IDOT contract 62V58 bid tabulation
Section FAP. Let by Illinois DOT on June 13, 2025, Lake, District 01. 2 bids received; low bid $3,524,201 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 95
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $3,524,201 | Low |
| 2 | Payne & Dolan, Inc. | $4,562,141 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Payne & Dolan, Inc. |
|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $2,500.00 | $3,250.00 |
| 2 | Serv instl GR MT MTR (X1400150) | EACH | 2 | $11,215 | $11,215 |
| 3 | Tree limb rem 4-10 (X2010100) | EACH | 5 | $95.00 | $200.00 |
| 4 | Tree limb rem over 10 (X2010200) | EACH | 1 | $110.00 | $400.00 |
| 5 | Tree remov acres SPL (X2010350) | ACRE | 0.10 | $15,000 | $36,000 |
| 6 | Selective clearing (X2010516) | UNIT | 3.30 | $500.00 | $1,000.00 |
| 7 | Grading & shap SHLDRS (X2020110) | UNIT | 5.50 | $1,200.00 | $1,100.00 |
| 8 | CC&G RMVL repl < = 10 (X4400501) | LF | 225 | $110.00 | $160.00 |
| 9 | CC&G RMVL repl > 10FT (X4400503) | LF | 220 | $110.00 | $160.00 |
| 10 | SS cleaned 12 (X5537800) | LF | 90 | $10.00 | $1.00 |
| 11 | FR & lids adjust SPL (X6030310) | EACH | 2 | $3,000.00 | $6,200.00 |
| 12 | Centerln rum strip 16 (X6420114) | LF | 3,771 | $1.05 | $1.35 |
| 13 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $1,000.00 | $2,600.00 |
| 14 | Temp info signing (X7200061) | SF | 177 | $25.00 | $25.00 |
| 15 | HS THPL PM LN 4 (X7800815) | LF | 7,541 | $0.94 | $1.00 |
| 16 | Drainage STR cleaned (Z0018500) | EACH | 6 | $375.00 | $450.00 |
| 17 | Tree remov over 15 (20100210) | UNIT | 68 | $45.00 | $70.00 |
| 18 | Earth excavation (20200100) | CY | 4,974 | $111.35 | $124.00 |
| 19 | Rem & disp uns matl (20201200) | CY | 498 | $92.00 | $124.00 |
| 20 | Topsoil F & P 4 (21101615) | SY | 701 | $6.00 | $12.00 |
| 21 | Grading & shap ditch (21400100) | LF | 625 | $56.00 | $28.00 |
| 22 | Erosion contr blanket (25100630) | SY | 695 | $1.40 | $2.00 |
| 23 | Sodding salt tolerant (25200110) | SY | 701 | $22.00 | $20.00 |
| 24 | Supple watering (25200200) | UNIT | 35.10 | $0.01 | $1.00 |
| 25 | Temp eros contr seed (28000250) | LB | 196.10 | $5.00 | $5.00 |
| 26 | Inlet filters (28000510) | EACH | 2 | $221.00 | $225.00 |
| 27 | Agg subgrade improve (30300001) | CY | 541 | $78.65 | $115.00 |
| 28 | Agg subgrade impr 12 (30300112) | SY | 9,877 | $57.00 | $45.00 |
| 29 | Agg base cse B (35101400) | TON | 2 | $150.00 | $45.00 |
| 30 | HMA BC wid 8 1/4 (35600709) | SY | 8,115 | $44.20 | $50.00 |
| 31 | Bit matls PR CT (40600275) | LB | 18,275 | $0.01 | $0.01 |
| 32 | Bit matls tack CT (40600290) | LB | 24,564 | $0.01 | $0.10 |
| 33 | Long joint sealant (40600370) | LF | 19,033 | $3.75 | $2.85 |
| 34 | Mix CR JTS flangewys (40600400) | TON | 24 | $825.00 | $430.00 |
| 35 | HMA surf rem butt JT (40600982) | SY | 319 | $1.00 | $0.10 |
| 36 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 5,748 | $120.00 | $145.00 |
| 37 | Protective coat (42001300) | SY | 147 | $3.00 | $0.10 |
| 38 | PC conc sidewalk 5 (42400200) | SF | 180 | $40.00 | $45.00 |
| 39 | Detectable warnings (42400800) | SF | 20 | $75.00 | $90.00 |
| 40 | Pavement rem (44000100) | SY | 3,173 | $18.80 | $60.00 |
| 41 | HMA surf rem 1 3/4 (44000156) | SY | 50,530 | $2.70 | $3.96 |
| 42 | Sidewalk rem (44000600) | SF | 180 | $15.00 | $20.90 |
| 43 | CL D patch T1 10 (44201761) | SY | 50 | $40.00 | $155.00 |
| 44 | CL D patch T2 10 (44201765) | SY | 250 | $40.00 | $125.00 |
| 45 | CL D patch T3 10 (44201769) | SY | 250 | $40.00 | $125.00 |
| 46 | CL D patch T4 10 (44201771) | SY | 250 | $40.00 | $110.00 |
| 47 | Agg wedge SHLD type B (48102100) | TON | 1,570 | $25.00 | $90.00 |
| 48 | Man adjust (60255500) | EACH | 2 | $1,400.00 | $1,500.00 |
| 49 | Valve box adj (60266600) | EACH | 1 | $1,300.00 | $1,500.00 |
| 50 | Pipe culv cleaned 12 (60920012) | LF | 600 | $5.50 | $5.00 |
| 51 | Pipe culv cleaned 15 (60920015) | LF | 700 | $5.50 | $6.00 |
| 52 | Pipe culv cleaned 18 (60920018) | LF | 700 | $6.00 | $7.00 |
| 53 | Rem RE-E T B term T1 (63301990) | EACH | 1 | $5,206.15 | $5,900.00 |
| 54 | Shoulder rum strip 8 (64200108) | LF | 11,563 | $1.05 | $0.45 |
| 55 | Non SPL waste disposl (66900200) | CY | 4,974 | $0.01 | $0.55 |
| 56 | Soil disposal analy (66900530) | EACH | 20 | $850.00 | $1,350.00 |
| 57 | Reg sub P-const plan (66901001) | LS | 1 | $7,000.00 | $3,350.00 |
| 58 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 |
| 59 | Reg sub mon (66901006) | CAL DAY | 20 | $750.00 | $700.00 |
| 60 | Mobilization (67100100) | LS | 1 | $279,240 | $777,000 |
| 61 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $100.00 |
| 62 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $100.00 |
| 63 | TR cont & prot 701501 (70102620) | LS | 1 | $100,100 | $100.00 |
| 64 | TR cont & prot 701502 (70102622) | LS | 1 | $100.00 | $100.00 |
| 65 | TR cont & prot 701602 (70102632) | LS | 1 | $32,400 | $18,300 |
| 66 | TR cont & prot 701611 (70102634) | LS | 1 | $100.00 | $100.00 |
| 67 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $100.00 |
| 68 | Short term pavt mking (70300100) | LF | 113,602 | $0.01 | $0.01 |
| 69 | SHRT TRM pavt MK rem (70300150) | SF | 58,600 | $0.01 | $0.01 |
| 70 | Temp PVT MK LTR & sym paint (70300211) | SF | 613 | $0.01 | $1.35 |
| 71 | Temp PVT MK line 4 - paint (70300221) | LF | 52,853 | $0.01 | $0.45 |
| 72 | Temp PVT MK line 6 - paint (70300241) | LF | 2,413 | $0.01 | $0.70 |
| 73 | Temp PVT MK line 8 - paint (70300251) | LF | 262 | $0.01 | $0.90 |
| 74 | Temp PVT MK line 12 - paint (70300261) | LF | 1,048 | $0.01 | $1.35 |
| 75 | Temp PVT MK line 24 - paint (70300281) | LF | 226 | $0.01 | $2.70 |
| 76 | Temp PVT MK L4 T4 tape (70307120) | LF | 56,801 | $0.01 | $1.25 |
| 77 | Rem & rel sign panel T1 (72400735) | SF | 9 | $50.00 | $50.00 |
| 78 | Teles STL sin support (72800100) | LF | 13 | $18.00 | $18.00 |
| 79 | THPL PVT MK LTR & sym (78000100) | SF | 613 | $4.00 | $4.00 |
| 80 | THPL PVT MK line 4 (78000200) | LF | 45,313 | $0.84 | $0.90 |
| 81 | THPL PVT MK line 6 (78000400) | LF | 2,413 | $1.30 | $1.30 |
| 82 | THPL PVT MK line 8 (78000500) | LF | 620 | $1.75 | $1.75 |
| 83 | THPL PVT MK line 12 (78000600) | LF | 1,048 | $2.60 | $2.60 |
| 84 | THPL PVT MK line 24 (78000650) | LF | 226 | $5.20 | $5.20 |
| 85 | Raised refl pavt MKR (78100100) | EACH | 426 | $46.95 | $46.95 |
| 86 | Raised ref PVT MK rem (78300200) | EACH | 426 | $17.50 | $13.50 |
| 87 | Main EX TR sig instal (85000200) | EACH | 2 | $26,400 | $26,400 |
| 88 | Elcbl C lead 14 1PR (87301305) | LF | 800 | $7.90 | $7.90 |
| 89 | Elcbl C serv 6 2C (87301805) | LF | 55 | $9.80 | $9.80 |
| 90 | Elcbl C egrdc 6 1C (87301900) | LF | 55 | $8.40 | $8.40 |
| 91 | Conc FDN TY A (87800100) | LF | 8 | $757.80 | $757.80 |
| 92 | Inductive loop detect (88500100) | EACH | 2 | $1,455.00 | $1,455.00 |
| 93 | Det loop T1 (88600100) | LF | 1,620 | $40.20 | $40.20 |
| 94 | Remov EX TS equip (89502375) | EACH | 2 | $3,520.00 | $3,520.00 |
| 95 | Rebuild EX handhole (89502376) | EACH | 2 | $6,373.00 | $6,373.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.