IDOT contract 62L61 bid tabulation
Section 2020-083-RS. Let by Illinois DOT on June 13, 2025, Mchenry, District 01. 4 bids received; low bid $2,693,463 by Curran Contracting Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 63
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Curran Contracting Company | $2,693,463 | Low |
| 2 | Builders Paving, LLC | $3,071,808 | +14% |
| 3 | Plote Construction, Inc. | $3,137,210 | +16% |
| 4 | Peter Baker & Son Co. | $3,577,247 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Curran Contracting Company | 2. Builders Paving, LLC | 3. Plote Construction, Inc. | 4. Peter Baker & Son Co. |
|---|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 160 | $60.00 | $60.00 | $160.00 | $185.00 |
| 2 | Temp access- priv ent (X4021000) | EACH | 6 | $575.00 | $150.00 | $1,800.00 | $850.00 |
| 3 | Temp access- com ent (X4022000) | EACH | 12 | $715.00 | $225.00 | $1,900.00 | $1,600.00 |
| 4 | Centerln rum strip 16 (X6420114) | LF | 7,493 | $1.35 | $1.70 | $1.45 | $1.54 |
| 5 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $3,000.00 | $1,500.00 | $1,000.00 |
| 6 | Temp info signing (X7200061) | SF | 1,080 | $2.00 | $2.00 | $2.00 | $25.00 |
| 7 | HS THPL PM LN 4 (X7800815) | LF | 17,800 | $0.65 | $0.65 | $0.65 | $0.65 |
| 8 | Earth excavation (20200100) | CY | 5,427 | $40.00 | $42.00 | $38.00 | $66.00 |
| 9 | Rem & disp uns matl (20201200) | CY | 888 | $40.00 | $25.00 | $38.00 | $72.00 |
| 10 | Agg subgrade improve (30300011) | TON | 592 | $30.00 | $85.00 | $62.00 | $60.00 |
| 11 | Agg subgrade impr 12 (30300112) | SY | 8,881 | $20.50 | $36.50 | $26.00 | $36.00 |
| 12 | HMA base cse 6 (35501308) | SY | 153 | $68.49 | $90.00 | $100.00 | $76.00 |
| 13 | HMA BC wid 8 1/2 (35600710) | SY | 8,881 | $38.00 | $45.00 | $47.00 | $48.00 |
| 14 | Bit matls PR CT (40600275) | LB | 19,982 | $0.01 | $0.30 | $0.01 | $0.01 |
| 15 | Bit matls tack CT (40600290) | LB | 28,550 | $0.01 | $1.00 | $0.01 | $0.01 |
| 16 | Long joint sealant (40600370) | LF | 11,965 | $2.75 | $2.80 | $2.95 | $3.91 |
| 17 | Mix CR JTS flangewys (40600400) | TON | 51 | $200.00 | $540.00 | $150.00 | $100.00 |
| 18 | HMA surf rem butt JT (40600982) | SY | 122 | $25.00 | $25.00 | $60.00 | $1.00 |
| 19 | HMA repl over patch (40601005) | TON | 15 | $130.00 | $385.00 | $265.00 | $272.00 |
| 20 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,379 | $105.00 | $106.00 | $125.00 | $112.00 |
| 21 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,553 | $85.00 | $83.00 | $92.00 | $99.00 |
| 22 | Pavement rem (44000100) | SY | 1,777 | $44.00 | $13.00 | $108.00 | $20.50 |
| 23 | HMA surf rem 2 1/4 (44000158) | SY | 33,413 | $2.90 | $2.50 | $2.35 | $4.20 |
| 24 | Drive pavement rem (44000200) | SY | 287 | $20.00 | $17.00 | $103.00 | $18.04 |
| 25 | HMA RM OV patch 4 1/2 (44002218) | SY | 3,277 | $22.50 | $5.00 | $1.00 | $0.50 |
| 26 | CL D patch T1 10 (44201761) | SY | 100 | $285.00 | $167.00 | $60.00 | $67.00 |
| 27 | CL D patch T2 10 (44201765) | SY | 1,500 | $125.00 | $125.00 | $60.00 | $67.00 |
| 28 | CL D patch T3 10 (44201769) | SY | 800 | $100.00 | $115.00 | $60.00 | $67.00 |
| 29 | CL D patch T4 10 (44201771) | SY | 500 | $75.00 | $92.00 | $60.00 | $67.00 |
| 30 | Agg wedge SHLD type B (48102100) | TON | 2,985 | $28.00 | $25.00 | $10.00 | $25.00 |
| 31 | Rem RE-E SPBGR TY A (63301210) | LF | 1,671 | $29.00 | $29.00 | $29.00 | $59.00 |
| 32 | Shoulder rum strip 8 (64200108) | LF | 15,045 | $0.80 | $0.80 | $0.90 | $0.90 |
| 33 | Non SPL waste disposl (66900200) | CY | 5,430 | $50.00 | $47.00 | $75.00 | $68.00 |
| 34 | Soil disposal analy (66900530) | EACH | 2 | $1,400.00 | $1,680.00 | $1,310.00 | $1,800.00 |
| 35 | Reg sub P-const plan (66901001) | LS | 1 | $3,900.00 | $3,400.00 | $4,300.00 | $3,500.00 |
| 36 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $4,700.00 | $500.00 |
| 37 | Reg sub mon (66901006) | CAL DAY | 25 | $700.00 | $700.00 | $825.00 | $725.00 |
| 38 | Mobilization (67100100) | LS | 1 | $145,000 | $217,594 | $185,000 | $555,013 |
| 39 | Traf cont-prot 701201 (70100450) | LS | 1 | $125.00 | $5,000.00 | $125.00 | $100.00 |
| 40 | Traf cont-prot 701306 (70100460) | LS | 1 | $125.00 | $40,000 | $125.00 | $100.00 |
| 41 | Traf cont-prot 701336 (70100600) | LS | 1 | $32,500 | $40,000 | $274,299 | $100.00 |
| 42 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $139,000 | $125.00 | $42,499 |
| 43 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $5,000.00 | $1.00 | $100.00 |
| 44 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $5,000.00 | $1.00 | $100.00 |
| 45 | TR cont surveillance (70103815) | CAL DAY | 39 | $300.00 | $300.00 | $300.00 | $1,250.00 |
| 46 | Short term pavt mking (70300100) | LF | 96,920 | $0.10 | $0.01 | $0.01 | $0.01 |
| 47 | SHRT TRM pavt MK rem (70300150) | SF | 30,917 | $0.10 | $0.01 | $0.01 | $0.01 |
| 48 | Temp PVT MK LTR & sym paint (70300211) | SF | 750 | $0.10 | $0.01 | $0.01 | $0.01 |
| 49 | Temp PVT MK line 4 - paint (70300221) | LF | 148,410 | $0.10 | $0.01 | $0.01 | $0.01 |
| 50 | Temp PVT MK line 6 - paint (70300241) | LF | 753 | $0.10 | $0.01 | $0.01 | $0.01 |
| 51 | Temp PVT MK line 12 - paint (70300261) | LF | 117 | $0.10 | $0.01 | $0.01 | $0.01 |
| 52 | Temp PVT MK line 24 - paint (70300281) | LF | 190 | $0.10 | $0.01 | $0.01 | $0.01 |
| 53 | Temp PVT MK L4 T4 tape (70307120) | LF | 42,399 | $0.10 | $0.01 | $0.01 | $0.01 |
| 54 | Temp PVT MK L6 T4 tape (70307130) | LF | 1,787 | $0.10 | $0.01 | $0.01 | $0.01 |
| 55 | Temp PVT MK L12 T4 tape (70307160) | LF | 105 | $0.10 | $0.01 | $0.01 | $0.01 |
| 56 | Temp PVT MK L24 T4 tape (70307210) | LF | 52 | $0.10 | $0.01 | $0.01 | $0.01 |
| 57 | THPL PVT MK LTR & sym (78000100) | SF | 250 | $7.00 | $7.00 | $7.00 | $5.00 |
| 58 | THPL PVT MK line 4 (78000200) | LF | 49,470 | $0.90 | $0.90 | $0.90 | $1.10 |
| 59 | THPL PVT MK line 6 (78000400) | LF | 251 | $1.60 | $1.60 | $1.60 | $1.71 |
| 60 | THPL PVT MK line 12 (78000600) | LF | 39 | $3.32 | $3.32 | $3.32 | $3.41 |
| 61 | THPL PVT MK line 24 (78000650) | LF | 63 | $8.25 | $8.25 | $8.25 | $6.82 |
| 62 | Raised refl pavt MKR (78100100) | EACH | 272 | $38.00 | $38.00 | $38.00 | $46.00 |
| 63 | Raised ref PVT MK rem (78300200) | EACH | 272 | $13.00 | $12.00 | $1.00 | $16.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.