IDOT contract 62X64 bid tabulation
Section 2024-1018-RS. Let by Illinois DOT on June 13, 2025, Cook, District 01. 2 bids received; low bid $511,057 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 48
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $511,057 | Low |
| 2 | A Lamp Concrete Contractors, Inc. | $598,079 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. A Lamp Concrete Contractors, Inc. |
|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 47 | $120.00 | $685.00 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 150 | $65.00 | $80.00 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 450 | $60.00 | $57.00 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,300.00 | $3,500.00 |
| 5 | Temp info signing (X7200061) | SF | 77.10 | $35.00 | $18.00 |
| 6 | Det loop repl (X8860105) | LF | 66 | $69.10 | $70.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $3,200.00 | $5,000.00 |
| 8 | Earth excavation (20200100) | CY | 70 | $20.00 | $62.00 |
| 9 | Topsoil F & P 4 (21101615) | SY | 58 | $45.00 | $11.25 |
| 10 | Sodding salt tolerant (25200110) | SY | 58 | $35.00 | $36.50 |
| 11 | Supple watering (25200200) | UNIT | 2 | $320.00 | $500.00 |
| 12 | HMA base cse 6 (35501308) | SY | 10 | $215.00 | $130.00 |
| 13 | HMA base cse 8 (35501316) | SY | 24 | $285.00 | $130.00 |
| 14 | Bit matls tack CT (40600290) | LB | 4,983 | $0.01 | $0.01 |
| 15 | Long joint sealant (40600370) | LF | 4,602 | $4.75 | $4.50 |
| 16 | Mix CR JTS flangewys (40600400) | TON | 17 | $50.00 | $500.00 |
| 17 | HMA surf rem butt JT (40600982) | SY | 20 | $0.01 | $25.00 |
| 18 | HMA SC IL-9.5 D N50 (40604060) | TON | 4 | $595.00 | $495.00 |
| 19 | HMA SC IL-9.5 D N70 (40604062) | TON | 931 | $103.00 | $101.00 |
| 20 | PCC driveway pavt 8 (42300400) | SY | 150 | $125.00 | $133.00 |
| 21 | HMA surf rem 1 1/2 (44000155) | SY | 11,073 | $2.45 | $2.05 |
| 22 | Drive pavement rem (44000200) | SY | 42 | $25.00 | $63.00 |
| 23 | CL D patch T2 8 (44201741) | SY | 200 | $81.00 | $99.00 |
| 24 | CL D patch T3 8 (44201745) | SY | 100 | $81.00 | $106.00 |
| 25 | CL D patch T4 8 (44201747) | SY | 1,000 | $81.00 | $77.00 |
| 26 | Agg wedge SHLD type B (48102100) | TON | 93 | $125.00 | $62.00 |
| 27 | Non SPL waste disposl (66900200) | CY | 70 | $100.00 | $89.00 |
| 28 | Soil disposal analy (66900530) | EACH | 5 | $970.00 | $970.00 |
| 29 | Reg sub P-const plan (66901001) | LS | 1 | $5,900.00 | $5,900.00 |
| 30 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 |
| 31 | Reg sub mon (66901006) | CAL DAY | 10 | $100.00 | $700.00 |
| 32 | Mobilization (67100100) | LS | 1 | $30,000 | $35,000 |
| 33 | TR cont & prot 701501 (70102620) | LS | 1 | $17,900 | $77,000 |
| 34 | TR cont & prot 701601 (70102630) | LS | 1 | $17,900 | $2,492.00 |
| 35 | TR cont & prot 701701 (70102635) | LS | 1 | $500.00 | $2,492.00 |
| 36 | Short term pavt mking (70300100) | LF | 3,163 | $1.00 | $0.35 |
| 37 | SHRT TRM pavt MK rem (70300150) | SF | 1,053 | $2.00 | $1.00 |
| 38 | Temp PVT MK LTR & sym paint (70300211) | SF | 64 | $2.00 | $1.75 |
| 39 | Temp PVT MK line 4 - paint (70300221) | LF | 18,408 | $0.33 | $0.35 |
| 40 | Temp PVT MK line 6 - paint (70300241) | LF | 40 | $0.35 | $0.53 |
| 41 | Temp PVT MK line 24 - paint (70300281) | LF | 10 | $2.00 | $1.60 |
| 42 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,053 | $2.65 | $1.25 |
| 43 | THPL PVT MK LTR & sym (78000100) | SF | 64 | $6.00 | $6.00 |
| 44 | THPL PVT MK line 4 (78000200) | LF | 18,408 | $0.66 | $0.88 |
| 45 | THPL PVT MK line 6 (78000400) | LF | 40 | $1.25 | $1.50 |
| 46 | THPL PVT MK line 24 (78000650) | LF | 10 | $6.00 | $6.00 |
| 47 | Raised refl pavt MKR (78100100) | EACH | 114 | $48.00 | $70.00 |
| 48 | Raised ref PVT MK rem (78300200) | EACH | 90 | $1.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.