IDOT contract 61K94 bid tabulation

Northlake, section 23-00102-00-TL. Let by Illinois DOT on January 17, 2025, Cook, District 01. 3 bids received; low bid $711,000 by R. W. Dunteman Company.

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
96
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1R. W. Dunteman Company$711,000Low
2Performance Construction and Engineering, LLC$808,014+14%
3Alliance Contractors, Inc.$812,750+14%
IDOT contract 61K94: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. R. W. Dunteman Company2. Performance Construction and Engineering, LLC3. Alliance Contractors, Inc.
1EM veh P S LSC 20 3C (X0324085)LF323$1.40$1.40$1.40
2Pres test & disinfect (X1200230)LS1$7,500.00$1,000.00$1,500.00
3Serv instl GR MT MTR (X1400150)EACH1$3,580.00$3,580.00$3,580.00
4Ped signal post 10 FT (X1400367)EACH2$1,531.00$3,062.00$1,531.00
5Ped signal post 5 FT (X1400378)EACH3$1,325.00$4,000.00$1,325.00
6Water main remov 12 (X5610712)LF20$48.00$53.00$48.00
7Cut & cap EX 6 WM (X5630006)EACH1$3,250.00$2,800.00$3,250.00
8Conn to EX W main 12 (X5630712)EACH2$7,650.00$7,500.00$7,650.00
9Conduit splice (X8100105)EACH2$755.00$755.00$755.00
10Fac T super P cab (X8570232)EACH1$25,062$28,000$25,062
11Uninter power sup SPL (X8620200)EACH1$4,948.00$5,000.00$4,948.00
12Accessible ped signal (X8760200)EACH8$1,874.00$2,000.00$1,874.00
13Conc FDN TY A 12D (X8780012)LF20$309.00$320.00$309.00
14LED SF lens cover (X8809005)EACH14$402.00$500.00$402.00
15Remv CBL from conduit (X8950508)LF345$0.50$0.50$0.50
16Construction layout (Z0013798)LS1$5,500.00$32,654$5,500.00
17Maint EX LTG sys (Z0033024)LS1$2,560.00$3,000.00$2,560.00
18Perm TR signal timing (Z0073509)EACH1$1,703.00$1,800.00$1,703.00
19Temp TR signal timing (Z0073510)EACH1$1,063.00$1,500.88$1,063.00
20Temporary fence (20101000)LF250$5.00$5.00$5.00
21Earth excavation (20200100)CY90$81.81$190.00$10.00
22Furnished excavation (20400800)CY10$69.40$50.00$10.00
23Trench backfill (20800150)CY45$96.00$100.00$96.00
24Topsoil F & P 4 (21101615)SY160$12.50$15.00$12.50
25Seeding CL 1A (25000110)ACRE0.25$3,500.00$5,000.00$3,500.00
26Erosion contr blanket (25100630)SY160$5.00$10.00$5.00
27Sub gran mat B (31101100)CY10$105.73$200.00$63.25
28Sub gran mat B 2 (31101180)SY160$9.44$22.00$3.50
29Sub gran mat B 4 (31101200)SY100$16.03$30.00$7.00
30Bit matls tack CT (40600290)LB70$5.00$0.01$1.00
31HMA SC IL-9.5 D N70 (40604062)TON10$235.83$1,700.00$1,300.00
32PC conc sidewalk 5 (42400200)SF1,470$9.02$18.00$25.00
33Detectable warnings (42400800)SF90$35.44$36.00$40.00
34Pavement rem (44000100)SY30$40.70$90.00$20.00
35HMA surf rem 2 (44000157)SY110$13.74$40.00$20.00
36Curb rem (44000300)LF30$24.35$60.00$15.00
37Comb curb gutter rem (44000500)LF210$16.06$25.00$15.00
38Sidewalk rem (44000600)SF1,700$3.08$5.00$2.00
39CL C patch T3 10 (44201357)SY70$150.57$205.00$231.00
40CL C patch T4 10 (44201359)SY40$141.75$210.00$231.00
41D I water main 6 (56103000)LF20$155.00$110.00$155.00
42D I water main 12 (56103300)LF20$500.00$215.00$500.00
43Fire hydnts to BE rem (56400500)EACH1$600.00$1,500.00$600.00
44Fire hyd W/aux V & VB (56400820)EACH1$11,330$12,000$11,330
45Conc curb TB (60600605)LF60$54.70$74.00$165.00
46Comb CC&G TB6.12 (60603800)LF210$45.86$89.00$175.00
47Mobilization (67100100)LS1$42,660$48,000$184,900
48TR cont & prot 701701 (70102635)LS1$64,000$17,000$5,000.00
49TR cont & prot 701801 (70102640)LS1$35,270$1,000.00$1.00
50Changeable message SN (70107025)CAL DAY120$87.74$50.00$35.00
51Sign panel T1 (72000100)SF12$37.50$40.00$37.50
52Sign panel T2 (72000200)SF35$45.00$40.00$45.00
53THPL PVT MK line 4 (78000200)LF30$3.25$5.00$3.25
54THPL PVT MK line 12 (78000600)LF450$7.05$12.00$7.05
55THPL PVT MK line 24 (78000650)LF110$13.65$24.00$13.65
56PVT MKG rem WTR blast (78300202)SF790$3.20$5.00$3.85
57Undrgrd C galvs 2 (81028200)LF857$25.10$25.10$25.10
58Undrgrd C galvs 3 (81028220)LF158$46.80$47.00$46.80
59Undrgrd C galvs 4 (81028240)LF466$82.90$83.00$82.90
60Undrgrd C CNC 1 1/2 (81028740)LF40$20.50$21.00$20.50
61Handhole (81400100)EACH5$2,315.00$2,350.00$2,315.00
62HD handhole (81400200)EACH2$3,825.00$3,900.00$3,825.00
63DBL handhole (81400300)EACH2$4,105.00$4,200.00$4,105.00
64EC C XLP use 1C 6 (81702130)LF435$2.40$2.40$2.40
65EC C XLP use 1C 4 (81702140)LF1,730$3.10$3.10$3.10
66Light pole FDN 24D (83600200)LF10$257.80$258.00$257.80
67Rem pole FDN (84200804)EACH1$320.00$320.00$320.00
68Reloc EX LT unit (84400105)EACH1$3,020.00$3,200.00$3,020.00
69Elcbl C signal 14 2C (87301215)LF1,422$1.70$1.70$1.70
70Elcbl C signal 14 3C (87301225)LF1,782$2.00$2.00$2.00
71Elcbl C signal 14 5C (87301245)LF2,151$2.40$2.40$2.40
72Elcbl C signal 14 7C (87301255)LF857$3.10$3.10$3.10
73Elcbl C lead 14 1PR (87301305)LF2,480$1.80$1.80$1.80
74Elcbl C serv 6 2C (87301805)LF104$4.70$4.70$4.70
75Elcbl C egrdc 6 1C (87301900)LF1,109$2.40$2.40$2.40
76TS post galvs 16 (87502500)EACH2$2,561.00$2,580.00$2,561.00
77S maa & P 38 (87700230)EACH2$17,108$17,200$17,108
78S maa & P 42 (87700250)EACH2$18,114$18,120$18,114
79Conc FDN TY A (87800100)LF12$337.80$340.00$337.80
80Conc FDN TY C (87800150)LF4$904.50$905.00$904.50
81Conc FDN TY E 36D (87800415)LF48$412.50$415.00$412.50
82SH LED 1F 3S mam (88030020)EACH8$960.00$960.00$960.00
83SH LED 1F 3S BM (88030050)EACH2$825.00$825.00$825.00
84SH LED 1F 5S BM (88030100)EACH2$1,204.00$2,450.00$1,204.00
85SH LED 1F 5S mam (88030110)EACH2$1,356.00$1,375.00$1,356.00
86Ped SH LED 1F BM CDT (88102717)EACH8$634.00$634.00$634.00
87TS backplate ret-refl (88200510)EACH10$326.00$326.00$326.00
88Inductive loop detect (88500100)EACH8$200.00$200.00$200.00
89Det loop T1 (88600100)LF526$26.40$27.00$26.40
90Light detector (88700200)EACH2$1,357.00$1,357.00$1,357.00
91Light detector amp (88700300)EACH1$1,993.00$1,995.00$1,993.00
92Temp TR sig install (89000100)EACH1$50,141$95,000$50,141
93Remov EX TS equip (89502375)EACH1$2,560.00$10,000$2,560.00
94Remov EX handhole (89502380)EACH5$640.00$3,300.00$640.00
95Remov EX DBL handhole (89502382)EACH1$960.00$960.00$960.00
96Remov EX conc FDN (89502385)EACH8$320.00$320.00$320.00
IDOT contract 61K94: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy