 | $14,000 |
| 0325 | Manholes, J-7, <10' (0425-2-71) | EACH | 2 | $10,200 | $14,100 | $11,762 | $10,139 | $12,000 |
| 0330 | Manholes, J-7, partial (0425-2-73) | EACH | 1 | $5,600.00 | $11,600 | $2,958.07 | $2,550.00 | $12,000 |
| 0335 | Pipe culvert optional material, round, 15", gutter drain (0430-173115) | LF | 4 | $150.00 | $420.00 | $823.62 | $710.00 | $400.00 |
| 0340 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 392 | $185.00 | $190.00 | $158.15 | $136.33 | $190.00 |
| 0345 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 35 | $215.00 | $235.00 | $258.22 | $222.60 | $220.00 |
| 0350 | Pipe culvert, optional material, other shape - ellip/arch, 30"SD (0430-174230) | LF | 56 | $330.00 | $315.00 | $362.96 | $312.89 | $300.00 |
| 0355 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 73 | $120.00 | $147.00 | $104.40 | $90.00 | $150.00 |
| 0360 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,545 | $150.00 | $150.00 | $166.89 | $143.87 | $190.00 |
| 0365 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 1,325 | $160.00 | $175.00 | $257.99 | $222.40 | $200.00 |
| 0370 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 220 | $180.00 | $195.00 | $363.20 | $313.10 | $200.00 |
| 0375 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 254 | $380.00 | $330.00 | $521.43 | $449.50 | $320.00 |
| 0380 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 564 | $160.00 | $178.00 | $232.47 | $200.40 | $220.00 |
| 0385 | Pipe culvert,optional material,round, jack & bore, 48", storm and cross drain (0430-185148) | LF | 62 | $2,290.00 | $6,100.00 | $3,048.55 | $2,628.00 | $6,500.00 |
| 0390 | U-endwall, index 261/430-011, baffles, 1:6 slope, 18"pipe (0430-611025) | EACH | 3 | $2,800.00 | $3,600.00 | $7,703.75 | $6,641.00 | $8,000.00 |
| 0395 | U-endwall, index 261/430-011, baffles, 1:6 slope, 24"pipe (0430-611029) | EACH | 5 | $4,000.00 | $3,900.00 | $8,283.76 | $7,141.00 | $8,000.00 |
| 0400 | U-endwall with baffles, index 261/430-011, 1:2 slope, 18"pipe (0430-611325) | EACH | 1 | $3,200.00 | $3,350.00 | $5,162.13 | $4,450.00 | $12,000 |
| 0405 | Mitered end section, optional round, 15" CD (0430-982123) | EACH | 1 | $2,900.00 | $10,000 | $2,271.34 | $1,958.00 | $10,000 |
| 0410 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $3,000.00 | $8,400.00 | $2,850.19 | $2,457.00 | $10,000 |
| 0415 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 9 | $6,000.00 | $8,725.00 | $3,492.85 | $3,011.00 | $10,000 |
| 0420 | Mitered end section, optional - elliptical / arch, 18" CD (0430-982625) | EACH | 1 | $5,300.00 | $10,375 | $3,178.48 | $2,740.00 | $10,000 |
| 0425 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 1 | $3,100.00 | $8,400.00 | $2,838.59 | $2,447.00 | $8,000.00 |
| 0430 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 2 | $3,500.00 | $9,200.00 | $3,469.64 | $2,991.00 | $9,000.00 |
| 0435 | Mitered end section , optional round, 42" SD (0430-984140) | EACH | 1 | $15,000 | $19,000 | $16,543 | $14,261 | $16,000 |
| 0440 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 2 | $4,500.00 | $11,000 | $7,580.79 | $6,535.00 | $10,000 |
| 0445 | Mitered end sect, optional /ellip/arch, 30" SD (0430-984633) | EACH | 1 | $9,000.00 | $14,000 | $5,962.55 | $5,140.00 | $12,000 |
| 0450 | Prest soil anchors (0451-70) | EACH | 29 | $4,800.00 | $13,000 | $14,572 | $11,798 | $5,500.00 |
| 0455 | Prestressed soil anchor, performance test (0451-70-1) | EACH | 3 | $4.00 | $0.01 | $3.70 | $64,000 | $3,000.00 |
| 0460 | Prestressed soil anchor, test (0451-70-2) | EACH | 2 | $3.00 | $0.01 | $2.47 | $93,100 | $3,000.00 |
| 0465 | Soldier pile wall, permanent, with cast-in-place concrete fascia (0455-133208) | SF | 5,646 | $50.00 | $85.00 | $184.97 | $165.55 | $125.00 |
| 0470 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 610 | $120.00 | $125.00 | $92.80 | $86.00 | $125.00 |
| 0475 | Concrete curb & gutter, type E (0520-1-7) | LF | 2,771 | $64.00 | $27.50 | $25.52 | $27.00 | $55.00 |
| 0480 | Concrete curb & gutter, type F (0520-1-10) | LF | 9,387 | $44.00 | $24.50 | $19.14 | $24.00 | $48.00 |
| 0485 | Concrete curb, type D (0520-2-4) | LF | 193 | $43.00 | $22.30 | $20.88 | $22.00 | $30.00 |
| 0490 | Valley gutter- concrete (0520-3) | LF | 284 | $44.00 | $34.00 | $23.20 | $33.00 | $45.00 |
| 0495 | Shoulder gutter- concrete (0520-6) | LF | 338 | $40.00 | $31.00 | $39.44 | $30.00 | $45.00 |
| 0500 | Concrete traffic separator, special- variable width (0520-70) | SY | 491 | $170.00 | $130.00 | $83.52 | $130.00 | $170.00 |
| 0505 | Median concrete barrier, variable section width for sign or pier shielding (0521-1-14) | LF | 515 | $850.00 | $675.00 | $771.42 | $700.00 | $700.00 |
| 0510 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 244 | $333.00 | $350.00 | $400.21 | $700.00 | $375.00 |
| 0515 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 199 | $320.00 | $300.00 | $348.01 | $780.00 | $375.00 |
| 0520 | Shoulder concrete barrier, 56" pier protection barrier/crash wall (0521-72-56) | LF | 475 | $565.00 | $635.00 | $725.02 | $740.00 | $600.00 |
| 0525 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,337 | $60.00 | $47.00 | $60.32 | $46.00 | $60.00 |
| 0530 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 625 | $90.00 | $67.00 | $71.92 | $66.00 | $85.00 |
| 0535 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 42 | $200.00 | $85.00 | $76.56 | $84.00 | $150.00 |
| 0540 | Detectable warnings (0527-2) | SF | 364 | $43.00 | $32.50 | $40.60 | $32.00 | $35.00 |
| 0545 | Guardrail -roadway, general (0536-1-1) | LF | 1,786 | $26.00 | $25.00 | $29.54 | $25.50 | $30.00 |
| 0550 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 3 | $3,800.00 | $3,000.00 | $3,545.01 | $3,600.00 | $6,000.00 |
| 0555 | Guardrail removal (0536-73) | LF | 1,960 | $4.00 | $2.00 | $2.36 | $3.00 | $5.00 |
| 0560 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 5 | $1,700.00 | $2,000.00 | $2,245.17 | $1,700.00 | $3,000.00 |
| 0565 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 7 | $4,000.00 | $3,000.00 | $3,426.84 | $3,600.00 | $6,000.00 |
| 0570 | Crash cushion, TL-2, narrow (0544-2-1) | EACH | 1 | $18,800 | $25,000 | $24,941 | $31,500 | $30,000 |
| 0575 | Crash cushion, TL-3, wide (0544-3-2) | EACH | 1 | $13,000 | $35,000 | $34,221 | $37,300 | $48,800 |
| 0580 | Fencing, type A, 0.0-5.0', standard (0550-10110) | LF | 408 | $20.00 | $20.00 | $23.20 | $24.00 | $80.00 |
| 0585 | Fencing, type B, 5.1-6.0', W/ barb wire attmt (0550-10221) | LF | 75 | $31.00 | $30.00 | $69.60 | $72.00 | $130.00 |
| 0590 | Fence gate, type B, single, 0- 6.0' opening (0550-60211) | EACH | 1 | $2,000.00 | $1,850.00 | $2,900.07 | $1,520.00 | $3,938.52 |
| 0595 | Performance turf, sod (0570-1-2) | SY | 138,197 | $6.50 | $3.00 | $3.48 | $3.88 | $4.70 |
| 0600 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 3,164 | $11.00 | $3.00 | $6.38 | $3.88 | $6.00 |
| 0605 | Raised pavement marker, type B (0706-1-3) | EACH | 4,099 | $4.10 | $4.20 | $4.64 | $4.00 | $5.00 |
| 0610 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 22.88 | $2,440.00 | $2,500.00 | $2,784.07 | $2,400.00 | $2,500.00 |
| 0615 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 2.41 | $3,245.00 | $3,325.00 | $3,712.09 | $3,200.00 | $3,500.00 |
| 0620 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,145 | $1.85 | $1.90 | $2.09 | $1.80 | $2.00 |
| 0625 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 4,323 | $2.00 | $2.00 | $2.20 | $1.90 | $2.00 |
| 0630 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,092 | $2.05 | $2.10 | $2.32 | $2.00 | $3.00 |
| 0635 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 15.34 | $560.00 | $575.00 | $638.02 | $550.00 | $600.00 |
| 0640 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.33 | $785.00 | $800.00 | $899.02 | $775.00 | $800.00 |
| 0645 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 88 | $46.00 | $47.00 | $52.20 | $45.00 | $50.00 |
| 0650 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 332 | $46.00 | $47.00 | $52.20 | $45.00 | $50.00 |
| 0655 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 11.92 | $2,450.00 | $2,500.00 | $2,784.07 | $2,400.00 | $2,500.00 |
| 0660 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.13 | $735.00 | $750.00 | $899.02 | $775.00 | $1,000.00 |
| 0665 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0670 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 27 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0675 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0680 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $142,000 | $142,000 | $142,000 | $142,000 | $142,000 |
| 0685 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 1.80 | $5,200.00 | $9,700.00 | $11,265 | $4,950.00 | $10,000 |
| 0690 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 64 | $555.00 | $600.00 | $667.02 | $547.00 | $620.00 |
| 0695 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 12 | $1,600.00 | $1,700.00 | $2,604.26 | $1,567.00 | $1,800.00 |
| 0700 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 4 | $1,900.00 | $2,425.00 | $3,079.88 | $1,850.00 | $2,400.00 |
| 0705 | Single column ground sign assembly, remove (0700-1600) | EACH | 68 | $105.00 | $50.00 | $174.00 | $100.00 | $30.00 |
| 0710 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 1 | $5,500.00 | $5,900.00 | $12,076 | $5,399.00 | $7,000.00 |
| 0715 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $6,800.00 | $7,400.00 | $11,571 | $6,633.00 | $9,000.00 |
| 0720 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $13,600 | $17,250 | $16,113 | $13,385 | $16,000 |
| 0725 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 9 | $10,750 | $7,100.00 | $15,121 | $10,500 | $9,000.00 |
| 0730 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 3 | $1,250.00 | $1,250.00 | $2,119.37 | $1,200.00 | $1,000.00 |
| 0735 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 41 | $650.00 | $640.00 | $997.62 | $632.00 | $400.00 |
| 0740 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 4 | $1,300.00 | $1,240.00 | $1,121.75 | $1,225.00 | $800.00 |
| 0745 | Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203) | EACH | 1 | $2,300.00 | $2,250.00 | $1,879.25 | $2,231.00 | $4,000.00 |
| 0750 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 2 | $16,500 | $16,000 | $12,540 | $15,555 | $14,000 |
| 0755 | Sign panel, furnish & install overhead mount, 601 SF and greater (0700-3211) | EACH | 1 | $37,500 | $36,200 | $32,771 | $35,797 | $33,000 |
| 0760 | Sign panel, furnish & install overhead mount, 101-200 SF with lighting (0700-3294) | EACH | 4 | $13,500 | $12,500 | $10,059 | $12,397 | $15,000 |
| 0765 | Sign panel, furnish & install overhead mount, 301-400 SF with lighting (0700-3296) | EACH | 4 | $27,000 | $26,000 | $20,126 | $25,427 | $25,000 |
| 0770 | Sign panel, furnish & install overhead mount, 601 SF and greater with lighting (0700-3299) | EACH | 4 | $49,000 | $47,000 | $41,140 | $46,500 | $45,000 |
| 0775 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 2 | $550.00 | $265.00 | $580.01 | $500.00 | $4,000.00 |
| 0780 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 3 | $310.00 | $765.00 | $3,108.88 | $300.00 | $2,000.00 |
| 0785 | Sign panel, remove, 301-400 SF (0700-3608) | EACH | 1 | $1,100.00 | $3,500.00 | $4,657.51 | $1,000.00 | $3,000.00 |
| 0790 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 1 | $262,000 | $255,000 | $220,405 | $253,067 | $215,000 |
| 0795 | Overhead static sign furnish & install, span, 51-100 FT (0700-4125) | EACH | 3 | $312,000 | $300,000 | $290,007 | $295,369 | $315,000 |
| 0800 | Overhead static sign furnish & install, span, 101-150 (0700-4126) | EACH | 5 | $355,000 | $325,000 | $353,809 | $340,967 | $360,000 |
| 0805 | Overhead static sign deep foundation removal, cantilever (0700-4612) | EACH | 1 | $19,000 | $50,000 | $23,572 | $68,000 | $40,000 |
| 0810 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 18 | $64.00 | $110.00 | $67.28 | $63.00 | $65.00 |
| 0815 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 18 | $84.00 | $150.00 | $192.56 | $83.00 | $70.00 |
| 0820 | Tubular marker, 36" white post (0704-1-3) | EACH | 61 | $91.00 | $250.00 | $103.24 | $250.00 | $120.00 |
| 0825 | Raised pavement marker, type B (0706-1-3) | EACH | 3,518 | $4.10 | $4.20 | $4.64 | $4.00 | $5.00 |
| 0830 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 974 | $1.90 | $1.90 | $2.09 | $1.80 | $2.00 |
| 0835 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 67 | $5.10 | $5.20 | $5.80 | $5.00 | $6.00 |
| 0840 | Painted pavement markings, surface (0710-90) | LS | 1 | $70,000 | $60,000 | $98,418 | $84,841 | $80,000 |
| 0845 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 801 | $3.40 | $3.50 | $3.82 | $3.29 | $4.00 |
| 0850 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 4,146 | $5.10 | $5.20 | $5.74 | $4.95 | $6.00 |
| 0855 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 750 | $6.70 | $6.90 | $7.63 | $6.58 | $7.00 |
| 0860 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.18 | $2,550.00 | $2,600.00 | $2,900.07 | $2,500.00 | $2,600.00 |
| 0865 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 41 | $92.00 | $93.75 | $104.40 | $90.00 | $100.00 |
| 0870 | Thermoplastic, standard, arrow (0711-11170) | EACH | 195 | $92.00 | $93.75 | $104.40 | $90.00 | $100.00 |
| 0875 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 89 | $4.70 | $4.80 | $5.34 | $4.60 | $5.00 |
| 0880 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.01 | $2,825.00 | $40,000 | $2,900.07 | $2,500.00 | $3,000.00 |
| 0885 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 635 | $18.00 | $19.00 | $20.21 | $17.42 | $20.00 |
| 0890 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 23 | $245.00 | $250.00 | $278.41 | $240.00 | $250.00 |
| 0895 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 22 | $95.00 | $97.00 | $107.88 | $93.00 | $100.00 |
| 0900 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 12 | $2,050.00 | $2,075.00 | $2,299.18 | $1,982.00 | $2,200.00 |
| 0905 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 4.12 | $7,600.00 | $7,800.00 | $8,617.85 | $7,429.00 | $8,000.00 |
| 0910 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.36 | $10,100 | $11,000 | $11,490 | $9,905.00 | $12,000 |
| 0915 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 3.85 | $1,900.00 | $2,000.00 | $2,155.33 | $1,858.00 | $2,000.00 |
| 0920 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 1.80 | $7,100.00 | $7,225.00 | $8,059.88 | $6,948.00 | $7,000.00 |
| 0925 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 6.10 | $5,400.00 | $5,500.00 | $6,130.75 | $5,285.00 | $5,000.00 |
| 0930 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 1.17 | $7,100.00 | $7,300.00 | $8,143.40 | $7,020.00 | $7,000.00 |
| 0935 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.35 | $1,350.00 | $1,375.00 | $1,528.92 | $1,318.00 | $2,000.00 |
| 0940 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.06 | $2,190.00 | $5,000.00 | $2,900.07 | $2,500.00 | $2,000.00 |
| 0945 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.22 | $5,010.00 | $5,100.00 | $5,725.90 | $4,936.00 | $6,000.00 |
| 0950 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.09 | $57,000 | $75,000 | $65,181 | $56,189 | $60,000 |
| 0955 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.09 | $14,200 | $20,000 | $16,296 | $14,048 | $15,000 |
| 0960 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.05 | $50,000 | $75,000 | $65,181 | $56,189 | $50,000 |
| 0965 | Preformed/permanent tape, remove (0713-107) | SF | 1,125 | $1.75 | $1.80 | $1.97 | $1.70 | $2.00 |
| 0970 | Conduit, furnish & install, open trench (0630-2-11) | LF | 16,363 | $8.50 | $10.70 | $18.21 | $10.50 | $8.00 |
| 0975 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 7,057 | $28.00 | $32.00 | $22.85 | $31.30 | $28.00 |
| 0980 | Conduit, furnish & install, mount (0630-2-15) | LF | 354 | $29.00 | $30.50 | $56.09 | $29.90 | $28.00 |
| 0985 | Conduit, remove, bridge mount (0630-2-65) | LF | 400 | $4.60 | $7.50 | $30.04 | $7.30 | $5.00 |
| 0990 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 130 | $950.00 | $1,435.00 | $2,499.86 | $1,406.00 | $1,000.00 |
| 0995 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 56 | $1,250.00 | $1,525.00 | $3,142.52 | $1,492.00 | $1,200.00 |
| 1000 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $5,800.00 | $4,600.00 | $6,844.17 | $4,507.00 | $6,000.00 |
| 1005 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $3,300.00 | $1,700.00 | $3,897.70 | $1,658.00 | $3,500.00 |
| 1010 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $1,900.00 | $2,675.00 | $2,592.66 | $2,622.00 | $2,000.00 |
| 1015 | Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11) | LF | 4,508 | $1.52 | $1.70 | $1.97 | $1.60 | $2.00 |
| 1020 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 90,087 | $2.75 | $3.90 | $2.67 | $3.80 | $3.00 |
| 1025 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 13,777 | $6.00 | $5.40 | $4.81 | $5.30 | $6.00 |
| 1030 | Lighting conductors, F&I, no.1/0 3/0 (0 to 000) (0715-1-15) | LF | 237 | $22.00 | $10.30 | $9.45 | $10.00 | $22.00 |
| 1035 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 3,177 | $0.75 | $1.25 | $1.74 | $1.20 | $1.00 |
| 1040 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $24,000 | $23,850 | $18,398 | $25,371 | $25,000 |
| 1045 | Load center, remove, voltage (0715-7-41) | EACH | 2 | $910.00 | $1,115.00 | $2,308.46 | $1,094.00 | $1,000.00 |
| 1050 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 17 | $1,650.00 | $2,330.00 | $1,798.04 | $2,281.00 | $1,600.00 |
| 1055 | Luminaire, remove (0715-11500) | EACH | 4 | $200.00 | $730.00 | $450.03 | $714.00 | $200.00 |
| 1060 | High mast light pole, deep foundation removal (0715-19-63) | EACH | 10 | $13,000 | $22,400 | $25,057 | $21,952 | $13,000 |
| 1065 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 35 | $14,000 | $10,500 | $12,546 | $10,286 | $14,000 |
| 1070 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400) | EACH | 30 | $13,500 | $10,115 | $12,309 | $9,911.00 | $14,000 |
| 1075 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 8' arm length (0715-61411) | EACH | 11 | $13,400 | $10,020 | $11,734 | $9,818.00 | $14,000 |
| 1080 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 40 | $13,500 | $10,100 | $11,815 | $9,903.00 | $14,000 |
| 1085 | Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366) | EACH | 2 | $15,000 | $11,135 | $12,818 | $10,912 | $15,000 |
| 1090 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 118 | $800.00 | $675.00 | $854.94 | $661.00 | $800.00 |
| 1095 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,919 | $34.00 | $21.00 | $44.66 | $20.00 | $35.00 |
| 1100 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,230 | $92.00 | $71.00 | $65.66 | $69.00 | $100.00 |
| 1105 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $46,000 | $17,600 | $34,534 | $17,257 | $46,000 |
| 1110 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $1,400.00 | $4,000.00 | $1,745.84 | $3,892.00 | $2,000.00 |
| 1115 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 4 | $2,300.00 | $3,100.00 | $3,775.89 | $3,016.00 | $3,000.00 |
| 1120 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 116 | $1,350.00 | $1,525.00 | $2,229.57 | $1,492.00 | $1,500.00 |
| 1125 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,100.00 | $4,625.00 | $7,644.82 | $4,534.00 | $7,000.00 |
| 1130 | Electrical service wire, & install (0639-2-1) | LF | 369 | $20.00 | $13.00 | $19.37 | $12.70 | $20.00 |
| 1135 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,200.00 | $1,700.00 | $3,737.61 | $1,658.00 | $3,000.00 |
| 1140 | Emergency generator- permanent, UP to 25 KW (0639-5-1) | EACH | 1 | $90,000 | $71,000 | $146,338 | $69,475 | $100,000 |
| 1145 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $2,000.00 | $2,650.00 | $2,592.66 | $2,622.00 | $2,000.00 |
| 1150 | Prestressed concrete pole, type P-V (0641-2-15) | EACH | 2 | $14,000 | $18,700 | $12,296 | $18,322 | $30,000 |
| 1155 | Prestressed concrete pole, type P-VIII (0641-2-18) | EACH | 4 | $22,000 | $34,100 | $21,553 | $33,415 | $25,000 |
| 1160 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 2 | $950.00 | $880.00 | $464.01 | $863.00 | $1,000.00 |
| 1165 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 6 | $6,500.00 | $10,500 | $14,085 | $10,278 | $6,500.00 |
| 1170 | Aluminum signals pole, (0646-1-11) | EACH | 20 | $4,000.00 | $3,115.00 | $2,865.27 | $3,055.00 | $4,000.00 |
| 1175 | Aluminum signals pole, remove (0646-1-60) | EACH | 6 | $500.00 | $631.00 | $348.01 | $619.00 | $400.00 |
| 1180 | Steel strain pole, F&I, type PS- X (0649-1-17) | EACH | 2 | $77,000 | $80,000 | $73,969 | $77,555 | $80,000 |
| 1185 | Steel strain pole, remove, deep foundation removal, bolt on attachment (0649-1-65) | EACH | 2 | $13,000 | $23,000 | $15,979 | $22,446 | $14,000 |
| 1190 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 1 | $100,000 | $135,000 | $127,731 | $132,098 | $100,000 |
| 1195 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 3 | $120,000 | $150,000 | $148,832 | $147,130 | $120,000 |
| 1200 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $156,000 | $120,000 | $114,495 | $121,063 | $160,000 |
| 1205 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 3 | $162,000 | $175,000 | $182,838 | $180,138 | $170,000 |
| 1210 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 6 | $13,000 | $23,000 | $16,954 | $22,446 | $13,000 |
| 1215 | Loop detector inductive, F&I, type 11, 4 CH, SS, RM (0660-1111) | EACH | 7 | $1,565.00 | $1,025.00 | $1,084.63 | $1,005.00 | $2,000.00 |
| 1220 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $1,700.00 | $1,300.00 | $1,463.96 | $1,273.00 | $2,000.00 |
| 1225 | Loop assembly, F&I, type F (0660-2106) | AS | 28 | $2,120.00 | $1,735.00 | $1,740.04 | $1,701.00 | $2,500.00 |
| 1230 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 12 | $510.00 | $370.00 | $374.69 | $361.00 | $691.19 |
| 1235 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $550.00 | $2,100.00 | $1,095.07 | $2,052.00 | $600.00 |
| 1240 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $15,000 | $10,750 | $26,054 | $10,629 | $15,000 |
| 1245 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $45,500 | $32,600 | $36,889 | $31,957 | $45,000 |
| 1250 | Low voltage vehicular traffic signal - atc cabinet, F&I, 3 1 way (0923-650-14) | AS | 40 | $2,200.00 | $2,500.00 | $4,512.51 | $3,457.00 | $2,200.00 |
| 1255 | Low voltage pedestrian signal - atc cabinet, F&I, 1 way (0923-653-11) | AS | 12 | $1,200.00 | $1,750.00 | $2,784.07 | $1,718.00 | $1,200.00 |
| 1260 | Atc cabinet with controller, NEMA, size 3, 24"-27" W X 15"-17" D (0923-676101) | EACH | 1 | $145,000 | $96,600 | $92,721 | $94,635 | $140,000 |
| 1265 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 1270 | Utility pipe,remove & dispose, 49.9" (1050-16005) | LF | 2,806 | $140.00 | $82.00 | $59.16 | $57.03 | $100.00 |
| 1275 | Utility fixture, valve assembly, adjust/modify (1080-24500) | EACH | 2 | $1,500.00 | $4,625.00 | $1,682.04 | $1,450.00 | $1,935.35 |
| 1280 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.64 | $15,000 | $0.02 | $4,373.31 | $13,000 | $4,838.38 |
| 1285 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 7 | $450.00 | $0.01 | $2,807.27 | $4,000.00 | $2,764.78 |
| 1290 | Conduit, furnish & install, open trench (0630-2-11) | LF | 13,511 | $18.00 | $16.25 | $19.14 | $15.90 | $18.00 |
| 1295 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,663 | $52.00 | $43.00 | $39.67 | $42.20 | $52.00 |
| 1300 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 150 | $32.00 | $27.40 | $55.10 | $26.80 | $32.00 |
| 1305 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 7,217 | $4.00 | $3.50 | $4.76 | $3.40 | $4.00 |
| 1310 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 205 | $4.10 | $4.10 | $5.05 | $4.00 | $5.53 |
| 1315 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 5,849 | $4.60 | $5.70 | $5.63 | $5.60 | $5.00 |
| 1320 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 29,380 | $6.10 | $6.60 | $6.09 | $6.50 | $7.00 |
| 1325 | Fiber optic cable, remove, underground (0633-1620) | LF | 18,790 | $0.37 | $1.75 | $1.45 | $1.70 | $1.00 |
| 1330 | Fiber optic connection, install, splice (0633-2-31) | EACH | 812 | $61.00 | $160.00 | $66.12 | $158.00 | $75.00 |
| 1335 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 8 | $1,205.00 | $1,550.00 | $1,713.36 | $1,520.00 | $1,200.00 |
| 1340 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 67 | $102.00 | $55.00 | $73.08 | $53.00 | $138.24 |
| 1345 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 480 | $81.00 | $55.00 | $80.04 | $53.00 | $100.00 |
| 1350 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 8 | $1,600.00 | $510.00 | $1,655.36 | $498.00 | $1,600.00 |
| 1355 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 8 | $750.00 | $185.00 | $986.02 | $179.00 | $800.00 |
| 1360 | Fiber optic cable locator (0633-6) | DA | 800 | $31.00 | $30.00 | $261.01 | $29.00 | $32.00 |
| 1365 | Multi-conductor cable, furnish & install, composite (0633-8-12) | LF | 2,589 | $6.00 | $4.10 | $6.09 | $4.00 | $6.00 |
| 1370 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 30 | $930.00 | $1,435.00 | $1,404.79 | $1,406.00 | $1,000.00 |
| 1375 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 22 | $2,500.00 | $3,075.00 | $3,775.89 | $3,016.00 | $2,500.00 |
| 1380 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 8 | $4,500.00 | $5,900.00 | $7,847.59 | $5,785.00 | $4,500.00 |
| 1385 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 1 | $6,300.00 | $5,400.00 | $7,946.19 | $5,311.00 | $6,500.00 |
| 1390 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,900.00 | $5,400.00 | $7,061.09 | $5,773.00 | $6,000.00 |
| 1395 | Electrical service wire, & install (0639-2-1) | LF | 5,385 | $13.00 | $13.00 | $17.69 | $12.70 | $14.00 |
| 1400 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 7 | $2,700.00 | $1,700.00 | $2,857.15 | $1,658.00 | $3,000.00 |
| 1405 | Electrical service disconnect, F&I, cabinet (0639-3-12) | EACH | 2 | $2,700.00 | $1,700.00 | $2,857.15 | $1,658.00 | $3,000.00 |
| 1410 | Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121) | EACH | 6 | $3,300.00 | $2,475.00 | $3,045.07 | $2,427.00 | $3,500.00 |
| 1415 | Electrical power service- transformer, F&I, 26-50 kva, single phase, copper windings (0639-6151) | EACH | 1 | $24,000 | $9,725.00 | $21,310 | $9,517.00 | $25,000 |
| 1420 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $1,800.00 | $3,675.00 | $5,985.75 | $2,622.00 | $2,000.00 |
| 1425 | Prestressed concrete pole, type P-III (0641-2-13) | EACH | 3 | $7,800.00 | $15,350 | $10,893 | $15,019 | $8,000.00 |
| 1430 | Concrete CCTV pole, furnish & install with lowering device, (0641-3163) | EACH | 2 | $42,000 | $58,000 | $51,586 | $56,283 | $5,000.00 |
| 1435 | Concrete CCTV pole, complete pole removal (0641-3800) | EACH | 2 | $7,900.00 | $12,850 | $14,083 | $12,597 | $8,000.00 |
| 1440 | Vehicle detection system - microwave, remove, complete system (0660-3-60) | EACH | 3 | $550.00 | $3,025.00 | $1,417.55 | $2,968.00 | $600.00 |
| 1445 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 2 | $5,000.00 | $2,900.00 | $4,094.90 | $2,850.00 | $5,000.00 |
| 1450 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 2 | $10,500 | $11,700 | $11,229 | $11,389 | $12,000 |
| 1455 | Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22) | EACH | 2 | $88,000 | $54,500 | $97,866 | $53,398 | $90,000 |
| 1460 | Vehicle detection system- wrong way, remove (0660-7-90) | EACH | 2 | $4,850.00 | $6,300.00 | $5,669.06 | $6,186.00 | $5,000.00 |
| 1465 | Traffic data detection system- microwave, furnish and install, cabinet equipment (0660-8-11) | EACH | 6 | $13,000 | $9,300.00 | $8,833.62 | $9,119.00 | $14,000 |
| 1470 | Traffic data detection system- microwave, furnish and install, above ground equipment (0660-8-12) | EACH | 6 | $17,500 | $12,050 | $13,050 | $11,811 | $18,000 |
| 1475 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 5 | $10,900 | $10,300 | $10,092 | $10,042 | $12,000 |
| 1480 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 2 | $14,500 | $18,200 | $22,087 | $17,802 | $15,000 |
| 1485 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 4 | $7,900.00 | $7,250.00 | $8,737.33 | $7,068.00 | $8,000.00 |
| 1490 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 8 | $15,000 | $11,000 | $12,528 | $10,684 | $15,000 |
| 1495 | Device server, furnish & install (0684-2-1) | EACH | 4 | $1,500.00 | $1,200.00 | $1,313.15 | $1,158.00 | $2,000.00 |
| 1500 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 6 | $9,100.00 | $18,000 | $8,427.61 | $17,606 | $10,000 |
| 1505 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 7 | $1,400.00 | $1,200.00 | $1,661.16 | $1,158.00 | $1,500.00 |
| 1510 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $48.00 | $150.00 | $203.00 | $142.00 | $70.00 |
| 1515 | Enhanced hwy sign assembly, powered, F&I ground mount, W/highlighted sign 12-20 SF, 12-20 SF of static sign panels (0700-141152) | EACH | 8 | $11,000 | $145.00 | $8,503.01 | $11,289 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.