IDOT contract 62R95 bid tabulation
Section FAP. Let by Illinois DOT on January 17, 2025, Mchenry, District 01. 3 bids received; low bid $2,149,178 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 59
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $2,149,178 | Low |
| 2 | Curran Contracting Company | $2,266,264 | +5.0% |
| 3 | Rock Road Companies, Inc. | $2,515,612 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Curran Contracting Company | 3. Rock Road Companies, Inc. |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $1,725.00 | $5,000.00 | $4,600.00 |
| 2 | Grading & shap SHLDRS (X2020110) | UNIT | 274 | $75.00 | $79.00 | $56.09 |
| 3 | Centerln rum strip 16 (X6420114) | LF | 14,402 | $0.56 | $1.25 | $0.92 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $1,000.00 | $2,400.00 | $0.01 |
| 5 | HS THPL PM LN 4 (X7800815) | LF | 10,437 | $0.38 | $0.75 | $0.38 |
| 6 | HS THPL PM LN 12 (X7800855) | LF | 71 | $3.00 | $5.65 | $3.00 |
| 7 | Temp info signing (Z0030850) | SF | 52 | $12.50 | $16.00 | $16.00 |
| 8 | Earth excavation (20200100) | CY | 3,065 | $81.30 | $40.00 | $51.00 |
| 9 | Agg subgrade impr 12 (30300112) | SY | 5,644 | $42.00 | $25.00 | $46.00 |
| 10 | HMA base cse 6 (35501308) | SY | 10 | $85.80 | $120.00 | $93.65 |
| 11 | HMA base cse 8 (35501316) | SY | 104 | $73.35 | $65.00 | $79.96 |
| 12 | HMA BC wid 10 1/4 (35600717) | SY | 5,644 | $56.80 | $53.00 | $56.70 |
| 13 | Bit matls PR CT (40600275) | LB | 12,699 | $0.01 | $0.01 | $1.36 |
| 14 | Bit matls tack CT (40600290) | LB | 25,657 | $0.01 | $0.01 | $0.01 |
| 15 | Long joint sealant (40600370) | LF | 33,037 | $2.27 | $2.50 | $2.50 |
| 16 | Mix CR JTS flangewys (40600400) | TON | 82 | $175.00 | $180.00 | $242.34 |
| 17 | HMA surf rem butt JT (40600982) | SY | 240.80 | $3.00 | $25.00 | $23.57 |
| 18 | HMA SC IL-9.5 D N50 (40604060) | TON | 9 | $88.20 | $300.00 | $312.89 |
| 19 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,036 | $88.20 | $90.00 | $99.01 |
| 20 | Protective coat (42001300) | SY | 58 | $1.50 | $12.53 | $0.01 |
| 21 | PC conc sidewalk 5 (42400200) | SF | 515 | $22.60 | $26.00 | $38.00 |
| 22 | Detectable warnings (42400800) | SF | 42 | $41.00 | $35.00 | $50.00 |
| 23 | Pavement rem (44000100) | SY | 1,915 | $23.25 | $34.00 | $50.00 |
| 24 | HMA surf rem 1 1/2 (44000155) | SY | 54,193 | $2.15 | $2.30 | $2.29 |
| 25 | Drive pavement rem (44000200) | SY | 114 | $74.15 | $41.00 | $5.00 |
| 26 | Sidewalk rem (44000600) | SF | 515 | $5.25 | $12.00 | $15.00 |
| 27 | CL D patch T2 13 (44201803) | SY | 1,000 | $50.00 | $160.00 | $210.49 |
| 28 | CL D patch T3 13 (44201807) | SY | 700 | $50.00 | $140.00 | $210.49 |
| 29 | CL D patch T4 13 (44201809) | SY | 350 | $50.00 | $120.00 | $210.49 |
| 30 | Agg wedge SHLD type B (48102100) | TON | 992 | $47.45 | $42.00 | $39.92 |
| 31 | Shoulder rum strip 8 (64200108) | LF | 28,748 | $0.31 | $0.90 | $0.68 |
| 32 | Non SPL waste disposl (66900200) | CY | 3,062 | $0.01 | $55.00 | $47.00 |
| 33 | Soil disposal analy (66900530) | EACH | 4 | $1,575.00 | $1,400.00 | $1,200.00 |
| 34 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $2,900.00 | $4,000.00 |
| 35 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,800.00 | $1,000.00 |
| 36 | Reg sub mon (66901006) | CAL DAY | 20 | $700.00 | $675.00 | $870.00 |
| 37 | Mobilization (67100100) | LS | 1 | $275,335 | $135,000 | $80,760 |
| 38 | Traf cont-prot 701306 (70100460) | LS | 1 | $1,744.00 | $20,000 | $16,900 |
| 39 | Traf cont-prot 701336 (70100600) | LS | 1 | $6,370.00 | $20,000 | $16,900 |
| 40 | TR cont & prot 701501 (70102620) | LS | 1 | $9,481.00 | $10,000 | $1.00 |
| 41 | TR cont & prot 701502 (70102622) | LS | 1 | $1,722.00 | $1.00 | $1.00 |
| 42 | TR cont & prot 701801 (70102640) | LS | 1 | $1,033.00 | $1.00 | $1.00 |
| 43 | TR cont surveillance (70103815) | CAL DAY | 10 | $500.00 | $300.00 | $300.00 |
| 44 | Short term pavt mking (70300100) | LF | 4,044 | $0.01 | $0.50 | $1.57 |
| 45 | SHRT TRM pavt MK rem (70300150) | SF | 2,022 | $0.01 | $2.50 | $4.41 |
| 46 | Temp PVT MK line 4 - paint (70300221) | LF | 44,046 | $0.01 | $0.35 | $0.01 |
| 47 | Temp PVT MK line 12 - paint (70300261) | LF | 71 | $0.01 | $1.50 | $0.01 |
| 48 | Temp PVT MK line 24 - paint (70300281) | LF | 62 | $0.01 | $3.00 | $0.01 |
| 49 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,022 | $0.01 | $1.50 | $0.01 |
| 50 | THPL PVT MK line 4 (78000200) | LF | 33,609 | $0.83 | $0.80 | $0.83 |
| 51 | THPL PVT MK line 24 (78000650) | LF | 62 | $8.00 | $5.75 | $8.00 |
| 52 | Mod ureth PM LTR-sym (78009000) | SF | 184 | $5.25 | $5.00 | $5.25 |
| 53 | Mod ureth PM line 4 (78009004) | LF | 12,147 | $0.70 | $0.95 | $0.70 |
| 54 | Mod ureth PM line 6 (78009006) | LF | 582 | $1.25 | $1.45 | $1.25 |
| 55 | Mod ureth PM line 12 (78009012) | LF | 182 | $3.00 | $2.65 | $3.00 |
| 56 | Mod ureth PM line 24 (78009024) | LF | 84 | $5.25 | $5.45 | $5.25 |
| 57 | Raised refl pavt MKR (78100100) | EACH | 416 | $35.00 | $38.50 | $35.00 |
| 58 | Raised ref PVT MK rem (78300200) | EACH | 416 | $18.85 | $13.00 | $13.16 |
| 59 | PVT MKG rem WTR blast (78300202) | SF | 19,751 | $1.00 | $0.03 | $0.03 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.