| 0005 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 3,520 | $55.60 | $87.51 |
| 0010 | Polymer nosing for bridge expansion joint (0458-2) | CF | 701.80 | $790.00 | $897.52 |
| 0015 | Mobilization (0101-1) | LS | 1 | $653,000 | $650,281 |
| 0020 | Mobilization (0101-1) | LS | 1 | $43,700 | $50,000 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $217,000 | $316,843 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $32,800 | $74,246 |
| 0035 | Commercial material for temporary driveway maintenance (0102-3) | CY | 251.80 | $35.75 | $47.12 |
| 0040 | Traffic control officer (0102-14) | HR | 564 | $71.00 | $112.86 |
| 0045 | Work zone sign (0102-60) | ED | 58,265 | $0.40 | $0.42 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 146,041 | $0.01 | $0.10 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 8,120 | $0.15 | $0.17 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 565 | $11.00 | $11.22 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 2,909 | $20.00 | $17.82 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 9,605 | $22.00 | $11.22 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 9,605 | $35.00 | $26.00 |
| 0080 | Type III barricade (0102-115) | ED | 1,660 | $0.40 | $0.42 |
| 0085 | Inlet protection system (0104-18) | EACH | 303 | $101.00 | $207.88 |
| 0090 | Litter removal (0107-1) | ACRE | 1,522.49 | $74.25 | $89.10 |
| 0095 | Mowing (0107-2) | ACRE | 1,478.75 | $65.50 | $71.27 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 663 | $22.00 | $44.77 |
| 0105 | Optional base, base group 03 (0285-703) | SY | 270 | $42.00 | $49.25 |
| 0110 | Optional base, base group 11 (0285-711) | SY | 66 | $97.75 | $273.37 |
| 0115 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 23,427 | $0.85 | $0.83 |
| 0120 | Milling existing asphalt pavement, 5 1/4" avg depth (0327-70-9) | SY | 24,223 | $7.20 | $4.84 |
| 0125 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 190,449 | $1.55 | $1.16 |
| 0130 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 15,878 | $9.10 | $4.42 |
| 0135 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 7,129.30 | $147.50 | $170.88 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 24,037.20 | $156.00 | $159.70 |
| 0145 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 5 | $7,600.00 | $11,569 |
| 0150 | Inlets, curb, type P-4, <10' (0425-1341) | EACH | 1 | $8,150.00 | $13,021 |
| 0155 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $7,100.00 | $10,241 |
| 0160 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 1 | $5,500.00 | $8,817.02 |
| 0165 | Inlets, adjust (0425-4) | EACH | 11 | $480.00 | $3,327.92 |
| 0170 | Manhole, adjust (0425-5) | EACH | 47 | $3,100.00 | $3,862.28 |
| 0175 | Manhole, adjust, utilities (0425-5-1) | EACH | 10 | $3,100.00 | $3,809.81 |
| 0180 | Valve boxes, adjust (0425-6) | EACH | 8 | $420.00 | $1,544.33 |
| 0185 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 2 | $1,700.00 | $1,382.68 |
| 0190 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 419 | $212.50 | $91.62 |
| 0195 | Concrete curb & gutter, type F (0520-1-10) | LF | 520 | $66.00 | $41.57 |
| 0200 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 240 | $94.00 | $83.16 |
| 0205 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 292 | $112.75 | $106.92 |
| 0210 | Detectable warnings (0527-2) | SF | 564 | $26.00 | $26.93 |
| 0215 | Performance turf, sod (0570-1-2) | SY | 1,311 | $12.00 | $5.61 |
| 0220 | Raised pavement marker, type B (0706-1-3) | EACH | 8,696 | $4.90 | $5.05 |
| 0225 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 11.17 | $1,200.00 | $1,234.09 |
| 0230 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.15 | $5,200.00 | $5,609.49 |
| 0235 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 10,503 | $3.30 | $3.37 |
| 0240 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 211 | $4.35 | $4.49 |
| 0245 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 9,343 | $5.45 | $5.61 |
| 0250 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 29.53 | $980.00 | $1,009.71 |
| 0255 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.05 | $7,300.00 | $8,975.18 |
| 0260 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.31 | $2,200.00 | $2,243.80 |
| 0265 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 14 | $71.00 | $72.92 |
| 0270 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 249 | $49.00 | $50.49 |
| 0275 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.28 | $1,200.00 | $1,234.09 |
| 0280 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 694 | $4.35 | $4.49 |
| 0285 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 2.92 | $980.00 | $1,009.71 |
| 0290 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.31 | $2,100.00 | $2,243.80 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $128,854 | $128,854 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $9,913.80 | $9,913.80 |
| 0305 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 1 | $440.00 | $448.76 |
| 0310 | Single column ground sign assembly, remove (0700-1600) | EACH | 1 | $110.00 | $112.19 |
| 0315 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 3 | $330.00 | $336.57 |
| 0320 | Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204) | EACH | 1 | $2,700.00 | $2,804.74 |
| 0325 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $55.00 | $56.09 |
| 0330 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 1 | $550.00 | $560.95 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 4,348 | $4.90 | $5.05 |
| 0340 | Painted pavement markings, surface (0710-90) | LS | 1 | $110,000 | $112,406 |
| 0345 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.03 | $9,400.00 | $13,463 |
| 0350 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 10,503 | $4.35 | $4.49 |
| 0355 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 211 | $6.55 | $6.73 |
| 0360 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,647 | $8.75 | $8.98 |
| 0365 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.31 | $3,800.00 | $3,926.64 |
| 0370 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 14 | $160.00 | $168.28 |
| 0375 | Thermoplastic, standard, arrow (0711-11170) | EACH | 249 | $82.00 | $84.14 |
| 0380 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 694 | $6.55 | $6.73 |
| 0385 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.31 | $3,700.00 | $3,926.64 |
| 0390 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 6,696 | $13.00 | $13.46 |
| 0395 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 11.17 | $4,500.00 | $4,599.78 |
| 0400 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.12 | $13,000 | $13,463 |
| 0405 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 14.77 | $3,800.00 | $3,926.64 |
| 0410 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.05 | $11,000 | $13,463 |
| 0415 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.28 | $4,500.00 | $4,599.78 |
| 0420 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 2.92 | $3,800.00 | $3,926.64 |
| 0425 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 547 | $2.75 | $2.80 |
| 0430 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,022 | $22.00 | $22.44 |
| 0435 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 8,499 | $54.60 | $56.09 |
| 0440 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 9 | $11,000 | $11,219 |
| 0445 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 380 | $27.00 | $28.05 |
| 0450 | Fiber optic cable locator (0633-6) | DA | 565 | $220.00 | $224.38 |
| 0455 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 180 | $1,700.00 | $1,744.55 |
| 0460 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,700.00 | $2,804.74 |
| 0465 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 16 | $2,100.00 | $2,131.61 |
| 0470 | Steel mast arm assembly, and install on existing foundation, single arm 30' (0649-22-1) | EACH | 2 | $44,000 | $44,876 |
| 0475 | Steel mast arm assembly, remove, pole only- entire foundation remains (0649-26-1) | EACH | 2 | $8,700.00 | $8,975.18 |
| 0480 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 2 | $1,700.00 | $1,738.94 |
| 0485 | Vehicular traffic signal, furnish & install 5 section straight, 1 way (0650-1-38) | AS | 3 | $2,700.00 | $2,804.74 |
| 0490 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $110.00 | $112.19 |
| 0495 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 133 | $760.00 | $785.33 |
| 0500 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,600.00 | $1,682.85 |
| 0505 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 66 | $600.00 | $617.04 |
| 0510 | Loop assembly- F&I, type A (0660-2101) | AS | 169 | $2,184.00 | $2,243.80 |
| 0515 | Loop assembly, F&I, type B (0660-2102) | AS | 168 | $2,730.00 | $2,804.74 |
| 0520 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 19 | $1,100.00 | $1,121.90 |
| 0525 | Pedestrian detector, relocate (0665-1-40) | EACH | 5 | $550.00 | $560.95 |
| 0530 | Pedestrian detector, adjust/modify on existing pole (0665-1-50) | EACH | 1 | $440.00 | $448.76 |
| 0535 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 20 | $110.00 | $112.19 |
| 0540 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $330.00 | $336.57 |
| 0545 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 2 | $1,100.00 | $1,121.90 |
| 0550 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 12 | $160.00 | $168.28 |