IDOT contract 61M07 bid tabulation
Spring Grove, section 23-00021-00-RS. Let by Illinois DOT on January 16, 2026, Mchenry, District 01. 4 bids received; low bid $910,908 by Curran Contracting Company.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 79
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Curran Contracting Company | $910,908 | Low |
| 2 | Everlast Blacktop Inc. | $1,032,073 | +13% |
| 3 | Payne & Dolan, Inc. | $1,197,995 | +32% |
| 4 | Schroeder Asphalt Services, Inc. | $1,282,080 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Curran Contracting Company | 2. Everlast Blacktop Inc. | 3. Payne & Dolan, Inc. | 4. Schroeder Asphalt Services, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Washout basin (X0326806) | LS | 1 | $900.00 | $900.00 | $900.00 | $1,100.00 |
| 2 | Tri geogrid reinf T1 (X0327487) | SY | 102 | $17.50 | $15.00 | $100.00 | $8.50 |
| 3 | Temp bypass pump sys (X1200274) | LS | 1 | $10,000 | $60,000 | $15,000 | $17,000 |
| 4 | Explor trench SPL (X2130010) | LF | 100 | $40.00 | $15.00 | $50.00 | $60.00 |
| 5 | Turf reinf mat SPL (X2510900) | SY | 397 | $85.00 | $105.00 | $85.00 | $345.00 |
| 6 | PCC shoulders 8 SPL (X4830030) | SY | 11 | $200.00 | $900.00 | $200.00 | $350.00 |
| 7 | Rem & reloc end sect (X5427600) | EACH | 1 | $3,500.00 | $3,800.00 | $2,500.00 | $2,800.00 |
| 8 | GDRL post repair (X6330801) | EACH | 7 | $175.00 | $165.00 | $325.00 | $200.00 |
| 9 | Temp info signing (X7200061) | SF | 103 | $16.00 | $18.00 | $16.00 | $22.00 |
| 10 | Det loop repl (X8860105) | LF | 158 | $46.32 | $55.00 | $47.00 | $53.00 |
| 11 | Construction layout (Z0013798) | LS | 1 | $8,500.00 | $12,000 | $3,000.00 | $9,500.00 |
| 12 | RR prot liability ins (Z0048665) | LS | 1 | $4,000.00 | $8,000.00 | $4,050.00 | $4,800.00 |
| 13 | Exc & GR EX shoulder (20200600) | UNIT | 4 | $1,300.00 | $800.00 | $3,300.00 | $1,400.00 |
| 14 | Porous gran embank (20700220) | CY | 34 | $100.00 | $94.00 | $88.00 | $75.00 |
| 15 | Trench backfill (20800150) | CY | 18 | $100.00 | $68.00 | $23.00 | $26.00 |
| 16 | Topsoil F & P 4 (21101615) | SY | 1,279 | $6.00 | $6.00 | $6.00 | $12.00 |
| 17 | Seeding CL 2A (25000210) | ACRE | 1 | $4,840.00 | $2,500.00 | $4,840.00 | $5,000.00 |
| 18 | Nitrogen fert nutr (25000400) | LB | 28 | $1.00 | $1.00 | $1.00 | $5.00 |
| 19 | Potassium fert nutr (25000600) | LB | 28 | $1.00 | $1.00 | $1.00 | $5.00 |
| 20 | Mulch method 3 (25100125) | ACRE | 1 | $4,840.00 | $3,000.00 | $4,840.00 | $5,200.00 |
| 21 | Temp eros contr seed (28000250) | LB | 31 | $0.10 | $2.00 | $0.10 | $7.00 |
| 22 | Temp ditch checks (28000305) | LF | 120 | $12.00 | $36.00 | $12.00 | $18.00 |
| 23 | Perimeter eros bar (28000400) | LF | 402 | $4.00 | $3.00 | $4.00 | $5.00 |
| 24 | Inlet filters (28000510) | EACH | 2 | $250.00 | $200.00 | $250.00 | $300.00 |
| 25 | Stone dump rip CL A4 (28100707) | SY | 52 | $125.00 | $118.00 | $50.00 | $185.00 |
| 26 | Agg base cse B 4 (35101600) | SY | 36 | $80.00 | $20.00 | $50.00 | $12.00 |
| 27 | Bit matls PR CT (40600275) | LB | 768 | $0.01 | $0.01 | $0.10 | $0.01 |
| 28 | Bit matls tack CT (40600290) | LB | 8,543 | $0.50 | $0.01 | $0.10 | $0.01 |
| 29 | Long joint sealant (40600370) | LF | 5,035 | $3.99 | $4.00 | $3.60 | $4.50 |
| 30 | Mix CR JTS flangewys (40600400) | TON | 10 | $500.00 | $650.00 | $320.00 | $550.00 |
| 31 | HMA surf rem butt JT (40600982) | SY | 209 | $15.00 | $36.00 | $0.10 | $12.00 |
| 32 | P HMA BC IL-4.75 N50 (40603200) | TON | 699 | $125.00 | $114.00 | $138.00 | $130.00 |
| 33 | HMA SC IL-9.5 D N50 (40604060) | TON | 60 | $195.00 | $200.00 | $175.00 | $125.00 |
| 34 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,423 | $90.00 | $93.42 | $91.50 | $100.00 |
| 35 | PC conc sidewalk 5 (42400200) | SF | 323 | $35.00 | $18.00 | $35.00 | $28.00 |
| 36 | Detectable warnings (42400800) | SF | 20 | $65.00 | $100.00 | $65.00 | $48.00 |
| 37 | HMA surf rem 2 1/2 (44000159) | SY | 12,603 | $3.70 | $3.72 | $4.15 | $2.85 |
| 38 | Drive pavement rem (44000200) | SY | 343 | $15.00 | $18.00 | $23.00 | $16.00 |
| 39 | Sidewalk rem (44000600) | SF | 323 | $25.00 | $3.00 | $25.00 | $17.00 |
| 40 | CL D patch T4 5 (44201711) | SY | 420 | $75.00 | $60.00 | $46.50 | $55.00 |
| 41 | Aggregate SHLDS B (48101200) | TON | 153 | $85.00 | $62.00 | $30.00 | $68.00 |
| 42 | HMA shoulders 6 (48203021) | SY | 155 | $60.00 | $89.00 | $98.50 | $90.00 |
| 43 | Pipe culvert remov (50105220) | LF | 102 | $60.00 | $40.00 | $250.00 | $280.00 |
| 44 | Rem/disp uns matl-STR (50200450) | CY | 34 | $110.00 | $90.00 | $465.00 | $90.00 |
| 45 | Temp soil reten systm (52200020) | SF | 620 | $20.00 | $72.00 | $125.00 | $24.00 |
| 46 | Box cul end sec C1 (54001001) | EACH | 2 | $20,000 | $22,000 | $35,000 | $40,000 |
| 47 | PCBC 12X6 (54011206) | LF | 39 | $3,000.00 | $3,599.00 | $6,500.00 | $7,500.00 |
| 48 | Storm sew CL B 1 24 (550B0120) | LF | 123 | $120.00 | $189.00 | $190.00 | $215.00 |
| 49 | Storm sewer rem 24 (55101200) | LF | 123 | $55.00 | $40.00 | $50.00 | $56.00 |
| 50 | Contr low-streng matl (59300100) | CY | 47 | $325.00 | $390.00 | $425.00 | $475.00 |
| 51 | FR & lids adjust (60300305) | EACH | 1 | $1,500.00 | $900.00 | $1,500.00 | $1,700.00 |
| 52 | SPGR att to culvert (63000030) | LF | 28 | $286.75 | $330.00 | $240.00 | $315.00 |
| 53 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,717.00 | $4,500.00 | $3,786.00 | $4,150.00 |
| 54 | Guardrail remov (63200310) | LF | 84 | $12.00 | $12.00 | $12.00 | $14.00 |
| 55 | Mobilization (67100100) | LS | 1 | $58,000 | $57,071 | $80,500 | $30,000 |
| 56 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $10.00 | $1.00 | $1.00 |
| 57 | Traf cont-prot 701306 (70100460) | LS | 1 | $10,000 | $15,000 | $1.00 | $1.00 |
| 58 | TR cont & prot 701501 (70102620) | LS | 1 | $40,000 | $5,000.00 | $23,300 | $35,000 |
| 59 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $5,000.00 | $1.00 | $1.00 |
| 60 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $10.00 | $1.00 | $4,000.00 |
| 61 | Short term pavt mking (70300100) | LF | 4,064 | $0.66 | $1.00 | $0.01 | $2.75 |
| 62 | SHRT TRM pavt MK rem (70300150) | SF | 1,055 | $2.50 | $1.00 | $0.49 | $3.00 |
| 63 | Temp conc barrier (70400100) | LF | 115 | $79.00 | $125.00 | $79.00 | $140.00 |
| 64 | Pin temp conc barrier (70400125) | EACH | 30 | $17.00 | $40.00 | $17.00 | $30.00 |
| 65 | Rel temp conc barrier (70400200) | LF | 250 | $14.00 | $8.00 | $14.00 | $18.00 |
| 66 | Imp attn temp FRR TL3 (70600305) | EACH | 2 | $4,466.00 | $11,000 | $11,800 | $5,000.00 |
| 67 | Imp attn rel FRD TL3 (70600330) | EACH | 2 | $2,219.00 | $2,400.00 | $3,500.00 | $2,600.00 |
| 68 | Terminal marker - DA (72501000) | EACH | 4 | $38.00 | $22.00 | $25.00 | $44.00 |
| 69 | Mod ureth PM LTR-sym (78009000) | SF | 1,215 | $5.00 | $5.50 | $5.00 | $6.25 |
| 70 | Mod ureth PM line 4 (78009004) | LF | 10,113 | $1.00 | $1.55 | $1.00 | $0.98 |
| 71 | Mod ureth PM line 6 (78009006) | LF | 384 | $1.25 | $2.25 | $1.25 | $1.75 |
| 72 | Mod ureth PM line 12 (78009012) | LF | 200 | $2.25 | $4.50 | $2.25 | $3.35 |
| 73 | Mod ureth PM line 24 (78009024) | LF | 119 | $5.00 | $9.00 | $5.00 | $6.25 |
| 74 | GRV RCSD PM LTR & sym (78011000) | SF | 1,215 | $1.00 | $2.00 | $1.00 | $7.40 |
| 75 | GRV RCSD PVT MRKG 5 (78011025) | LF | 10,113 | $0.45 | $0.60 | $0.45 | $0.49 |
| 76 | GRV RCSD PVT MRKG 7 (78011035) | LF | 321 | $0.60 | $0.75 | $0.60 | $0.77 |
| 77 | GRV RCSD PVT MRKG 13 (78011065) | LF | 200 | $0.80 | $1.50 | $0.80 | $3.35 |
| 78 | GRV RCSD PVT MRKG 25 (78011125) | LF | 119 | $1.00 | $2.50 | $1.00 | $35.00 |
| 79 | Grdrail ref type A (78200005) | EACH | 8 | $10.00 | $22.00 | $12.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.