| 0005 | Mobilization (0101-1) | LS | 1 | $252,937 | $128,250 | $340,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $75,812 | $95,250 | $430,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $48,339 | $35,885 | $28,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $30,004 | $68,185 | $72,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 132.30 | $60.54 | $135.00 | $85.00 |
| 0030 | Traffic control officer (0102-14) | HR | 16 | $84.71 | $110.00 | $110.00 |
| 0035 | Work zone sign (0102-60) | ED | 25,318 | $0.05 | $0.50 | $0.60 |
| 0040 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 60 | $52.94 | $100.00 | $120.00 |
| 0045 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 60 | $52.94 | $50.00 | $59.00 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 87,060 | $0.03 | $0.11 | $0.15 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 401 | $1.06 | $1.00 | $1.20 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 30 | $15.89 | $15.00 | $18.00 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 2,270 | $5.00 | $20.00 | $24.00 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 320 | $5.00 | $10.00 | $18.00 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 320 | $5.00 | $10.00 | $18.00 |
| 0080 | Type III barricade (0102-115) | ED | 160 | $1.06 | $1.00 | $1.20 |
| 0085 | Radar speed display unit (0102-150-2) | ED | 160 | $1.00 | $15.00 | $18.00 |
| 0090 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 220 | $1.06 | $40.00 | $59.00 |
| 0095 | Sediment barrier (0104-10-3) | LF | 8,444 | $0.50 | $2.50 | $4.75 |
| 0100 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 332 | $0.50 | $15.00 | $11.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 32 | $158.83 | $175.00 | $280.00 |
| 0110 | Litter removal (0107-1) | ACRE | 866.78 | $5.30 | $40.00 | $41.00 |
| 0115 | Mowing (0107-2) | ACRE | 773.89 | $5.30 | $40.00 | $41.00 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $34,213 | $23,725 | $158,200 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 151 | $39.83 | $30.00 | $130.00 |
| 0130 | Mailbox, F&I single (0110-7-1) | EACH | 8 | $158.83 | $265.00 | $350.00 |
| 0135 | Borrow excavation, truck measure (0120-2-2) | CY | 620 | $20.00 | $20.00 | $54.00 |
| 0140 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $29,723 | $9,500.00 | $4,300.00 |
| 0145 | Optional base, base group 09 (0285-709) | SY | 13 | $519.25 | $100.00 | $150.00 |
| 0150 | Turnout base- optional materials (0286-1) | SY | 352 | $48.03 | $26.50 | $50.00 |
| 0155 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 99,558 | $0.75 | $1.50 | $2.70 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 20,493 | $1.00 | $2.00 | $2.30 |
| 0165 | Milling existing asphalt pavement, 5" avg depth (0327-70-10) | SY | 67,144 | $1.20 | $3.75 | $5.95 |
| 0170 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 4,771 | $0.50 | $2.75 | $7.20 |
| 0175 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 23,593.20 | $125.50 | $132.25 | $162.00 |
| 0180 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 16,493.40 | $109.15 | $135.75 | $169.50 |
| 0185 | Miscellaneous asphalt (0339-1) | TN | 629.30 | $323.67 | $200.00 | $240.00 |
| 0190 | Concrete, class I (seal) (0400-1-30) | CY | 0.40 | $37,061 | $17,500 | $35,000 |
| 0195 | Manhole, adjust, utilities (0425-5-1) | EACH | 10 | $2,079.03 | $1,350.00 | $2,200.00 |
| 0200 | Valve boxes, adjust (0425-6) | EACH | 1 | $2,079.03 | $1,100.00 | $1,900.00 |
| 0205 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 48 | $107.52 | $115.00 | $95.00 |
| 0210 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $2,675.68 | $2,500.00 | $2,200.00 |
| 0215 | Concrete curb & gutter, type F (0520-1-10) | LF | 142 | $104.39 | $65.00 | $76.00 |
| 0220 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 19 | $177.69 | $115.00 | $290.00 |
| 0225 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 112 | $131.36 | $140.00 | $140.00 |
| 0230 | Detectable warnings (0527-2) | SF | 85 | $55.44 | $40.00 | $66.00 |
| 0235 | Guardrail -roadway, general (0536-1-1) | LF | 6,693 | $26.48 | $25.00 | $30.00 |
| 0240 | Special guardrail post- deep post for slope break timber or steel (0536-7-1) | EACH | 51 | $105.89 | $100.00 | $120.00 |
| 0245 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 11 | $105.89 | $100.00 | $120.00 |
| 0250 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 1 | $3,073.34 | $2,910.00 | $3,400.00 |
| 0255 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 1 | $3,176.69 | $3,015.00 | $3,500.00 |
| 0260 | Guardrail removal (0536-73) | LF | 5,763 | $2.12 | $2.00 | $2.35 |
| 0265 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 4 | $2,117.79 | $2,000.00 | $2,400.00 |
| 0270 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 34 | $2,647.24 | $2,500.00 | $3,000.00 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 31,670 | $2.91 | $3.25 | $3.25 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 5,844 | $5.30 | $4.00 | $4.95 |
| 0285 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 22.81 | $1,058.89 | $1,250.00 | $1,500.00 |
| 0290 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 989 | $0.79 | $2.15 | $2.65 |
| 0295 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 60 | $1.06 | $2.35 | $2.90 |
| 0300 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,161 | $1.59 | $2.55 | $3.15 |
| 0305 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 4 | $21.18 | $55.00 | $68.00 |
| 0310 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 20.78 | $1,747.17 | $1,250.00 | $1,500.00 |
| 0315 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 17.63 | $953.00 | $650.00 | $800.00 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $84,032 | $84,032 | $84,032 |
| 0325 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 27.60 | $3,498.50 | $2,500.00 | $3,100.00 |
| 0330 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 34 | $502.97 | $475.00 | $560.00 |
| 0335 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,064.85 | $1,950.00 | $2,300.00 |
| 0340 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $158.83 | $150.00 | $180.00 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 33 | $52.94 | $50.00 | $59.00 |
| 0350 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 4 | $5,823.93 | $5,500.00 | $6,500.00 |
| 0355 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 6 | $529.45 | $500.00 | $590.00 |
| 0360 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 9 | $105.89 | $100.00 | $120.00 |
| 0365 | Object marker, type 1 (0705-10-1) | EACH | 3 | $317.67 | $300.00 | $350.00 |
| 0370 | Raised pavement marker, type B (0706-1-3) | EACH | 2,677 | $5.30 | $4.00 | $4.95 |
| 0375 | Painted pavement markings, surface (0710-90) | LS | 1 | $101,654 | $72,000 | $89,000 |
| 0380 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 695 | $4.24 | $4.25 | $5.25 |
| 0385 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 60 | $6.35 | $4.90 | $6.05 |
| 0390 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 577 | $8.47 | $6.15 | $7.60 |
| 0395 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 4 | $264.72 | $222.00 | $280.00 |
| 0400 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 353 | $16.94 | $11.50 | $14.00 |
| 0405 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 29 | $8.47 | $6.00 | $7.40 |
| 0410 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 294 | $8.47 | $8.00 | $9.90 |
| 0415 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 22.81 | $5,506.25 | $4,200.00 | $5,200.00 |
| 0420 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 10.39 | $5,506.25 | $4,115.00 | $5,100.00 |
| 0425 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 8.82 | $2,541.35 | $1,855.00 | $2,300.00 |
| 0430 | Conduit, furnish & install, open trench (0630-2-11) | LF | 9 | $16.94 | $100.00 | $21.00 |
| 0435 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 38 | $42.35 | $50.00 | $53.00 |
| 0440 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $6,082.30 | $10,000 | $7,500.00 |
| 0445 | Aluminum signals pole, (0646-1-11) | EACH | 3 | $3,176.69 | $3,500.00 | $3,900.00 |
| 0450 | Aluminum signals pole, (0646-1-40) | EACH | 1 | $1,058.89 | $2,000.00 | $1,300.00 |
| 0455 | Aluminum signals pole, remove (0646-1-60) | EACH | 3 | $211.77 | $500.00 | $260.00 |
| 0460 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 16 | $582.39 | $500.00 | $720.00 |
| 0465 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 2 | $1,588.34 | $1,500.00 | $2,000.00 |
| 0470 | Pedestrian signal, relocate (0653-1-40) | AS | 2 | $635.33 | $500.00 | $790.00 |
| 0475 | Loop assembly- F&I, type A (0660-2101) | AS | 2 | $1,694.23 | $3,000.00 | $2,100.00 |
| 0480 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 1 | $502.97 | $1,000.00 | $620.00 |
| 0485 | Pedestrian detector, relocate (0665-1-40) | EACH | 3 | $105.89 | $500.00 | $130.00 |
| 0490 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 4 | $158.83 | $300.00 | $200.00 |
| 0495 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $497.68 | $500.00 | $620.00 |
| 0500 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $79.42 | $200.00 | $99.00 |