IDOT contract 62W33 bid tabulation
Section 2023-916-RS,SW,FL. Let by Illinois DOT on January 16, 2026, Cook, District 01. 2 bids received; low bid $7,521,180 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 125
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $7,521,180 | Low |
| 2 | D. Construction, Inc. | $8,685,412 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation | 2. D. Construction, Inc. |
|---|---|---|---|---|---|
| 1 | Washout basin (X0326806) | LS | 1 | $500.00 | $3,000.00 |
| 2 | HMA driveway pavt 10 (X4060294) | SY | 18 | $265.00 | $85.00 |
| 3 | Abandon & fill EX SS (X5509900) | LF | 122 | $48.50 | $46.00 |
| 4 | SS cleaned 8 (X5537600) | LF | 70 | $1.00 | $10.00 |
| 5 | SS cleaned 12 (X5537800) | LF | 70 | $1.00 | $10.00 |
| 6 | SS cleaned 15 (X5537900) | LF | 70 | $1.00 | $10.00 |
| 7 | Man TA 10 dia T1F CL (X6022110) | EACH | 2 | $39,000 | $31,450 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 22 | $1,250.00 | $950.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $90,000 | $82,250 |
| 10 | Temp info signing (X7200061) | SF | 103 | $36.25 | $30.00 |
| 11 | Detour signing (X7200203) | LS | 1 | $16,050 | $0.01 |
| 12 | Temp TR signal timing (X8900104) | EACH | 5 | $775.00 | $1,200.00 |
| 13 | Stab constr entrance (Z0013797) | SY | 53 | $22.00 | $0.01 |
| 14 | Construction layout (Z0013798) | LS | 1 | $25,000 | $40,000 |
| 15 | Drainage STR cleaned (Z0018500) | EACH | 21 | $365.00 | $488.89 |
| 16 | RR prot liability ins (Z0048665) | LS | 1 | $9,000.00 | $8,000.00 |
| 17 | SS 2 wat MN 12 (Z0056668) | LF | 10 | $165.00 | $210.00 |
| 18 | SS 2 wat MN 24 (Z0056672) | LF | 14 | $175.00 | $341.00 |
| 19 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 21 | Tree root pruning (20101200) | EACH | 5 | $207.50 | $200.00 |
| 22 | Earth excavation (20200100) | CY | 547 | $48.00 | $50.00 |
| 23 | Rem & disp uns matl (20201200) | CY | 150 | $33.00 | $50.00 |
| 24 | Trench backfill (20800150) | CY | 3,413 | $60.00 | $55.00 |
| 25 | Geotech fab F/GR stab (21001000) | SY | 437 | $2.55 | $5.00 |
| 26 | Topsoil exc & plac (21101505) | CY | 113 | $46.00 | $35.00 |
| 27 | Topsoil F & P 6 (21101625) | SY | 654 | $10.35 | $17.78 |
| 28 | Grading & shap ditch (21400100) | LF | 100 | $6.00 | $40.00 |
| 29 | Seeding CL 2A (25000210) | ACRE | 0.16 | $8,075.00 | $8,333.25 |
| 30 | Seeding CL 4B (25000314) | ACRE | 0.07 | $20,750 | $20,000 |
| 31 | Nitrogen fert nutr (25000400) | LB | 15 | $5.15 | $3.33 |
| 32 | Potassium fert nutr (25000600) | LB | 15 | $5.15 | $3.33 |
| 33 | Sodding salt tolerant (25200110) | SY | 192 | $26.00 | $54.44 |
| 34 | Supple watering (25200200) | UNIT | 1 | $0.10 | $44.44 |
| 35 | Temp eros contr seed (28000250) | LB | 3 | $10.35 | $44.44 |
| 36 | Temp ditch checks (28000305) | LF | 30 | $10.35 | $16.67 |
| 37 | Perimeter eros bar (28000400) | LF | 2,620 | $3.00 | $3.89 |
| 38 | Inlet filters (28000510) | EACH | 30 | $215.00 | $288.89 |
| 39 | Temp eros contr blank (28001100) | SY | 1,228 | $1.05 | $2.17 |
| 40 | Stone riprap CL A5 (28100109) | SY | 25 | $140.00 | $150.00 |
| 41 | Filter fabric (28200200) | SY | 25 | $2.00 | $10.00 |
| 42 | Agg subgrade improve (30300001) | CY | 150 | $70.00 | $55.00 |
| 43 | Agg subgrade impr 12 (30300112) | SY | 1,797 | $28.00 | $20.00 |
| 44 | Agg base cse B 4 (35101600) | SY | 566 | $25.00 | $9.00 |
| 45 | Agg base cse B 6 (35101800) | SY | 84 | $30.00 | $12.00 |
| 46 | Bit matls PR CT (40600275) | LB | 440 | $0.01 | $0.01 |
| 47 | Bit matls tack CT (40600290) | LB | 8,496 | $0.01 | $0.01 |
| 48 | Long joint sealant (40600370) | LF | 5,327 | $3.75 | $6.00 |
| 49 | Mix CR JTS flangewys (40600400) | TON | 17 | $0.01 | $0.01 |
| 50 | HMA surf rem butt JT (40600982) | SY | 117 | $0.01 | $25.00 |
| 51 | HMA BC IL-19.0 N70 (40603085) | TON | 437 | $122.50 | $82.50 |
| 52 | P HMA BC IL-4.75 N50 (40603200) | TON | 501 | $129.50 | $105.00 |
| 53 | HMA SC IL-9.5 D N50 (40604060) | TON | 14 | $375.00 | $300.00 |
| 54 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,201 | $90.00 | $85.00 |
| 55 | PCC PVT 8 1/2 jointd (42000311) | SY | 770 | $105.00 | $95.00 |
| 56 | Protective coat (42001300) | SY | 1,520 | $0.01 | $3.00 |
| 57 | PC conc sidewalk 5 (42400200) | SF | 4,338 | $10.50 | $12.00 |
| 58 | Detectable warnings (42400800) | SF | 224 | $31.00 | $35.00 |
| 59 | Pavement rem (44000100) | SY | 2,093 | $18.50 | $15.00 |
| 60 | HMA surf rem 2 1/2 (44000159) | SY | 11,336 | $4.00 | $3.00 |
| 61 | Drive pavement rem (44000200) | SY | 19 | $30.00 | $20.00 |
| 62 | Comb curb gutter rem (44000500) | LF | 1,550 | $19.00 | $10.00 |
| 63 | Sidewalk rem (44000600) | SF | 4,184 | $2.15 | $3.00 |
| 64 | CL D patch T1 10 (44201761) | SY | 227 | $179.00 | $110.00 |
| 65 | CL D patch T2 10 (44201765) | SY | 287 | $155.00 | $110.00 |
| 66 | CL D patch T3 10 (44201769) | SY | 396 | $145.00 | $110.00 |
| 67 | CL D patch T4 10 (44201771) | SY | 945 | $127.00 | $110.00 |
| 68 | Aggregate SHLDS B 6 (48101500) | SY | 418 | $13.25 | $18.00 |
| 69 | PRC flar end sec 42 (54213687) | EACH | 1 | $5,025.00 | $3,600.00 |
| 70 | Storm sew CL A 2 12 (550A0340) | LF | 214 | $145.00 | $93.00 |
| 71 | Storm sew CL A 2 24 (550A0410) | LF | 84 | $141.00 | $122.00 |
| 72 | Storm sew CL A 2 36 (550A0450) | LF | 50 | $166.00 | $169.00 |
| 73 | Storm sew CL A 2 42 (550A0470) | LF | 57 | $211.00 | $188.00 |
| 74 | Storm sew CL A 2 48 (550A0480) | LF | 30 | $254.00 | $295.00 |
| 75 | Storm sew CL A 2 54 (550A0490) | LF | 8 | $939.00 | $330.00 |
| 76 | SS CL A 2 eqrs 48 (550A5510) | LF | 285 | $422.00 | $362.00 |
| 77 | Storm sewer rem 6 (55100200) | LF | 5 | $19.50 | $100.00 |
| 78 | Storm sewer rem 8 (55100300) | LF | 102 | $38.50 | $20.00 |
| 79 | Storm sewer rem 15 (55100700) | LF | 232 | $19.50 | $20.00 |
| 80 | Storm sewer rem 24 (55101200) | LF | 103 | $28.00 | $30.00 |
| 81 | Storm sewer rem 54 (55102000) | LF | 14 | $105.00 | $200.00 |
| 82 | Storm sewers JKD 48 (55201600) | LF | 1,608 | $2,500.00 | $2,753.00 |
| 83 | Storm sewers JKD 54 (55201700) | LF | 320 | $0.01 | $2,876.00 |
| 84 | Storm sewers JKD 60 (55201800) | LF | 255 | $2,975.00 | $3,025.50 |
| 85 | Pipe underdr T 1 4 (60108104) | LF | 686 | $25.50 | $20.00 |
| 86 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $4,715.00 | $4,700.00 |
| 87 | Man TA 6 dia T1F CL (60223800) | EACH | 4 | $13,275 | $14,250 |
| 88 | Man TA 7 dia T1F CL (60224446) | EACH | 4 | $15,845 | $1,600.00 |
| 89 | Man TA 8 dia T1F CL (60224459) | EACH | 3 | $19,050 | $20,750 |
| 90 | Man TA 9 dia T1F CL (60224469) | EACH | 1 | $24,150 | $20,100 |
| 91 | Inlets TA T11F&G (60236800) | EACH | 8 | $2,195.00 | $2,600.00 |
| 92 | FR & lids adjust (60300305) | EACH | 4 | $350.00 | $950.00 |
| 93 | Valve box frames adj (60300405) | EACH | 8 | $350.00 | $500.00 |
| 94 | Remov manholes (60500040) | EACH | 1 | $850.00 | $1,500.00 |
| 95 | Remov catch bas (60500050) | EACH | 7 | $850.00 | $1,250.00 |
| 96 | Remov inlets (60500060) | EACH | 1 | $575.00 | $1,000.00 |
| 97 | Comb CC&G TB6.12 (60603800) | LF | 893 | $38.00 | $34.00 |
| 98 | Comb CC&G TY B-6.24 (60605000) | LF | 246 | $52.50 | $45.00 |
| 99 | Comb CC&G TM6.12 (60609200) | LF | 409 | $60.00 | $34.00 |
| 100 | Non SPL waste disposl (66900200) | CY | 2,500 | $90.50 | $80.00 |
| 101 | Soil disposal analy (66900530) | EACH | 5 | $1,525.00 | $1,650.00 |
| 102 | Reg sub P-const plan (66901001) | LS | 1 | $3,625.00 | $2,500.00 |
| 103 | Reg sub F con report (66901003) | LS | 1 | $3,105.00 | $2,500.00 |
| 104 | Reg sub mon (66901006) | CAL DAY | 45 | $1,025.00 | $950.00 |
| 105 | Mobilization (67100100) | LS | 1 | $450,000 | $521,000 |
| 106 | Changeable message SN (70107025) | CAL DAY | 14 | $103.50 | $150.00 |
| 107 | SHRT TRM pavt MK rem (70300150) | SF | 1,863 | $0.01 | $2.00 |
| 108 | Temp PVT MK L4 T4 tape (70307120) | LF | 5,050 | $0.01 | $2.00 |
| 109 | Temp conc barrier (70400100) | LF | 300 | $40.50 | $35.00 |
| 110 | Imp attn temp NRD TL2 (70600240) | EACH | 2 | $1,625.00 | $6,000.00 |
| 111 | Sign panel T1 (72000100) | SF | 9 | $46.50 | $33.00 |
| 112 | Rem & rel sign panel asmbly TA (72400205) | EACH | 2 | $233.00 | $440.00 |
| 113 | Metal post TY A (72900100) | LF | 12 | $18.65 | $1.75 |
| 114 | THPL PVT MK LTR & sym (78000100) | SF | 428 | $5.70 | $6.11 |
| 115 | THPL PVT MK line 4 (78000200) | LF | 7,132 | $0.75 | $0.83 |
| 116 | THPL PVT MK line 6 (78000400) | LF | 3,333 | $1.55 | $1.67 |
| 117 | THPL PVT MK line 12 (78000600) | LF | 929 | $3.65 | $3.89 |
| 118 | THPL PVT MK line 24 (78000650) | LF | 66 | $5.70 | $6.11 |
| 119 | Mod ureth PM LTR-sym (78009000) | SF | 20 | $26.00 | $27.78 |
| 120 | Mod ureth PM line 4 (78009004) | LF | 373 | $3.90 | $4.17 |
| 121 | Mod ureth PM line 6 (78009006) | LF | 343 | $5.85 | $6.28 |
| 122 | Mod ureth PM line 12 (78009012) | LF | 10 | $11.65 | $12.50 |
| 123 | Raised refl pavt MKR (78100100) | EACH | 170 | $46.50 | $50.00 |
| 124 | Raised ref PVT MK rem (78300200) | EACH | 155 | $0.01 | $10.00 |
| 125 | PVT MKG rem WTR blast (78300202) | SF | 315 | $0.01 | $14.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.