FDOT contract T3964 bid tabulation

SR 2 FROM SR 77 TO W OF SPRING BRANCH BRIDGE. Let by Florida DOT on March 25, 2026, Jackson, District 3. 3 bids received; low bid $6,915,055 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
100
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$6,915,055Low
2Southeast Construction Company LLC$7,594,731+10%
3C.W. Roberts Contracting, Inc.$10,115,752+46%
FDOT contract T3964: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Southeast Construction Company LLC3. C.W. Roberts Contracting, Inc.
0005Mobilization (0101-1)LS1$252,937$128,250$340,000
0010Maintenance of traffic (0102-1)DA1$75,812$95,250$430,000
0015Special detour- temporary pavement (0102-2200)SY1$48,339$35,885$28,000
0020Special detour- temporary earthwork/base (0102-2300)CY1$30,004$68,185$72,000
0025Commercial material for temporary driveway maintenance (0102-3)CY132.30$60.54$135.00$85.00
0030Traffic control officer (0102-14)HR16$84.71$110.00$110.00
0035Work zone sign (0102-60)ED25,318$0.05$0.50$0.60
0040Temporary barrier, F&I, low profile, concrete (0102-71-13)LF60$52.94$100.00$120.00
0045Temporary barrier, relocate, low profile concrete (0102-71-23)LF60$52.94$50.00$59.00
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED87,060$0.03$0.11$0.15
0055Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD401$1.06$1.00$1.20
0060Arrow board / advance warning arrow panel (0102-76)ED30$15.89$15.00$18.00
0065Portable changeable message sign, temporary (0102-99)ED2,270$5.00$20.00$24.00
0070Temporary signalization and maintenance, intersection (0102-104)ED320$5.00$10.00$18.00
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED320$5.00$10.00$18.00
0080Type III barricade (0102-115)ED160$1.06$1.00$1.20
0085Radar speed display unit (0102-150-2)ED160$1.00$15.00$18.00
0090Temporary raised rumble per day, includes all sets and relocations (0102-909)DA220$1.06$40.00$59.00
0095Sediment barrier (0104-10-3)LF8,444$0.50$2.50$4.75
0100Staked turbidity barrier- nylon reinforced PVC (0104-12)LF332$0.50$15.00$11.00
0105Inlet protection system (0104-18)EACH32$158.83$175.00$280.00
0110Litter removal (0107-1)ACRE866.78$5.30$40.00$41.00
0115Mowing (0107-2)ACRE773.89$5.30$40.00$41.00
0120Clearing & grubbing (0110-1-1)ACRE1$34,213$23,725$158,200
0125Removal of existing concrete (0110-4-10)SY151$39.83$30.00$130.00
0130Mailbox, F&I single (0110-7-1)EACH8$158.83$265.00$350.00
0135Borrow excavation, truck measure (0120-2-2)CY620$20.00$20.00$54.00
0140Regular excavation (3-R projects only) (0120-71)LS1$29,723$9,500.00$4,300.00
0145Optional base, base group 09 (0285-709)SY13$519.25$100.00$150.00
0150Turnout base- optional materials (0286-1)SY352$48.03$26.50$50.00
0155Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY99,558$0.75$1.50$2.70
0160Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY20,493$1.00$2.00$2.30
0165Milling existing asphalt pavement, 5" avg depth (0327-70-10)SY67,144$1.20$3.75$5.95
0170Milling existing asphalt pavement, 1/2" avg depth (0327-70-16)SY4,771$0.50$2.75$7.20
0175Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN23,593.20$125.50$132.25$162.00
0180Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN16,493.40$109.15$135.75$169.50
0185Miscellaneous asphalt (0339-1)TN629.30$323.67$200.00$240.00
0190Concrete, class I (seal) (0400-1-30)CY0.40$37,061$17,500$35,000
0195Manhole, adjust, utilities (0425-5-1)EACH10$2,079.03$1,350.00$2,200.00
0200Valve boxes, adjust (0425-6)EACH1$2,079.03$1,100.00$1,900.00
0205Pipe culvert, optional material, round, 18"SD (0430-174118)LF48$107.52$115.00$95.00
0210Mitered end section, optional round, 18" SD (0430-984125)EACH2$2,675.68$2,500.00$2,200.00
0215Concrete curb & gutter, type F (0520-1-10)LF142$104.39$65.00$76.00
0220Concrete sidewalk and driveways, 4" thick (0522-1)SY19$177.69$115.00$290.00
0225Concrete sidewalk and driveways, 6" thick (0522-2)SY112$131.36$140.00$140.00
0230Detectable warnings (0527-2)SF85$55.44$40.00$66.00
0235Guardrail -roadway, general (0536-1-1)LF6,693$26.48$25.00$30.00
0240Special guardrail post- deep post for slope break timber or steel (0536-7-1)EACH51$105.89$100.00$120.00
0245Special guardrail post- post for shallow mount (0536-7-3)EACH11$105.89$100.00$120.00
0250Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH1$3,073.34$2,910.00$3,400.00
0255Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH1$3,176.69$3,015.00$3,500.00
0260Guardrail removal (0536-73)LF5,763$2.12$2.00$2.35
0265Guardrail end treatment- trailing anchorage (0536-85-20)EACH4$2,117.79$2,000.00$2,400.00
0270Guardrail end treatment- parallel approach terminal (0536-85-24)EACH34$2,647.24$2,500.00$3,000.00
0275Performance turf, sod (0570-1-2)SY31,670$2.91$3.25$3.25
0280Raised pavement marker, type B (0706-1-3)EACH5,844$5.30$4.00$4.95
0285Painted pavement markings, standard, white, solid, 6" (0710-11101)GM22.81$1,058.89$1,250.00$1,500.00
0290Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF989$0.79$2.15$2.65
0295Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF60$1.06$2.35$2.90
0300Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,161$1.59$2.55$3.15
0305Painted pavement markings, standard, white, message or symbol (0710-11160)EACH4$21.18$55.00$68.00
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM20.78$1,747.17$1,250.00$1,500.00
0315Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM17.63$953.00$650.00$800.00
0320Initial contingency amount, DO not bid (0999-25)LS1$84,032$84,032$84,032
0325Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM27.60$3,498.50$2,500.00$3,100.00
0330Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH34$502.97$475.00$560.00
0335Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$2,064.85$1,950.00$2,300.00
0340Single column ground sign assembly, relocate (0700-1500)EACH4$158.83$150.00$180.00
0345Single column ground sign assembly, remove (0700-1600)EACH33$52.94$50.00$59.00
0350Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112)EACH4$5,823.93$5,500.00$6,500.00
0355Multi-column ground sign assembly, remove (0700-2600)EACH6$529.45$500.00$590.00
0360Sign panel, relocate, UP to 12 SF (0700-3501)EACH9$105.89$100.00$120.00
0365Object marker, type 1 (0705-10-1)EACH3$317.67$300.00$350.00
0370Raised pavement marker, type B (0706-1-3)EACH2,677$5.30$4.00$4.95
0375Painted pavement markings, surface (0710-90)LS1$101,654$72,000$89,000
0380Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF695$4.24$4.25$5.25
0385Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF60$6.35$4.90$6.05
0390Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF577$8.47$6.15$7.60
0395Thermoplastic, standard, message or symbol (0711-11160)EACH4$264.72$222.00$280.00
0400Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF353$16.94$11.50$14.00
0405Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191)LF29$8.47$6.00$7.40
0410Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF294$8.47$8.00$9.90
0415Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM22.81$5,506.25$4,200.00$5,200.00
0420Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM10.39$5,506.25$4,115.00$5,100.00
0425Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM8.82$2,541.35$1,855.00$2,300.00
0430Conduit, furnish & install, open trench (0630-2-11)LF9$16.94$100.00$21.00
0435Conduit, furnish & install, directional bore (0630-2-12)LF38$42.35$50.00$53.00
0440Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$6,082.30$10,000$7,500.00
0445Aluminum signals pole, (0646-1-11)EACH3$3,176.69$3,500.00$3,900.00
0450Aluminum signals pole, (0646-1-40)EACH1$1,058.89$2,000.00$1,300.00
0455Aluminum signals pole, remove (0646-1-60)EACH3$211.77$500.00$260.00
0460Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH16$582.39$500.00$720.00
0465Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS2$1,588.34$1,500.00$2,000.00
0470Pedestrian signal, relocate (0653-1-40)AS2$635.33$500.00$790.00
0475Loop assembly- F&I, type A (0660-2101)AS2$1,694.23$3,000.00$2,100.00
0480Pedestrian detector, furnish & install, standard (0665-1-11)EACH1$502.97$1,000.00$620.00
0485Pedestrian detector, relocate (0665-1-40)EACH3$105.89$500.00$130.00
0490Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH4$158.83$300.00$200.00
0495Sign panel, relocate, UP to 12 SF (0700-3501)EACH1$497.68$500.00$620.00
0500Sign panel, remove, UP to 12 SF (0700-3601)EACH3$79.42$200.00$99.00
FDOT contract T3964: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy