IDOT contract 62T21 bid tabulation
Section FAP. Let by Illinois DOT on January 17, 2025, Dupage, District 01. 3 bids received; low bid $6,615,450 by R. W. Dunteman Company.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. W. Dunteman Company | $6,615,450 | Low |
| 2 | K-Five Construction Corporation | $6,620,090 | 0.0% |
| 3 | Plote Construction, Inc. | $6,654,901 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. W. Dunteman Company | 2. K-Five Construction Corporation | 3. Plote Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $3,000.00 | $2,000.00 | $5,000.00 |
| 2 | Rem TH epxy B DK olay (X0325499) | SY | 45 | $153.00 | $100.00 | $175.00 |
| 3 | Grading & shap SHLDRS (X2020110) | UNIT | 480 | $38.20 | $38.00 | $74.00 |
| 4 | CC&G RMVL repl < = 10 (X4400501) | LF | 315 | $86.51 | $75.00 | $67.50 |
| 5 | CC&G RMVL repl > 10FT (X4400503) | LF | 235 | $75.92 | $65.00 | $62.00 |
| 6 | SS cleaned 12 (X5537800) | LF | 315 | $3.00 | $3.00 | $1.00 |
| 7 | FR & lids adjust SPL (X6030310) | EACH | 8 | $1,250.00 | $1,250.00 | $1,250.00 |
| 8 | Det loop repl (X8860105) | LF | 3,428 | $15.21 | $15.25 | $15.21 |
| 9 | BR DK TH poly ovl 3/8 (Z0012193) | SY | 45 | $1,028.50 | $800.00 | $1,028.50 |
| 10 | Drainage STR cleaned (Z0018500) | EACH | 21 | $350.00 | $350.00 | $318.00 |
| 11 | Temp info signing (Z0030850) | SF | 105 | $18.00 | $18.00 | $18.00 |
| 12 | Matl transfer device (Z0034105) | TON | 27,446 | $4.24 | $20.00 | $3.75 |
| 13 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 14 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 15 | Earth excavation (20200100) | CY | 5 | $103.91 | $85.00 | $320.00 |
| 16 | Topsoil F & P 4 (21101615) | SY | 40 | $9.00 | $9.00 | $9.00 |
| 17 | Sodding salt tolerant (25200110) | SY | 40 | $90.00 | $81.00 | $90.00 |
| 18 | Supple watering (25200200) | UNIT | 0.20 | $0.05 | $0.01 | $0.10 |
| 19 | Bit matls tack CT (40600290) | LB | 140,338 | $0.10 | $0.01 | $0.01 |
| 20 | Long joint sealant (40600370) | LF | 116,529 | $2.64 | $2.45 | $2.66 |
| 21 | Mix CR JTS flangewys (40600400) | TON | 469 | $94.72 | $50.00 | $250.00 |
| 22 | HMA surf rem butt JT (40600982) | SY | 1,309 | $0.34 | $0.01 | $13.50 |
| 23 | HMA SC IL-9.5 D N70 (40604062) | TON | 7,484 | $95.34 | $85.00 | $85.00 |
| 24 | P SC SMA 12.5 F N80 (40605036) | TON | 27,446 | $115.64 | $112.00 | $114.00 |
| 25 | Protective coat (42001300) | SY | 40 | $1.11 | $3.00 | $15.00 |
| 26 | PC conc sidewalk 5 (42400200) | SF | 380 | $13.70 | $16.00 | $13.50 |
| 27 | Detectable warnings (42400800) | SF | 90 | $34.41 | $55.00 | $35.00 |
| 28 | HMA surf rem 2 (44000157) | SY | 311,861 | $2.94 | $2.75 | $2.40 |
| 29 | Comb curb gutter rem (44000500) | LF | 155 | $25.00 | $10.00 | $25.00 |
| 30 | Sidewalk rem (44000600) | SF | 380 | $2.50 | $5.00 | $2.50 |
| 31 | Median removal (44003100) | SF | 90 | $5.00 | $10.00 | $5.00 |
| 32 | CL D patch T2 12 (44201789) | SY | 750 | $125.00 | $40.00 | $145.00 |
| 33 | CL D patch T3 12 (44201794) | SY | 450 | $112.00 | $40.00 | $140.00 |
| 34 | CL D patch T4 12 (44201796) | SY | 305 | $100.00 | $40.00 | $140.00 |
| 35 | Agg wedge SHLD type B (48102100) | TON | 867 | $35.04 | $23.00 | $48.00 |
| 36 | Inlets reconst (60262700) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 |
| 37 | FR & lids adjust (60300305) | EACH | 4 | $550.00 | $550.00 | $550.00 |
| 38 | FR & grates T11 (60404800) | EACH | 2 | $650.00 | $650.00 | $650.00 |
| 39 | FR & grates T24 (60404950) | EACH | 2 | $585.00 | $585.00 | $585.00 |
| 40 | FR & lids T1 OL (60406000) | EACH | 1 | $450.00 | $450.00 | $450.00 |
| 41 | FR & lids T1 CL (60406100) | EACH | 1 | $450.00 | $450.00 | $450.00 |
| 42 | Comb CC&G TB6.12 (60603800) | LF | 75 | $50.64 | $60.00 | $43.00 |
| 43 | Comb CC&G TY B-6.24 (60605000) | LF | 80 | $67.12 | $80.00 | $46.00 |
| 44 | Conc med TSB6.06 (60619200) | SF | 90 | $24.72 | $18.00 | $23.00 |
| 45 | SPBGR TY A 6FT posts (63000001) | LF | 25 | $62.92 | $63.00 | $62.92 |
| 46 | Traf bar term T2 (63100045) | EACH | 1 | $1,910.00 | $1,910.00 | $1,910.00 |
| 47 | Guardrail remov (63200310) | LF | 25 | $18.00 | $18.00 | $18.00 |
| 48 | Non SPL waste disposl (66900200) | CY | 5 | $150.26 | $165.00 | $340.00 |
| 49 | Soil disposal analy (66900530) | EACH | 2 | $1,680.00 | $1,450.00 | $1,680.00 |
| 50 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,100.00 | $3,400.00 |
| 51 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 | $500.00 |
| 52 | Reg sub mon (66901006) | CAL DAY | 3 | $700.00 | $680.00 | $700.00 |
| 53 | Engr field office A (67000400) | CAL MO | 12 | $2,500.00 | $3,300.00 | $4,200.00 |
| 54 | Mobilization (67100100) | LS | 1 | $390,475 | $400,000 | $399,000 |
| 55 | Traf cont-prot 701306 (70100460) | LS | 1 | $6,000.00 | $3,900.00 | $1.00 |
| 56 | TR cont & prot 701601 (70102630) | LS | 1 | $60,000 | $149,400 | $353,400 |
| 57 | TR cont & prot 701701 (70102635) | LS | 1 | $2,000.00 | $1,150.00 | $1,150.00 |
| 58 | TR cont & prot 701801 (70102640) | LS | 1 | $6,000.00 | $4,225.00 | $4,225.00 |
| 59 | Short term pavt mking (70300100) | LF | 100,920 | $0.01 | $0.01 | $0.01 |
| 60 | SHRT TRM pavt MK rem (70300150) | SF | 33,640 | $0.01 | $0.01 | $0.01 |
| 61 | Temp PVT MK LTR & sym paint (70300211) | SF | 11,960 | $1.20 | $0.01 | $0.01 |
| 62 | Temp PVT MK line 4 - paint (70300221) | LF | 138,080 | $0.20 | $0.01 | $0.01 |
| 63 | Temp PVT MK line 6 - paint (70300241) | LF | 37,800 | $0.30 | $0.01 | $0.01 |
| 64 | Temp PVT MK line 8 - paint (70300251) | LF | 33,140 | $0.40 | $0.01 | $0.01 |
| 65 | Temp PVT MK line 12 - paint (70300261) | LF | 51,540 | $0.60 | $0.01 | $0.01 |
| 66 | Temp PVT MK line 24 - paint (70300281) | LF | 4,140 | $1.20 | $0.01 | $0.01 |
| 67 | THPL PVT MK LTR & sym (78000100) | SF | 5,980 | $5.75 | $5.75 | $4.15 |
| 68 | THPL PVT MK line 4 (78000200) | LF | 69,040 | $0.60 | $0.60 | $0.60 |
| 69 | THPL PVT MK line 6 (78000400) | LF | 18,900 | $0.70 | $0.70 | $0.98 |
| 70 | THPL PVT MK line 8 (78000500) | LF | 16,570 | $1.45 | $1.45 | $1.30 |
| 71 | THPL PVT MK line 12 (78000600) | LF | 25,770 | $1.95 | $1.95 | $1.95 |
| 72 | THPL PVT MK line 24 (78000650) | LF | 2,070 | $5.75 | $5.75 | $4.15 |
| 73 | Raised refl pavt MKR (78100100) | EACH | 2,376 | $30.00 | $30.00 | $30.00 |
| 74 | Grdrail ref type A (78200005) | EACH | 2 | $20.00 | $20.00 | $20.00 |
| 75 | Raised ref PVT MK rem (78300200) | EACH | 2,376 | $11.58 | $12.80 | $11.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.