IDOT contract 61L71 bid tabulation
Park Ridge, section 23-00155-00-RS. Let by Illinois DOT on September 19, 2025, Cook, District 01. 3 bids received; low bid $2,778,778 by Builders Paving, LLC.
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 78
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Builders Paving, LLC | $2,778,778 | Low |
| 2 | Plote Construction, Inc. | $2,910,043 | +5.0% |
| 3 | K-Five Construction Corporation | $3,185,651 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Builders Paving, LLC | 2. Plote Construction, Inc. | 3. K-Five Construction Corporation |
|---|---|---|---|---|---|---|
| 1 | HMA drive rem & rep (XX006947) | SY | 295 | $63.50 | $145.00 | $50.00 |
| 2 | Rem & rein bric paver (X0327611) | SF | 100 | $25.00 | $25.00 | $25.00 |
| 3 | Temp access- priv ent (X4021000) | EACH | 112 | $15.00 | $10.00 | $90.00 |
| 4 | Temp access- com ent (X4022000) | EACH | 16 | $30.00 | $10.00 | $90.00 |
| 5 | PCC driveway PVT 6 SP (X4230710) | SY | 271 | $95.00 | $105.00 | $118.00 |
| 6 | PCC driveway PVT 8 SP (X4230800) | SY | 34 | $135.00 | $110.00 | $152.00 |
| 7 | CC&G RMVL repl < = 10 (X4400501) | LF | 1,875 | $50.00 | $37.00 | $60.00 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 6,066 | $50.00 | $34.00 | $51.00 |
| 9 | FR & lids adjust SPL (X6030310) | EACH | 95 | $1,250.00 | $1,250.00 | $1,250.00 |
| 10 | Temp info signing (X7200061) | SF | 206 | $15.00 | $17.00 | $15.00 |
| 11 | RCSD refl PVT MKR HMA (X7810301) | EACH | 300 | $28.50 | $40.00 | $64.00 |
| 12 | Det loop repl (X8860105) | LF | 598 | $24.70 | $24.70 | $24.70 |
| 13 | Construction layout (Z0013798) | LS | 1 | $10,000 | $200.00 | $20,000 |
| 14 | Drain util STR adj (Z0017400) | EACH | 66 | $450.00 | $450.00 | $450.00 |
| 15 | Drain util STR recon (Z0017700) | EACH | 2 | $1,650.00 | $1,650.00 | $1,650.00 |
| 16 | RR prot liability ins (Z0048665) | LS | 1 | $7,000.00 | $8,000.00 | $4,000.00 |
| 17 | Tree trunk protection (20101100) | EACH | 15 | $220.00 | $220.00 | $150.00 |
| 18 | Tree root pruning (20101200) | EACH | 15 | $200.00 | $200.00 | $150.00 |
| 19 | Supple watering (20101700) | UNIT | 87 | $0.01 | $0.01 | $0.01 |
| 20 | Rem & disp uns matl (20201200) | CY | 34 | $60.00 | $105.00 | $62.00 |
| 21 | Geotech fab F/GR stab (21001000) | SY | 405 | $1.42 | $3.50 | $0.01 |
| 22 | Topsoil F & P 4 (21101615) | SY | 1,604 | $5.12 | $5.12 | $5.00 |
| 23 | Seeding CL 2A (25000210) | ACRE | 1 | $4,250.00 | $4,250.00 | $4,300.00 |
| 24 | Nitrogen fert nutr (25000400) | LB | 36 | $3.00 | $3.00 | $3.00 |
| 25 | Potassium fert nutr (25000600) | LB | 36 | $3.00 | $3.00 | $3.00 |
| 26 | Erosion contr blanket (25100630) | SY | 1,604 | $3.25 | $3.25 | $3.25 |
| 27 | Inlet filters (28000510) | EACH | 112 | $200.00 | $200.00 | $200.00 |
| 28 | Agg subgrade improve (30300001) | CY | 14 | $110.00 | $150.00 | $62.00 |
| 29 | Agg subgrade impr 12 (30300112) | SY | 81 | $37.50 | $70.00 | $20.00 |
| 30 | Agg base cse B 4 (35101600) | SY | 1,107 | $1.00 | $4.00 | $7.00 |
| 31 | Agg base cse B 6 (35101800) | SY | 229 | $1.50 | $4.50 | $10.00 |
| 32 | Agg base cse B 8 (35102000) | SY | 222 | $2.00 | $5.00 | $14.00 |
| 33 | Bit matls tack CT (40600290) | LB | 35,892 | $0.01 | $0.01 | $0.01 |
| 34 | Long joint sealant (40600370) | LF | 31,857 | $3.50 | $1.00 | $3.50 |
| 35 | Mix CR JTS flangewys (40600400) | TON | 21 | $585.00 | $950.00 | $350.00 |
| 36 | HMA surf rem butt JT (40600982) | SY | 2,323 | $5.00 | $1.00 | $0.01 |
| 37 | HMA BC IL-19.0 N70 (40603085) | TON | 8,933 | $74.00 | $90.00 | $90.00 |
| 38 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,956 | $78.00 | $100.00 | $100.00 |
| 39 | Protective coat (42001300) | SY | 1,107 | $0.01 | $0.01 | $4.00 |
| 40 | PC conc sidewalk 5 (42400200) | SF | 10,317 | $14.00 | $9.00 | $12.00 |
| 41 | PC conc sidewalk 6 (42400300) | SF | 100 | $14.00 | $11.00 | $13.00 |
| 42 | Detectable warnings (42400800) | SF | 142 | $30.00 | $45.00 | $69.00 |
| 43 | HMA surf rem 4 3/4 (44000168) | SY | 53,172 | $5.65 | $5.70 | $8.00 |
| 44 | Drive pavement rem (44000200) | SY | 305 | $15.00 | $12.00 | $19.00 |
| 45 | Sidewalk rem (44000600) | SF | 10,715 | $1.50 | $2.50 | $1.80 |
| 46 | CL D patch T1 8 (44201737) | SY | 10 | $85.00 | $130.00 | $85.00 |
| 47 | CL D patch T2 8 (44201741) | SY | 48 | $85.00 | $130.00 | $85.00 |
| 48 | CL D patch T3 8 (44201745) | SY | 40 | $85.00 | $130.00 | $85.00 |
| 49 | CL D patch T4 8 (44201747) | SY | 307 | $85.00 | $130.00 | $85.00 |
| 50 | FR & grates T11 (60404800) | EACH | 6 | $650.00 | $650.00 | $650.00 |
| 51 | FR & lids T1 OL (60406000) | EACH | 3 | $465.00 | $465.00 | $465.00 |
| 52 | FR & lids T1 CL (60406100) | EACH | 3 | $465.00 | $465.00 | $465.00 |
| 53 | Non SPL waste disposl (66900200) | CY | 34 | $200.00 | $175.00 | $133.00 |
| 54 | Soil disposal analy (66900530) | EACH | 1 | $1,785.00 | $1,785.00 | $1,785.00 |
| 55 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,400.00 | $3,400.00 |
| 56 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 |
| 57 | Reg sub mon (66901006) | CAL DAY | 30 | $700.00 | $700.00 | $700.00 |
| 58 | Mobilization (67100100) | LS | 1 | $172,705 | $174,000 | $160,000 |
| 59 | TR cont & prot 701606 (70102625) | LS | 1 | $30,000 | $50,000 | $43,200 |
| 60 | TR cont & prot 701701 (70102635) | LS | 1 | $1,000.00 | $10,000 | $1.00 |
| 61 | TR cont & prot 701801 (70102640) | LS | 1 | $1,000.00 | $6,000.00 | $1.00 |
| 62 | Changeable message SN (70107025) | CAL DAY | 200 | $30.00 | $35.00 | $25.00 |
| 63 | Short term pavt mking (70300100) | LF | 17,535 | $1.00 | $2.40 | $0.01 |
| 64 | SHRT TRM pavt MK rem (70300150) | SF | 5,845 | $1.75 | $0.01 | $0.01 |
| 65 | Temp PVT MK LTR & sym paint (70300211) | SF | 130 | $0.01 | $0.01 | $0.01 |
| 66 | Temp PVT MK line 4 - paint (70300221) | LF | 65,604 | $0.01 | $0.01 | $0.01 |
| 67 | Temp PVT MK line 6 - paint (70300241) | LF | 1,503 | $0.01 | $0.01 | $0.01 |
| 68 | Temp PVT MK line 12 - paint (70300261) | LF | 3,055 | $0.01 | $0.01 | $0.01 |
| 69 | Temp PVT MK line 24 - paint (70300281) | LF | 546 | $0.01 | $0.01 | $0.01 |
| 70 | Sign panel T1 (72000100) | SF | 108 | $26.00 | $35.00 | $30.00 |
| 71 | Remov sin pan assy TB (72400200) | EACH | 15 | $200.00 | $100.00 | $105.00 |
| 72 | Teles STL sin support (72800100) | LF | 100 | $19.00 | $22.00 | $18.00 |
| 73 | THPL PVT MK LTR & sym (78000100) | SF | 130 | $5.50 | $5.75 | $7.00 |
| 74 | THPL PVT MK line 4 (78000200) | LF | 21,868 | $0.80 | $0.75 | $0.76 |
| 75 | THPL PVT MK line 6 (78000400) | LF | 501 | $0.90 | $1.30 | $1.14 |
| 76 | THPL PVT MK line 12 (78000600) | LF | 1,033 | $2.50 | $2.75 | $3.50 |
| 77 | THPL PVT MK line 24 (78000650) | LF | 182 | $5.50 | $5.75 | $7.00 |
| 78 | Raised ref PVT MK rem (78300200) | EACH | 30 | $29.50 | $19.97 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.